Protection and Mechanical Methods · Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 15th floor through the 57th floor.
Protection and Mechanical Methods · Installation of the alternative perimeter protection system, including cocoons and screens mounted to rail climbing systems, from the 15th floor through the 57th floor.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · Installation of Outrigger platform for deck formwork as per plans filed herewith. No change in use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · INTERIOR RENOVATION TO EXISTING 2 FAMILY DWELLING, PARTITION WORK, NEW FLOORING, ALL AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · MECHANICAL MEANS SUBMITTED FOR USE OF MECHANICAL EQUIPMENT AT THE TIME OF DEMOLITION IN CONJUNCTION WITH THE INTERIOR DEMO APPLICATION
No product keyword matched · NYC DOB building permits
General Construction · THE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE, MEANS AND METHODS FOR THE PROPOSED INTERIOR ALTERATION OF THE 4 STORY BUILDING(S) LOCATED AT 150 EAST 79TH STREET, 10075.
No product keyword matched · NYC DOB building permits