Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | JAVA BUILDERS INC NYC DOB building permits | 11 | Suspended Scaffold · Suspended scaffold out rigger system for facade repair works . No product keyword matched | 1 | Oct 19, 2026 |
| B | ROWE CONSULTING INC NYC DOB building permits | 11 |
Plumbing · INSTALLATION OF PLUMBING FIXTURE FOR ONE FAMILY HOUSE. THIS APPLICATION IS INCONJUNCTION WITHTHE APPLICATION# 440620963. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS S INVOLVED UNDER THIS APPLICATION. No product keyword matched |
| 1 |
| Oct 19, 2026 |
| B | ANGELA PITARRESE NYC DOB building permits | 11 | General Construction · Proposed legalization of two (2) installed windows on the second floor of the premises to comply with ECB violation # 39170959P. No product keyword matched | 1 | Oct 19, 2026 |
| B | SULLA TERRA DEVELOPMENTS NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION TO APARTMENT NUMBER 11K. NO CHANHE OF USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 19, 2026 |
| B | TAINO VENTURE USA LLC NYC DOB building permits | 11 | Plumbing · Respectfully request removal of gas cooktops, building gas hot water heater, tenant gas meters, existing tenant fixtures & associated piping. Install new tenant fixtures & associated piping, new house meter & tenant sub meters. No product keyword matched | 1 | Oct 19, 2026 |
| B | FM95NY LLC NYC DOB building permits | 11 | Structural · Sign attachment structural details of sign to structure CUBE Sign- (structure filed separately.) No change of use, egress or occupancy. No product keyword matched | 1 | Oct 19, 2026 |
| B | ML MANAGEMENT PARTNERS, LLC NYC DOB building permits | 11 | General Construction · Interior courtyard renovation as part of the 1st floor apartment. No change in use, egress or occupancy. All as per plans and applications. No product keyword matched | 1 | Oct 19, 2026 |
| B | THE CINEMAS NYC DOB building permits | 11 | Plumbing · MODIFICATIONS TO EXISTING PLUMBING SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 1 | Oct 19, 2026 |
| B | JOHN FARR P & H CORP NYC DOB building permits | 11 | Plumbing · ALTERATION HEREWITH FILED TO RESOLVE RCA#4A36177. PROPOSE TO LEGALIZE NEW (1) LAV. SINK AND (1) WATER CLOSET IN THE CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 19, 2026 |
| B | Carroll Gardens Landmark Condo NYC DOB building permits | 11 | General Construction · Filing to re-cover existing shingle roof tiles with new shingle roof tiles as per plans. No product keyword matched | 1 | Oct 19, 2026 |
| B | THE CONDOS AT NAVY GREEN NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 1 | Oct 19, 2026 |
| B | GREEN STAR ELECTL CONT IN NYC DOB electrical permits | 11 | ENTIRE, SUPERSEDE APPLICATION B00885890, B00885890-S1 No product keyword matched | 3 | Oct 19, 2026 |
| B | LEBO ELECTRIC LLC NYC DOB electrical permits | 11 | Install one (1) disconnect switch for the fire alarm control panel (FACP) in the ground-floor Intuit TurboTax space. No product keyword matched | 6 | Oct 19, 2026 |
| B | CROSSLAND MANAGEMENT & E NYC DOB electrical permits | 11 | upgrade a 100-amp service to 200 amps one family No product keyword matched | 4 | Oct 19, 2026 |
| B | ALL AROUND ELECTRIC CORP. NYC DOB electrical permits | 11 | General wiring for 2 family house No product keyword matched | 5 | Oct 19, 2026 |
| B | V&B ELECTRICAL CONTNG INC NYC DOB electrical permits | 11 | Permit # Q01346142 was filed incorrectly as a 1- family instead of a 2- family. job already signed off No product keyword matched | 5 | Oct 19, 2026 |
| B | SEABRAVE ELECTRIC CORP NYC DOB electrical permits | 11 | General Electric No product keyword matched | 1 | Oct 19, 2026 |
| B | CHARISMA ELECL CONTS LLC NYC DOB electrical permits | 11 | rebuild service to include a new separate PLP meter No product keyword matched | 4 | Oct 19, 2026 |
| B | APOLLO ELECTRIC USA, INC NYC DOB electrical permits | 11 | GW No product keyword matched | 11 | Oct 19, 2026 |
| B | P.E. STONE INC NYC DOB electrical permits | 11 | PES JOB 26-059 SMBC 277 Park Ave, 4,5,6,16th Floors No product keyword matched | 1 | Oct 19, 2026 |
| B | EP ELECTRIC NY LLC NYC DOB electrical permits | 11 | Installing 12 EV Car Chargers No product keyword matched | 2 | Oct 19, 2026 |
| B | CSM ELECTRIC CORP. NYC DOB electrical permits | 11 | retail space first floor No product keyword matched | 4 | Oct 19, 2026 |
| B | SPARTAN ELECTRICAL OF NY NYC DOB electrical permits | 11 | The Installation of a Battery Energy Storage System (B.E.S.S) EPR #BX03290A2. This is the subsequent filing that covers the feeders and aux equipment for the battery storage system. No product keyword matched | 4 | Oct 19, 2026 |
| B | RAYON'S ELECTRICAL NYC DOB electrical permits | 11 | TO INSTALL 1 ADDITIONAL NEW METER FOR BASEMENT APARTMENT, 1 NEW 20CKT CIRCUIT BREAKER PANEL FOR BASEMENT APARTMENT, REMOVE AND REPLACE 1 EXISTING CIRCUIT BREAKER PANEL FOR 2ND FLOOR AND REPLACE WITH 1 NEW 20CKT CIRCUIT BREAKER PANEL, INSTALL 1 NEW 3 GANG 100AMP METER PAN, 7 SPLIT A/C UNITS WITH SEVEN 30AMP 2 POLE DISCONNECT SWITCHES. No product keyword matched | 1 | Oct 19, 2026 |
| B | REITER ELECTRIC, INC. NYC DOB electrical permits | 11 | TEMP LIGHTING RETAIL/CONCOURSE No product keyword matched | 1 | Oct 19, 2026 |
| B | IDEAL ELEC & HVAC CO INC NYC DOB electrical permits | 11 | partial gut renovation. New lighting outlets, new power outlets, new switches and dimmers. No product keyword matched | 2 | Oct 19, 2026 |
| B | ABM ELECTRIC, INC NYC DOB electrical permits | 11 | Provide power to IPDVS equipment . No product keyword matched | 1 | Oct 19, 2026 |
| B | WIZARD ELECTRICAL CONSTRU NYC DOB electrical permits | 11 | Install Branch Circuit wiring in the following locations: Basement 1-15 amp 120v unit with disconnect, Basement 1-20 Amp 220V hot water heater with double pole switch, Unit #2- 40 amp 220v unit with disconnect, Unit #3-60 Amp 220v unit with disconnect. No product keyword matched | 2 | Oct 19, 2026 |
| B | The City College of New York NYC DOB electrical permits | 11 | Install new L6-30 receptacles in MDF room No product keyword matched | 1 | Oct 19, 2026 |
| B | H.J. MARTIN ASSOC. INC. NYC DOB electrical permits | 11 | NEW ELECTRICAL OUTLETS AND LIGHTING FOR NEW EVENT SPACE No product keyword matched | 1 | Oct 19, 2026 |
| B | FRIED ELECTRIC CO. NYC DOB electrical permits | 11 | PERMIT TO CURE DOB VIOLATION #39201927J WORK WITHOUT A PERMIT ELECTRICAL WORK CONSISTING OF NEWLY INSTALLATION BX WIRING IN THE CEILING AND WALLS AND TWO AC SPLIT CONDENSERS MOUNTED TO THE UPPER WALL AT EXPOSURE #3 CONNECTED TO TWO ELECTRICAL BREAKER BOXES. WORKING IN GROUND FLOOR STORE ONLY. No product keyword matched | 17 | Oct 18, 2026 |
| B | SMART LINE ELECTRIC, LLC NYC DOB electrical permits | 11 | Install 3 30 amp single phase disconnect for outdoor A/C units Install 3 new 100 amp breaker boxes with service switches with breaker boxes Install 3 GFCI No product keyword matched | 3 | Oct 18, 2026 |
| B | EVERBRIGHT ELECTRIC INC NYC DOB electrical permits | 11 | Service Work Only No product keyword matched | 2 | Oct 18, 2026 |
| B | MAGNETIC ELECTRIC CORP NYC DOB electrical permits | 11 | General wiring apt. 5E . Install new panel and feeders. No product keyword matched | 2 | Oct 17, 2026 |
| B | VALENTIS ELECTRIC, INC. NYC DOB electrical permits | 11 | GENERAL WIRING APARTMENT 5E NEW PANEL EXISTING RISER No product keyword matched | 18 | Oct 17, 2026 |
| B | CANDELA SYSTEMS CORP DBA NYC DOB electrical permits | 11 | 12 Receptacle 200 Amp 3 phase Building B No product keyword matched | 2 | Oct 17, 2026 |
| B | ATLAS PRIME ELECTRIC LLC NYC DOB electrical permits | 11 | GENERAL WIRING FOR WORK ON THE ELECTRIC SERVICE EQUIPMENT..............REPLACE EXISTING SERVICE END BOX AND 2-100 AMPS SERVICE SWITCHES............RECONNECT THE EXISTING APARTMENT FEEDERS TO NEW SERVICE SWITCHES......................NO OTHER WORK BEING DONE IN THE HOUSE.............. No product keyword matched | 7 | Oct 17, 2026 |
| B | POWER TECH ELECTRIC CORP. NYC DOB electrical permits | 11 | INSTALLATION OF NEW 1600 AMP SERVICE EQUIPMENT No product keyword matched | 2 | Oct 17, 2026 |
| B | JUICED ELECTRIC CORP NYC DOB electrical permits | 11 | install dedicated line from electrical panel in apartment to the rooftop where unit will be installed No product keyword matched | 1 | Oct 17, 2026 |
| B | LATERRA DEVELOPERS LLC NYC DOB building permits | 11 | Structural · Proposed Alteration Of An Existing Two-Story One-Family Dwelling Into A Two-Story Two-Family Dwelling No product keyword matched | 10 | Oct 16, 2026 |
| B | HD CONTRACTORS CORP NYC DOB building permits | 11 | General Construction · EXTERIOR BRICK MASONRY WALL REPAIRS, EXTERIOR STEEL LINTEL REPLACEMENT, WINDOW PANE REPLACEMENT AND SILL REPAIR No product keyword matched | 8 | Oct 16, 2026 |
| B | PRIME PROPERTY MANAGEMENT NYC DOB building permits | 11 | Structural · STRUCTURAL SPECIFICATION FILED IN CONJUNCTION WITH GC APPLICATION #X00705350-I1 No product keyword matched | 1 | Oct 16, 2026 |
| B | LEO STYLE CORPORATION NYC DOB building permits | 11 | General Construction · FILING HEREWITH FOR THE INTERIOR RENOVATION TO LOBBY. THERE IS NOT CHANGE TO USE , EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 16, 2026 |
| B | ARMSTRONG ROOFING CORP NYC DOB building permits | 11 | Mechanical Systems · Installation of new HVAC system for proposed warehouse. No product keyword matched | 4 | Oct 16, 2026 |
| B | JCC CONSTRUCTION CORP NYC DOB building permits | 11 | Plumbing · On site storm drainage system for North building including drains, manholes and hydrodynamic separators discharging to new outfalls to Gowanus Canal. South building filed under B00611202-Z1. No product keyword matched | 1 | Oct 16, 2026 |
| B | THE JAY GROUP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND SHORING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 16, 2026 |
| B | RAYMOND'S PLBG & HTG LLC NYC DOB building permits | 11 | Plumbing · HEREWITH FILING ALTERATION IN CONJUNCTION WITH ALT # Q00943747-I1FOR PLUMBING WORK IN CELLAR, FIRST, AND SECOND AS PER PLANS FILED. No product keyword matched | 4 | Oct 16, 2026 |
| B | MANHATTAN CONSTRUCTION & NYC DOB building permits | 11 | General Construction · Proposed steel porch with concrete support columns. No change to use, egress or occupancy. No product keyword matched | 2 | Oct 16, 2026 |
| B | FIVE BORO ASSOCIATES INC NYC DOB building permits | 11 | Sprinklers · Remove existing Dry Pipe Valve, thus converting existing dry pipe fire sprinkler system to wet fire sprinkler system. Modify existing fire sprinkler system as per plans. No product keyword matched | 1 | Oct 16, 2026 |
| B | Colliers International NYC DOB building permits | 11 | Sign · ERECT ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL. SIGN ACCESSORY TO DIPTYQUE No product keyword matched | 5 | Oct 16, 2026 |