Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | HMR ELECTRIC LLC NYC DOB electrical permits | 11 | A/C mini split and GFI No product keyword matched | 4 | Oct 28, 2026 |
| B | NEWLINE ELECTRICAL CORP NYC DOB electrical permits | 11 | Filing to reinstate abandoned Electrical Permit #B155900 to obtain DOB final. |
| 1 |
| Oct 28, 2026 |
| B | INTER CONNECTION ELETRIC NYC DOB electrical permits | 11 | Temporary light and power for landlord for new elevator , demo/disconnects for new stair No product keyword matched | 6 | Oct 28, 2026 |
| B | DIDONATO & SONS ELCL CONT NYC DOB electrical permits | 11 | 4 -family with plp No product keyword matched | 2 | Oct 28, 2026 |
| B | POLO ELECTRIC CORP. D/B/A NYC DOB electrical permits | 11 | Carnegie Diner, Polo Job #26-2930 No product keyword matched | 6 | Oct 28, 2026 |
| B | CJC ELECTRIC INC NYC DOB electrical permits | 11 | apartment 16A No product keyword matched | 2 | Oct 28, 2026 |
| B | C.Q. ELECTR'L CONTRG CORP NYC DOB electrical permits | 11 | Due to a fire damage, rewiring entire single-family dwelling. No product keyword matched | 2 | Oct 28, 2026 |
| B | JORDEN-ASH ELECTRIC CORP NYC DOB electrical permits | 11 | Installing of any 10 of fewer units not requiring the installation of an additional branch circuit. in laundry room APART, 7A No product keyword matched | 4 | Oct 28, 2026 |
| B | UPDATE SYSTEMS ELECTRICAL NYC DOB electrical permits | 11 | Previously Permit #B352512 - new permit issued for Con Ed meter removal No product keyword matched | 2 | Oct 28, 2026 |
| B | SMART LIGHT ELECTRICAL CO NYC DOB electrical permits | 11 | Service work, General wiring 2 Family House No product keyword matched | 6 | Oct 28, 2026 |
| B | R & R Electric & Small Projects Inc. NYC DOB electrical permits | 11 | Replacing burnt out service conductors from meter to existing circuit breaker panel. Only conductors between meters and panel were replaced. No product keyword matched | 9 | Oct 28, 2026 |
| B | NY Spark Electric LLC NYC DOB electrical permits | 11 | General Wiring ,Apt 19B No product keyword matched | 5 | Oct 28, 2026 |
| B | MASON ELECTRICAL SERVICES INC NYC DOB electrical permits | 11 | Apartment # 44- Run new 220v. circuit from apartment panel to kitchen for new electric stove receptacle. No product keyword matched | 5 | Oct 28, 2026 |
| B | GENESIS NYC CONSTRUCTION NYC DOB building permits | 11 | Structural · FILE THIS STRUCTURAL WORK TYPE IN CONJUCNTION WITH JOB #B01414543 No product keyword matched | 5 | Oct 27, 2026 |
| B | SUNDAY ENERGY LLC NYC DOB building permits | 11 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 4 | Oct 27, 2026 |
| B | BROADWAY 32ND REALTY CORP NYC DOB building permits | 11 | Mechanical Systems · PROVIDE HVAC AND KITCHEN EXHAUST FOR INTERIOR RENOVATION OF SUPERMARKET. THERE IS NO CHANGE OF USE, OCCUPANCY, AND EGRESS. No product keyword matched | 6 | Oct 27, 2026 |
| B | TMG CONSTRUCTION CORP Austin issued construction permits, NYC DOB building permits | 11 | Building Permit · INTERIOR REMODEL TO EXISTING RETAIL SPACE #126 No product keyword matched | 4 | Oct 27, 2026 |
| B | JOSEPH O'GRADY P & H INC NYC DOB building permits | 11 | Plumbing · PROPOSED PLUMBING No product keyword matched | 1 | Oct 27, 2026 |
| B | BLUE SHINE BUILDERS INC DBA BLUE SK NYC DOB building permits | 11 | Plumbing · underground combination sanitary and storm piping. No product keyword matched | 11 | Oct 27, 2026 |
| B | BEDROCK MECHANICAL INC NYC DOB building permits | 11 | Sprinklers · Modification of existing sprinkler system No product keyword matched | 7 | Oct 27, 2026 |
| B | WALLACE AVENUE CONSTR LLC NYC DOB building permits | 11 | Construction Fence · CONSTRUCTION FENCE, APPLICABLE TO LOTS: 8 & 7 (193 & 191 CHARLES AVENUE) No product keyword matched | 1 | Oct 27, 2026 |
| B | UNITECH DESIGN INC NYC DOB building permits | 11 | Sign · PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING TOUS les JOURS BAKERY CAFE No product keyword matched | 7 | Oct 27, 2026 |
| B | MANHATTAN CENTER STUDIOS NYC DOB building permits | 11 | General Construction · Temp boxing rink, no alteration to existing structures for HayMakers for Hope Charity Boxing Fund Raiser, TPA required. Producer responsible to monitor site safety. All production equipment removed upon event complete No product keyword matched | 2 | Oct 27, 2026 |
| B | FRS CONSTRUCTION NYC DOB building permits | 11 | Mechanical Systems · mechanical work in conjunction with NB 440654784 No product keyword matched | 5 | Oct 27, 2026 |
| B | 766 DEAN STREET LLC NYC DOB building permits | 11 | Protection and Mechanical Methods · TEMPORARY ROOF / OVERHEAD PROTECTION AT ADJOINING PROPERTIES DURING NB CONSTRUCTION, FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 5 | Oct 27, 2026 |
| B | WINNRESIDENTIAL NYC DOB building permits | 11 | General Construction · Facade Repair Project. No change in use, egress or occupancy. No product keyword matched | 5 | Oct 27, 2026 |
| B | MAXWELL KATES INC NYC DOB building permits | 11 | General Construction · MISCELLANEOUS LOCALIZED MASONRY RESTORATION, AS WINDOW LINTEL REPLACEMENT, MASONRY REBRICKING AND REPOINTING OF MORTAR JOINTS, SOUND TESTING OF PATCH REPAIRS OF CONCRETE. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 12 | Oct 27, 2026 |
| B | 11 EAST 71ST STREET NYC DOB building permits | 11 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 27, 2026 |
| B | K.M.D MECHANICAL 1443 LLC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF PLUMBING FIXTURES. NO CHANGE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION No product keyword matched | 3 | Oct 27, 2026 |
| B | QMB PLUMBING & HTG INC NYC DOB building permits | 11 | Sprinklers · Installation of a new sprinkler system within an existing 2 family home. No change of use, egress or occupancy under this application No product keyword matched | 3 | Oct 27, 2026 |
| B | QMB PLUMBING & HEATING IN NYC DOB building permits | 11 | Plumbing · INTERIOR PLUMBING WORK FOR TWO FAMILY DWELLING INCLUDING 1-STORY HORIZONTAL No product keyword matched | 7 | Oct 27, 2026 |
| B | EMPIRE MANAGEMENT & CONST NYC DOB building permits | 11 | Construction Fence · PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 12 | Oct 27, 2026 |
| B | WR Windows cleaning & GC NYC DOB building permits | 11 | Plumbing · TO INSTALL A NEW BATHROOM ON THE 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. INSTALL NEW FIXTURES ON 1ST FLOOR ON RELOCATED EXISTING ROUGH-INS. No product keyword matched | 1 | Oct 27, 2026 |
| B | PEAQ RESTORATION, LLC NYC DOB building permits | 11 | Suspended Scaffold · Suspended Scaffold Installation For Facade Restoration And Inspection No product keyword matched | 2 | Oct 27, 2026 |
| B | T-Mobile NYC DOB building permits | 11 | Antenna · Decommission of existing T-MOBILE site on the roof. Remove 16 antennas, 6 RRUs, 1 GPS unit, and 4 equipment cabinets. No product keyword matched | 4 | Oct 27, 2026 |
| B | ANESIS MECHANICAL CORP NYC DOB building permits | 11 | Plumbing · Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application. No product keyword matched | 2 | Oct 27, 2026 |
| B | KUNDU GROUP CORP NYC DOB building permits | 11 | General Construction · NEW BUILDING: 3 STORY AND BASEMENT RESIDENTIAL BUILDING (7 FAMILIES) No product keyword matched | 2 | Oct 27, 2026 |
| B | 277 PARK AVENUE, LLC NYC DOB building permits | 11 | Construction Fence · Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 12 | Oct 27, 2026 |
| B | ANESIS SERVICES CORP NYC DOB building permits | 11 | Sprinklers · Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application. No product keyword matched | 6 | Oct 27, 2026 |
| B | NEW YORK PARK PLBG&HTG CO NYC DOB building permits | 11 | Plumbing · NEW KITCHEN LAYOUT ON FIRST AND SECOND FLOORS, REPLACEMENT OF BATHROOM FIXTURES, EXISTING GAS METER 1 TO CONNECT TO EXISTING BOILER WITH INDIRECT TANK AND GAS RANGE ON FIRST FLOOR ONLY. EXISTING GAS METER 2 TO BE REMOVED No product keyword matched | 16 | Oct 27, 2026 |
| B | EMPRISE CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · Interior renovations to suite 610 as per plans. No change to use, egress or occupancy. No product keyword matched | 2 | Oct 27, 2026 |
| B | Serafina NYC DOB building permits | 11 | Plumbing · Tenant fit-out for an interior renovation of a commercial space on the 2nd Floor with new plumbing fixtures with associated branch piping No product keyword matched | 1 | Oct 27, 2026 |
| B | DAVID CONSTRUCTING NY, IN NYC DOB building permits | 11 | General Construction · Install new partition to create additional bedroom in apt 9D. No change in use, egress and occupancy No product keyword matched | 2 | Oct 27, 2026 |
| B | VETERANS CENTER MANAGER LLC NYC DOB building permits | 11 | General Construction · ALTERATION TYPE 2 APPLICATION FOR INTERIOR DEMO OF EXISTING ONE STORY COMMERCIAL USE BUILDING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 27, 2026 |
| B | NULINE MCHNCL SRVCS, LLC NYC DOB building permits | 11 | Standpipe · PROPOSED TEMP STANDPIPE FILING IN CONJUNCTION TO NB # 220212918 No product keyword matched | 9 | Oct 27, 2026 |
| B | NY WONDER CONSTRUCTION CO NYC DOB building permits | 11 | Suspended Scaffold · Suspended scaffold outrigger installation for facade repair works No product keyword matched | 2 | Oct 27, 2026 |
| B | ZAF CORPORATION NYC DOB building permits | 11 | General Construction · MINOR INTERIOR RENOVATION OF EXISTING RESIDENTIAL APARTMENT 4J. REMOVE NON LOAD BEARING WALL AS PER PLANS, REMOVE DOORS, INSTALL NEW NON LOAD BEARING WALL AS PER PLANS, INSTALL NEW DOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Oct 27, 2026 |
| B | CRAFTMEN ASSOCIATED CORP NYC DOB building permits | 11 | Mechanical Systems · FILING TO OBTAIN CERTIFICATE OF COMPLIANCE. JOB PREVIOUSLY FILED UNDER JOB # B00552772-I1. INITIAL SCOPE OF WORK WAS TO REPLACE THE CONDENSER ON THE ROOF. NO ROPOSED WORK ON THIS APPLICATION. No product keyword matched | 1 | Oct 27, 2026 |
| B | ZEFI & CO. LLC NYC DOB building permits | 11 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 12 | Oct 27, 2026 |
| B | HPD NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. No product keyword matched | 5 | Oct 27, 2026 |