Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | C-2 Mechanical Services, LLC Austin issued construction permits | 5 | Mechanical Permit · ePlan: Commercial Expedited Review - Interior Remodel to Existing Warehouse Suite Scope of Work to Include Adding HVAC and Insulation in One Portion and Install High Pile Storage Racks and Coordinating Lightning in the other Portion (194338 SF). No product keyword matched | 1 | Sep 28, 2026 |
| C |
| Putman Electrical Service Austin issued construction permits |
| 5 |
Electrical Permit · ETJ
Relocate existing overhead service mounted on a Austin Energy utility pole to an existing Google low voltage distribution cabinet via an existing secondary riser. No product keyword matched |
| 2 |
| Sep 28, 2026 |
| C | RiverHill Commercial, LLC Austin issued construction permits | 5 | Building Permit · Demo and remodel of part of a wood structure office and exterior stair and landing damaged by tree falling on it. Intent is to build back to previous design and condition minor Electrical work signed off on by master electrician. Mechanical review requested for oversight- no mechanical scope. No product keyword matched | 1 | Sep 28, 2026 |
| C | Neely Electrical Service Company Austin issued construction permits | 5 | Electrical Permit · CHANGE OF USE OFFICE TO PERSONALSERVICE existing commercial suite with non structural interior work only aka paint. No electrical plumbing mechanical or structural work. There was no pre-existing CO for the suite. No product keyword matched | 1 | Sep 28, 2026 |
| C | D&L Electric Austin issued construction permits | 5 | Electrical Permit · Interior remodel for tenant occupancy combining two suites into a single suite. NO CHANGES TO OCCUPANCY TYPE OR EXTERIOR WORK. No mechanical scope. No access control. Deferred submittal requested for stairs. No product keyword matched | 1 | Sep 28, 2026 |
| C | Cadence McShane Construction Company Austin issued construction permits | 5 | Building Permit · TEMPORARY BUILDING PERMIT - Scope is limited to install new sports light pole foundations and poles. No product keyword matched | 1 | Sep 28, 2026 |
| C | Beyond Wow Plumbing Austin issued construction permits | 5 | Plumbing Permit · Replacement of an existing water heater Remove existing water heater and install new 50 gallon natural gas water heater upstairs in a water heater closet. No product keyword matched | 1 | Sep 28, 2026 |
| C | Stamport Plumbing Austin issued construction permits | 5 | Plumbing Permit · ETJ New construction community kitchen 900sqft No product keyword matched | 2 | Sep 28, 2026 |
| C | Trosich Construction Company Austin issued construction permits | 5 | Building Permit · Change of Use from Various (Photo Studio) to Retail - No remodel proposed. No product keyword matched | 2 | Sep 28, 2026 |
| C | OGH Development Austin issued construction permits | 5 | Building Permit · ePlan: Commercial Expedited Review - [APPROVED] First Time Finish Out for Floor 5 (16955 SF). No product keyword matched | 9 | Sep 28, 2026 |
| C | Efficient Force Electric LLC Austin issued construction permits | 5 | Electrical Permit · First tenant improvement for Buffalo wild wings 1270 SQFT. No product keyword matched | 1 | Sep 28, 2026 |
| C | Bacon Plumbing Inc Austin issued construction permits | 5 | Plumbing Permit · First-generation tenant build-out of existing shell building for dental office. No product keyword matched | 2 | Sep 28, 2026 |
| C | Silver Spur Construction LLC Austin issued construction permits | 5 | Building Permit · First-generation tenant build-out of existing shell building for dental office. No product keyword matched | 1 | Sep 28, 2026 |
| C | Clad Electrical LLC Austin issued construction permits | 5 | Electrical Permit · First-generation tenant build-out of existing shell building for dental office. No product keyword matched | 1 | Sep 28, 2026 |
| C | TG EdwardsConstruction Inc. Austin issued construction permits | 5 | Building Permit · New Construction of a 4 story office for R&D No product keyword matched | 1 | Sep 28, 2026 |
| C | MILLCON INC. Austin issued construction permits | 5 | Mechanical Permit · First tenant improvement for Buffalo wild wings 1270 SQFT. No product keyword matched | 1 | Sep 28, 2026 |
| C | Innovative Power & Design LLC Austin issued construction permits | 5 | Electrical Permit · I am installing a 400 amp wireway for a future tenant improvement. I am not installing the 400 amp AE meter can or disc. relocating 100 amp HP and installing the 6x6x4 WW from SDE. Per James Eperson I need a Stand Alone Permit
COA inspections OK to inspect project has been reviewed by MRT - Barrera
BLDG - E1 HP No product keyword matched | 1 | Sep 28, 2026 |
| C | Lakeland electric LLC Seattle electrical permits | 5 | temporary power pole · Electrical No product keyword matched | 4 | Sep 28, 2026 |
| C | PMA Electrical Contractor, Inc. Seattle electrical permits | 5 | Remove and replace apt. subpanel · Electrical No product keyword matched | 1 | Sep 28, 2026 |
| C | PRO-TECH ELECTRIC INC Seattle electrical permits | 5 | Providing connections to thermal detectors in hood fans. · Electrical No product keyword matched | 2 | Sep 28, 2026 |
| C | mvmcghee inc Seattle electrical permits | 5 | Installing new access control system/ burg alarm
Installing new cctv system using some existing wires · Electrical No product keyword matched | 2 | Sep 28, 2026 |
| C | NW Security & Sound LLC Seattle electrical permits | 5 | Audio System Installation. 6 speakers being installed. · Electrical No product keyword matched | 1 | Sep 28, 2026 |
| C | CASASSA ELECTRICAL DESIGN LLC Seattle electrical permits | 5 | Adding 60-amp EV charger with disconnect. · Electrical No product keyword matched | 1 | Sep 28, 2026 |
| C | WIRED UP BUILDING SOLUTIONS LLC Seattle electrical permits | 5 | 2100 square feet remodel garage not touched. Replace meter with update code breaker meter · Electrical No product keyword matched | 2 | Sep 28, 2026 |
| C | CMG Electric LLC Seattle electrical permits | 5 | This is a tenant improvement of an existing new space to house a coffee shop. There is an existing 600A panel in the space that was installed for a future build out. We will be adding (1) 225A from this 600A panel to serve the mainly 120V loads in the space. · Electrical No product keyword matched | 1 | Sep 28, 2026 |
| C | Interface Technologies Northwest Seattle electrical permits | 5 | Installation of (15) Category 6 Plenum Cables. 10/13/26 sk address change · Electrical No product keyword matched | 1 | Sep 28, 2026 |
| C | Eagle Electric of Auburn LLC Seattle electrical permits | 5 | basement remodel · Electrical No product keyword matched | 2 | Sep 28, 2026 |
| C | Simple Security Solutions Seattle electrical permits | 5 | Adding one (1) POE Camera to the existing system with CAT5 · Electrical No product keyword matched | 1 | Sep 28, 2026 |
| C | Alpenglow Electric Seattle electrical permits | 5 | Replace subpanel and pool controller in shed. Replaced motor and pool heater in shed. Remove two knob and tube circuits in basement. Added recessed lighting in basement. · Electrical No product keyword matched | 1 | Sep 28, 2026 |
| C | ELEVATED SYSTEMS LLC Seattle electrical permits | 5 | Low voltage relays installed within gate operator kiosk, 120v receptacle added within existing j-box. · Electrical No product keyword matched | 1 | Sep 28, 2026 |
| C | Arcline Electric Seattle electrical permits | 5 | Installing a dedicated 60amp EV circuit · Electrical No product keyword matched | 5 | Sep 27, 2026 |
| C | Pisces Plumbing Austin issued construction permits | 5 | Plumbing Permit · First tenant improvement for Buffalo wild wings 1270 SQFT. No product keyword matched | 1 | Sep 25, 2026 |
| C | Camp Facility Services Austin issued construction permits | 5 | Building Permit · Fire Rebuild for a portion of existing apartment building
2026-070612 DA - Approved No product keyword matched | 3 | Sep 25, 2026 |
| C | Ambient Control Service Company Austin issued construction permits | 5 | Mechanical Permit · Replacement of complete existing central heat and air system with or without duct work SYSTEM #4 NO DUCTS No product keyword matched | 1 | Sep 25, 2026 |
| C | CS Erickson Austin issued construction permits | 5 | Electrical Permit · ePlan: Commercial Expedited Review - First Time Finish Out for The Twelve Thirty Club (38623 SF). No product keyword matched | 1 | Sep 25, 2026 |
| C | Rich Construction & Services Austin issued construction permits | 5 | Electrical Permit · Interior remodel to create 2 suites with shared common area. Commercial wholesale bakery-F1 Bakery/food prep with new grease trap. SPE approved. please refer to U1 update showing updated uses. (Suite D2) No product keyword matched | 2 | Sep 25, 2026 |
| C | P&G Plumbing LLC Austin issued construction permits | 5 | Plumbing Permit · CHANGE OF USE RETAIL TO RESTAURANT interior remodel for new ice cream shop No product keyword matched | 2 | Sep 25, 2026 |
| C | U.S Electric Contractors Austin issued construction permits | 5 | Electrical Permit · Remodel to pre loss condition: like to like replacement of existing HVAC plumbing electrical and interior finish with no structural modification. Existing multifamily unit. No product keyword matched | 2 | Sep 25, 2026 |
| C | Red Hawk Electrical Services Austin issued construction permits | 5 | Electrical Permit · Existing multifamily property. Add outdoor kitchen with 2 electric grills and sink to deck area of a multifamily apartment complex. No product keyword matched | 2 | Sep 25, 2026 |
| C | Collins Indoor Air Solution Austin issued construction permits | 5 | Mechanical Permit · Replacement of any self-contained packaged units Replace (1) Trane 6 Ton Gas RTU (RTU-1) North end (1) Trane 4 Ton Gas RTU (RTU-2) Core of branch and (1) Trane 7.5 Ton Electric Heat RTU (RTU-3) South End No product keyword matched | 2 | Sep 25, 2026 |
| C | Clark Wilson Builders INC. Austin issued construction permits | 5 | Building Permit · ePlan: Commercial Expedited Review - New Construction of New Detached Garage (1669 SF). No product keyword matched | 35 | Sep 25, 2026 |
| C | Stain Construction Austin issued construction permits | 5 | Building Permit · Change of use to admin/business office and small tenant improvement project renovate break room and bathroom change out lighting throughout. No product keyword matched | 1 | Sep 25, 2026 |
| C | Vega Plumbing Solutions , Inc Austin issued construction permits | 5 | Plumbing Permit · Renovation to existing Building 44 No product keyword matched | 1 | Sep 25, 2026 |
| C | Apex Power Systems Seattle electrical permits | 5 | Add receptacles for menu signs.
add (1) conduit for Data, Data by others. · Electrical No product keyword matched | 5 | Sep 25, 2026 |
| C | Schneider Electric Seattle electrical permits | 5 | Install a new Eaton 200A BR panel and breakers to replace the Challenger house panel. · Electrical No product keyword matched | 1 | Sep 25, 2026 |
| C | ACCO Engineered Systems Seattle electrical permits | 5 | Installing (2) new thermostats for (2) new AHUs. · Electrical No product keyword matched | 2 | Sep 25, 2026 |
| C | Juicer Energy Inc Seattle electrical permits | 5 | Installation of new 200A EV Dedicated Panel in Koi Apartments Parking Garage. Installation of (5x) new 40A (32A) EV Chargers on new panel. [9/25/26 KEF - Plan set approved.] · Electrical No product keyword matched | 2 | Sep 25, 2026 |
| C | SPN Electric LLC Seattle electrical permits | 5 | Installing 5 circuits under 30 amps and 1 50 amp circuit for the kitchen and living room rewire. Installing new can lights in kitchen and living room · Electrical No product keyword matched | 3 | Sep 25, 2026 |
| C | DEAR Services Seattle electrical permits | 5 | redevice of 3 circuits (upstairs bedroom master,living/dinning, downstairs bedroom) spit breakers with safety breakers · Electrical No product keyword matched | 1 | Sep 25, 2026 |
| C | GINTER ELECTRIC Seattle electrical permits | 5 | install electrical wiring for a new attached addition to a existing SFR · Electrical No product keyword matched | 1 | Sep 25, 2026 |