Work completed under permit # 7094784-EL. Per David Rankin, this should have been submitted for plan review. [4/9/26 KEF - Plan set approved. Okay plan review fees per job valuation and OTC fees paid.] · Electrical
No product keyword matched · Seattle electrical permits
Upgrade to a new 200 amp service on the outside of the house and then feed the old circuits from the new panel but leave the old panel location as a J-box. [5/26/2026 PGF Added (4) 20A branch circuits to permit per contractor request (Addison). Post-issuance change fee included.] · Electrical
No product keyword matched · Seattle electrical permits
BAS panel rework. Upgrading existing BAS controller. May need to add possible step down transformer (from existing 120VAC to 24VAC) to power new controller if the 24VAC is not there already. · Electrical
No product keyword matched · Seattle electrical permits