Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · TEMPORARY CANTILEVERED PLATFORM AS PER DRAWINGS. CANTILEVERED PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Mechanical Systems · HUB Consultation conducted on 6/24/25. Application filed to install sub membrane depressurization system in conjunction with new building construction.
No product keyword matched · NYC DOB building permits
Sprinklers · PROPOSED TO CUT, CAP AND DEMOLISH SPRINKLER SYSTEM IN CONJUNCTION WITH FULL DEMO JOB # Q01306947. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Sprinklers · PROPOSED TO CUT, CAP AND DEMOLISH SPRINKLER SYSTEM IN CONJUNCTION WITH FULL DEMO JOB # Q01262467. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits