Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | FALCON ELEC'L CONTR'G COR NYC DOB electrical permits | 11 | Hereby filing for Electrical power wiring for Mechanical Equipment, receptacles and reinstall existing light fixtures. No change to use occupancy or egress. No product keyword matched | 1 | Oct 30, 2026 |
| B | MAJOR ELECTRIC INC. |
| 11 |
Installing temporary service for new construction of building with passenger Hoist No product keyword matched |
| 3 |
| Oct 30, 2026 |
| B | TRI-STATE ELECL & MECHL I NYC DOB electrical permits | 11 | GARBAGE COMPACTOR LINE VOLTAGE DISCONNECT & RECONNECT. ALL EQUIPMENT BY OTHERS. No product keyword matched | 37 | Oct 30, 2026 |
| B | EBC CAPITAL LLC NYC DOB building permits | 11 | Mechanical Systems · INSTALLATION OF SPLIT SYSTEM AC UNIT FOR EXISTING EATING AND DRINKING ESTABLISHMENT, NO CHANGE IN USE, OCCUPANCY OR EGRESS No product keyword matched | 1 | Oct 29, 2026 |
| B | MAUCERI SIGN SYSTEMS LLC NYC DOB building permits | 11 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 6 | Oct 29, 2026 |
| B | GREAT ONE CONSTRUCTION LL NYC DOB building permits | 11 | Structural · VERTICAL ENTENSION TO EXISTING 1-FAMILY HOUSE AND CONVERT TO 2-FAMILY HOUSE. TO OBTAIN NEW C OF O. No product keyword matched | 10 | Oct 29, 2026 |
| B | BRIDGE DEVELOPMENT PARTNERS, LLC NYC DOB building permits | 11 | Support of Excavation · Support of Excavation as per plans filed No product keyword matched | 3 | Oct 29, 2026 |
| B | MARTINEZ CONSTRUCTION MAN NYC DOB building permits | 11 | General Construction · EXTERIOR WORK AS PER PLANS. NEW MASONRY OPENINGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 29, 2026 |
| B | CORONA 888 INC NYC DOB building permits | 11 | Foundation · FILE FOUNDATION IN CONJUNCTION WITH JOB#Q01188607 No product keyword matched | 13 | Oct 29, 2026 |
| B | REDHOEK CONSTRUCTION LLC NYC DOB building permits | 11 | Foundation · FO work in conjunction with NB application as per plans filed. No product keyword matched | 2 | Oct 29, 2026 |
| B | GURNOOR CONSTRUCTION CORP NYC DOB building permits | 11 | Sidewalk Shed · HEAVYDUTY SIDEWALK SHED AS PER PLANS FOR EXTERIOR REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. No product keyword matched | 14 | Oct 29, 2026 |
| B | PETERKIN CONSTRUCTION LLC NYC DOB building permits | 11 | Earth Work · Propose horizontal and vertical enlargement. Interior renovation with exterior restoration. New finishes and trims. Obtain certificate of occupancy for two(2) family dwelling No product keyword matched | 5 | Oct 29, 2026 |
| B | Chaim Schweid NYC DOB building permits | 11 | General Construction · parapet wall replacement, repointing, crack brick replacement and window lintel replacement as per plans. no change in use, egress or occupancy with this application No product keyword matched | 1 | Oct 29, 2026 |
| B | AJ CLARKE REAL ESTATE CORP NYC DOB building permits | 11 | Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. No product keyword matched | 17 | Oct 29, 2026 |
| B | G.A.M. REAL ESTATE LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 5 | Oct 29, 2026 |
| B | F.S. SITE CORP NYC DOB building permits | 11 | Plumbing · Interior modifications to existing Plumbing system related to BOH renovations and upgrades. No change in occupancy, use or egress No product keyword matched | 12 | Oct 29, 2026 |
| B | MAXIMUM CONTRACTING INC NYC DOB building permits | 11 | Construction Fence · TEMPORARY FENCE No product keyword matched | 24 | Oct 29, 2026 |
| B | ROCKLEDGE SCAFFOLD CORP NYC DOB building permits | 11 | Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 15 | Oct 29, 2026 |
| B | KEYSTONE CONTRACTING CORPORATION NYC DOB building permits | 11 | General Construction · FACADE REPAIR AS PER PLAN. No product keyword matched | 11 | Oct 29, 2026 |
| B | ATLANTIS DEVELOPMENT INC NYC DOB building permits | 11 | Construction Fence · Installation of temporary constructin fence permit along perimeter lot line, after demolition, inconjunction with NB. No product keyword matched | 3 | Oct 29, 2026 |
| B | MALIK MANAGEMENT NYC DOB building permits | 11 | General Construction · FILED HEREWITH A STRUCTURAL WORK OF THE EXISTING TWO-STORY COMMERCIAL BUILDING. FILED IN CONJUNCTION WITH ALT Q01185386-I1 No product keyword matched | 4 | Oct 29, 2026 |
| B | FIVE BOROUGH FP, INC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF SPRINKLER SYSTEM FOR ENTIRE DWELLING IN CONJUNCTION WITH ALT 1 APPLICATION # B00956225. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 29, 2026 |
| B | 480 Amsterdam Avenue LLC NYC DOB building permits | 11 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING BUILDING ALT, FILED SEP UNDER M01226123. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 29, 2026 |
| B | ROYAL CHARTER PROPERTIES NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR & FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 8 | Oct 29, 2026 |
| B | KALE CONSTRUCTION INC NYC DOB building permits | 11 | Construction Fence · INSTALL 8; TEMP. PLYWOOD FENCE AS PER PLAN, NO CHANGE OF USE,OCCUPANCY OR EGRESS. No product keyword matched | 94 | Oct 29, 2026 |
| B | CANVAS PROPERTY GROUP NYC DOB building permits | 11 | Suspended Scaffold · Suspended Scaffold outrigger installation for Facade repair Works No product keyword matched | 12 | Oct 29, 2026 |
| B | H BUILDING MANAGEMENT INC NYC DOB building permits | 11 | General Construction · FILING FOR INTERIOR RENOVATIONS OF AN EXISTING 1 FAMILY 2 STORY MASONRY BUILDING W/ CELLAR. PROPOSED 2 STORY REAR EXTENSION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 32 | Oct 29, 2026 |
| B | ROCKLYN ASSET CORP NYC DOB building permits | 11 | Plumbing · SCA PS 509Q. PLUMBING WORK ASSOCIATED WITH THE RENOVATION OF THE EXISTING SCHOOL BUILDING. No product keyword matched | 24 | Oct 29, 2026 |
| B | MHANY MANAGEMENT INC. NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 27 | Oct 29, 2026 |
| B | STARCO CONSTRUCTION CORP NYC DOB building permits | 11 | General Construction · DEMOLISH AND REBUILD DETERIORATED STREET FACADE PARAPET WALL DOWN TO AND INCLUDING WINDOW LINTELS. No product keyword matched | 2 | Oct 29, 2026 |
| B | ZLB NYC DOB building permits | 11 | Structural · STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X01250967-I1 No product keyword matched | 9 | Oct 29, 2026 |
| B | UNITED 2441 LLC NYC DOB building permits | 11 | Sprinklers · INSTALLATION OF SPRINKLER SYSTEM THROUGH-OUT BUILDING RENOVATION AND EXPANSION. No product keyword matched | 7 | Oct 29, 2026 |
| B | STRUCTURE TONE, LLC Austin issued construction permits, NYC DOB building permits | 11 | General Construction · Architectural changes as per plans. No change in use, egress or occupancy. No product keyword matched | 39 | Oct 29, 2026 |
| B | ATOMIC CONTRACTING INC. NYC DOB building permits | 11 | Structural · THIS APPLICATION IS FILED FOR NEW 3 STORY AND 3 FAMILY BUILDING No product keyword matched | 37 | Oct 29, 2026 |
| B | LEMAZIA CONSTRUCTION INC NYC DOB building permits | 11 | Structural · REPAIR OF THE EXISTING EXTERIOR BRICK WALL AND CONSTRUCTION OF A NEW THIRD-FLOOR ADDITION No product keyword matched | 2 | Oct 29, 2026 |
| B | GRAMERCY PARK HOUSE, LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 29, 2026 |
| B | TERMINAL FEE OWNER LP NYC DOB building permits | 11 | Sign · INSTALLATION OF INDIRECT ILLUMINATED ACCESSORY SIGNAGE ON EXISTING MARQUEE ABOVE FIRST FLOOR ENTRANCE. No product keyword matched | 4 | Oct 29, 2026 |
| B | TOWER SERVICES INC NYC DOB building permits | 11 | General Construction · Tear off and replace PH roof membrane and insulation system. No change to use, egress, or occupancy. No product keyword matched | 3 | Oct 29, 2026 |
| B | MONADNOCK DEVELOPMENT NYC DOB building permits | 11 | Full Demolition · FULL DEMOLITION OF A 2 STORY (CENTRAL PLANT) BUILDING No product keyword matched | 14 | Oct 29, 2026 |
| B | JOSEPH RIZZUTI NYC DOB building permits | 11 | General Construction · ADMINISTRATIVE FILING FOR NEW EXTERIOR CONCRETE STAIRS TO ACCESS GRADE DIRECTLY FROM CELLAR AS ORIGINALLY FILED, APPROVED AND PERMITTED UNDER APPLICATION #301542329 FOR SIGN-OFF PURPOSES No product keyword matched | 1 | Oct 29, 2026 |
| B | ALMA DESIGN INC NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL SYSTEMS WORK APPLICATION FOR A REFRIGERTOR COMPRESSOR AND INTERIOR BLOWER AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 5 | Oct 29, 2026 |
| B | ERICA ROJAS NYC DOB building permits | 11 | General Construction · INTER. RENOV.: REMOVAL & DISPOSAL OF INT. GWB, FLR, CLG & WALL FINISHES. INSTALL NEW GWB, FLOOR, CLG & WALL FINISHES. REPLACEMENT LIGHT FIXTS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 9 | Oct 29, 2026 |
| B | KC EXPEDITING INC NYC DOB building permits | 11 | Green Roof · GREEN ROOF; GREEN AREAS No product keyword matched | 11 | Oct 29, 2026 |
| B | PADMA CONTRACTING CORP NYC DOB building permits | 11 | General Construction · PROPOSED TO HORIZONTAL EXTENSION 1ST FLOOR LEVEL REAR SIDE OF THE BUILDING AND RIGHT SIDE OF BUILDING. INSTALL CELLAR ENTRANCE FRONT AND CELLAR EXIT REAR SIDE. NO CHANGE IN USE, EGRESS & OCCUPANCY WITH THIS APPLICATION. No product keyword matched | 3 | Oct 29, 2026 |
| B | HEIRLOOM WOODWORKING INC NYC DOB building permits | 11 | General Construction · PROPOSED 1-story HORIZONTAL ENLARGEMENT to the rear OF EXISTING ONE-FAMILY DETACHED HOUSE; & MINOR ALTERATION TO THE PARTIAL CELLAR AREA AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Oct 29, 2026 |
| B | VOLK INDUSTRIAL SERVICES NYC DOB building permits | 11 | Protection and Mechanical Methods · Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 15th floor through the 57th floor. No product keyword matched | 21 | Oct 29, 2026 |
| B | STREAM ROCK CONTSRUCTION* NYC DOB building permits | 11 | Mechanical Systems · PROPOSE A NEW TWO STORY WIT TWO FAMILY HOUSE. OBTAIN NEW C OF O. No product keyword matched | 57 | Oct 29, 2026 |
| B | CENTURY DEVELOPMENT GROUP NYC DOB building permits | 11 | Full Demolition · THIS JOB IS FILED FOR FULL DEMOLITION WORK AT 144-36REAR NORTHERN BOULEVARD, QUEENS, NY 11354 No product keyword matched | 9 | Oct 29, 2026 |
| B | MSS GOLDEN EAGLE CONSTRUC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 12 | Oct 29, 2026 |
| B | TRADITIONAL LINE, LTD NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATIONS TO APT. #46. WORK TO INCLUDE NON-STRUCTURAL DEMOLITION, GENERAL CONSTRUCTION & FINISHES, INFILL WINDOW OPENINGS, REPLACE WINDOW IN EXISTING OPENING, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 4 | Oct 29, 2026 |