Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | *MAIN Austin issued construction permits | 6 | Building Permit · ePlan: Commercial Expedited Review - Change of Use and Finish Out for Theater and Dance School in Space Previously Retuned to Shell in Phase I scope includes New Exterior Openings for Glazing and Shade Canopies Over Exits. Phase 2.2 (2025-052228PR) (150000 SF). No product keyword matched | 1 | Nov 3, 2026 |
| C |
| Flintco LLC *MAIN* Austin issued construction permits |
| 6 |
Building Permit · Ground-up pavilion of approximately 2000sf footprint single-level steel-frame exterior performance pavilion with interior conditioned support spaces. No product keyword matched |
| 2 |
| Nov 3, 2026 |
| C | HC Construction Austin issued construction permits | 6 | Building Permit · Change of use and interior remodel to dog grooming facility. No product keyword matched | 1 | Nov 3, 2026 |
| C | CROSS COUNTRY PLUMBING INC. Austin issued construction permits | 6 | Plumbing Permit · Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily. No product keyword matched | 8 | Nov 3, 2026 |
| C | Go Solar LLC dba Big Sun Solar Austin issued construction permits | 6 | Building Permit · install new 56.05 kWDC rooftop solar system to commercial only. No product keyword matched | 1 | Nov 3, 2026 |
| C | La Casita Plumbing, LLC Austin issued construction permits | 6 | Plumbing Permit · 3 new pre-engineered metal buildings for vehicle storage with storage rooms. Building Q has restrooms an office space and storage rack for meter distribution No product keyword matched | 6 | Nov 3, 2026 |
| C | Penagos Electric LLC Austin issued construction permits | 6 | Electrical Permit · Storefront Sign installed on the mall wall description: background made in ACM with an Aluminum frame inside Letters made in Channel letters front in 3/16 Acrylic return made in aluminum back made in aluminum will be installed with non corrosive screws No product keyword matched | 3 | Nov 3, 2026 |
| C | JFIG ELECTRIC SERVICE LLC Austin issued construction permits | 6 | Electrical Permit · Temp power for 3008 Davis Ln #230
ref 2026-123268 BP No product keyword matched | 2 | Nov 3, 2026 |
| C | HD Roofing and Repairs Co. Austin issued construction permits | 6 | Building Permit · Full demo down to decking installing 2 layers of 22 poly iso insulation. mechanically attached new 60 mil tpo roof system No product keyword matched | 1 | Nov 3, 2026 |
| C | Higher Standard Air Services LLC Austin issued construction permits | 6 | Mechanical Permit · Change of use to restaurant with 40 square foot addition at rear of dining room in order to provide accessible entrance. Interior upgrades to bathrooms to improve accessibility. No product keyword matched | 1 | Nov 3, 2026 |
| C | Pacific Crest Power Seattle electrical permits | 6 | Replace light fixtures, relocate switches, add exterior outlets, add grounding/bonding, install conduit to clean up sump pump wiring. · Electrical No product keyword matched | 3 | Nov 3, 2026 |
| C | RESICON LLC Seattle electrical permits | 6 | Upgade service to 200AMP replace panel · Electrical No product keyword matched | 28 | Nov 3, 2026 |
| C | MACDONALD MILLER FACILITY SOLUTIONS LLC Seattle electrical permits | 6 | Replacement of existing swamp cooler 3ph/208v · Electrical No product keyword matched | 32 | Nov 3, 2026 |
| C | Puget Sound Solar Seattle electrical permits | 6 | Installation of (1) Wallbox Level 2 EV Charger. · Electrical No product keyword matched | 17 | Nov 3, 2026 |
| C | Active Engineering Seattle electrical permits | 6 | Add (2) 120v 20amp toilet circuits
Add (6) 120v 20amp circuits
Add (6) 120v 15amp circuits
Extend/Relocate (6) 120v 20amp circuits
Extend/Relocate (6) 120v 15amp circuits
Extend/Relocate (3) 208v 30amp circuits
Extend/Relocate (1) 208v 50amp circuit
Install (25) 120v plugs
Install (75) light fixtures
Install (15) switches plugs · Electrical No product keyword matched | 3 | Nov 3, 2026 |
| C | Eco Electric LLC Seattle electrical permits | 6 | Wire south SFR with 200amp feeder · Electrical No product keyword matched | 25 | Nov 3, 2026 |
| C | ELECTRI-CITY, INC. Seattle electrical permits | 6 | Repair overhead service mast damaged during exterior painting at single family residence · Electrical No product keyword matched | 12 | Nov 3, 2026 |
| C | GUARDIAN SECURITY SYSTEMS INC Seattle electrical permits | 6 | Fire panel replacement · Electrical No product keyword matched | 24 | Nov 3, 2026 |
| C | Evergreen Technologies Inc Seattle electrical permits | 6 | Low voltage communications cabling on 44th & 45th floors. · Electrical No product keyword matched | 9 | Nov 3, 2026 |
| C | HB Power Electric LLC Seattle electrical permits | 6 | I'm installing 20A disconnect for A/C unit. · Electrical No product keyword matched | 6 | Nov 3, 2026 |
| C | SHARP ELECTRIC LLC Seattle electrical permits | 6 | back covered deck got wired with 16 can less lights and one fan.
Panel replacement · Electrical No product keyword matched | 1 | Nov 3, 2026 |
| C | EMERALD AIRE, INC. Seattle electrical permits | 6 | Provide and install (2) low voltage thermostats and associated low voltage wiring. · Electrical No product keyword matched | 13 | Nov 3, 2026 |
| C | Northern Current LLC Seattle electrical permits | 6 | Tenant Improvement of new Ben and Jerry's ice cream, in existing space. Adding or Modifying 18 120-volt circuits. · Electrical No product keyword matched | 1 | Nov 3, 2026 |
| C | Pacific Communications Cabling Seattle electrical permits | 6 | Provide and install cables from MDF to Telecom room. · Electrical No product keyword matched | 3 | Nov 3, 2026 |
| C | MSE ELECTRIC LLC Seattle electrical permits | 6 | Remove and replace meter base ,mast and main panel · Electrical No product keyword matched | 1 | Nov 3, 2026 |
| C | Dayelectricllc Seattle electrical permits | 6 | Adding exterior outlets under new construction area and exterior lighting under deck. · Electrical No product keyword matched | 1 | Nov 3, 2026 |
| C | HECK ELECTRIC LLC Seattle electrical permits | 6 | i am remodeling a closet and removing the electrical from a wall that is moving. plus lighting · Electrical No product keyword matched | 1 | Nov 3, 2026 |
| C | Home Integrity Electric Seattle electrical permits | 6 | Meter installation AADU · Electrical No product keyword matched | 2 | Nov 3, 2026 |
| C | Durkin Electric Seattle electrical permits | 6 | From the provided gutter I will be connecting the tank monitoring system, card reader, dispenser and pump for a diesel AST. This work is being subcontracted under Saybr. · Electrical No product keyword matched | 2 | Nov 3, 2026 |
| C | Novo Construction **Main** Austin issued construction permits | 6 | Building Permit · CHANGE OF USE RESTAURANT RETAIL TO PERSONAL IMPROVEMENT SERVICES Phase1Ext and Int Remodel of floor 1 and a portion of floor 3 for new personal improvement services. Exterior improvements will be phased with this being the first. Some exterior Improvements shown in site plan exemption approval will not be permitted until phase 2. No access control. No scope on floor 2 No product keyword matched | 28 | Nov 2, 2026 |
| C | Schmidt Electric Co Inc Austin issued construction permits | 6 | Electrical Permit · ePlan: Commercial Expedited Review - Phase 2: Interior Remodel to Existing Manufacturing Facility (20000 SF). No product keyword matched | 17 | Nov 2, 2026 |
| C | Build Pro Mechanical LLC Austin issued construction permits | 6 | Mechanical Permit · ePlan: Commercial Expedited Review - Interior Remodel and Change of Use from Storage to Cocktail Lounge (3676 SF) No product keyword matched | 3 | Nov 2, 2026 |
| C | Indus Plumbing Austin issued construction permits | 6 | Plumbing Permit · ePlan: Commercial Expedited Review - Change of Use from Retail to Pilates Studio (2175 SF) No product keyword matched | 5 | Nov 2, 2026 |
| C | SERVICE WIZARD LLC Austin issued construction permits | 6 | Mechanical Permit · Replacement of complete existing central heat and air system with or without duct work No product keyword matched | 4 | Nov 2, 2026 |
| C | Havens Commercial LLC dba Havens Construction Austin issued construction permits | 6 | Building Permit · ePlan: Commercial Expedited Review - Change of Use from Retail to Pilates Studio (2175 SF) No product keyword matched | 3 | Nov 2, 2026 |
| C | CND Signs, LLC Austin issued construction permits | 6 | Electrical Permit · Install one front lit channel letter sign No product keyword matched | 9 | Nov 2, 2026 |
| C | Mag Plumbing and Services Austin issued construction permits | 6 | Plumbing Permit · ETJ- Rough-in and top out for new fixtures for battery of bathrooms
Sq. ft. 950 (AW) REF: SP-2021-0380D No product keyword matched | 1 | Nov 2, 2026 |
| C | Global Electric Services Inc Austin issued construction permits | 6 | Electrical Permit · Need a emergency permit to shut power off to this service to be able to replace the 100 amp main breaker No product keyword matched | 2 | Nov 2, 2026 |
| C | GL Hunt Foundation Repair Austin issued construction permits | 6 | Building Permit · Foundation Repair 87 Steel Piers - 30: 87 Steel Caps - 30 Breakout - Asphalt No product keyword matched | 1 | Nov 2, 2026 |
| C | Vences Contracting Group Austin issued construction permits | 6 | Mechanical Permit · INTERIOR REMODEL OF EXISTING RETAIL SPACE #128 No product keyword matched | 3 | Nov 2, 2026 |
| C | Patriot Pro Electric, LLC Austin issued construction permits | 6 | Electrical Permit · Phase 2 Electrical scope only. Scope to be completed in conjunction with previously approved 2026-103551 PR which was approved via QT review and did not include any MEP work. Revision not allowed on QT review. No product keyword matched | 4 | Nov 2, 2026 |
| C | Tovar Electrical Services Austin issued construction permits | 6 | Electrical Permit · Meter Install for POND No product keyword matched | 40 | Nov 2, 2026 |
| C | Citadel Development Services LLC Austin issued construction permits | 6 | Building Permit · New construction of a Tim Hortons locationapproximately 1400 sq. ft.; a single-story freestanding quick-service coffee shop/fast-food restaurant.
SP-2025-0359 - Concurrent Reviews No product keyword matched | 1 | Nov 2, 2026 |
| C | JSM Elite Electric Austin issued construction permits | 6 | Electrical Permit · ePlan: Expedited Review - New Construction of Shade Structure for Multi-Family Building with Associated Amenities. No product keyword matched | 3 | Nov 2, 2026 |
| C | Wurzel Builders, Ltd.**MAIN** Austin issued construction permits | 6 | Building Permit · Construction of (2) Block/Brick Trash Enclosures No product keyword matched | 4 | Nov 2, 2026 |
| C | Carleton Companies Austin issued construction permits | 6 | Building Permit · ePlan: Expedited - Accessory Retail Shell **NOT FOR OCCUPANCY (2809 sf.)
jack 785-761-6615 No product keyword matched | 1 | Nov 2, 2026 |
| C | AM HVAC LLC Austin issued construction permits | 6 | Mechanical Permit · ePlan-Expedited Review: [APPROVED] Interior Remodel and Change of Use from Child Daycare to Personal Improvement Service. Scope of work to include demo of flooring fans plumbing fixtures light fixtures update parking stalls to meet zoning requirements (2127 SF) No product keyword matched | 2 | Nov 2, 2026 |
| C | Drury Roofing Austin issued construction permits | 6 | Building Permit · Reroof TPO over section of roof 49 squares. No product keyword matched | 1 | Nov 2, 2026 |
| C | True Comfort Air Austin issued construction permits | 6 | Mechanical Permit · Replacement of any self-contained packaged units No product keyword matched | 1 | Nov 2, 2026 |
| C | Steve Eastland HVAC Austin issued construction permits | 6 | Mechanical Permit · Renovation converting 1 - 2-bedroom unit into 2 - 1-bedroom units (Original unit number 212 converting into 1103) No product keyword matched | 1 | Nov 2, 2026 |