Protection and Mechanical Methods · TEMPORARY ROOF / OVERHEAD PROTECTION AT ADJOINING PROPERTIES DURING NB CONSTRUCTION, FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Protection and Mechanical Methods · TEMPORARY ROOF / OVERHEAD PROTECTION AT ADJOINING PROPERTIES DURING NB CONSTRUCTION, FILED SEP. ROOF / OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Construction Fence · CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Support of Excavation · PROPOSE SOE WORK TO SUPPORT ADJACENT UNEXCAVATED SOIL DURING EXCAVATION FOR PURPOSES OF INSTALLING THE FOUNDATION ELEMENTS FILED IN CON. W/ NB #B00764297-I1. WORK INCLUDES THE INSTALLATION OF SOLDIER PILES, WOOD LAGGING, SHORING AND RACING.
No product keyword matched · NYC DOB building permits