Install 3 30 amp single phase disconnect for outdoor A/C units Install 3 new 100 amp breaker boxes with service switches with breaker boxes Install 3 GFCI
Install 3 30 amp single phase disconnect for outdoor A/C units Install 3 new 100 amp breaker boxes with service switches with breaker boxes Install 3 GFCI
No product keyword matched · NYC DOB electrical permits
Existing 3 gang meter adding 1 new PLP meter and 1 new service switch. There is 2 existing 100 amp panels with service switch. 1 outdoor disconnect with service switch.
No product keyword matched · NYC DOB electrical permits
Installing 1 new 200 Amp 3 Phase METER and 1 new 200 AMP service switch for apartment. currently there is 10 meters removing 2 and upgrading to 1 single 200 amp service.
No product keyword matched · NYC DOB electrical permits
Installing 3 new meters, 3 new 100 amps panels 1 20 circuit sub panel on 1st floor 25 outlets 15 switches 15 lights 3 and 1 new 3 wire bx cable. PAA contractor needs to add 3 sets of up to 2 AWG conductors for a total of 4 installed, contactor needs to remove panels 2 for a total of 1 installed.
No product keyword matched · NYC DOB electrical permits