Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/HB Power Electric LLC
Back to prospects

HB Power Electric LLC

SEATTLE, WA · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 6 / 20Tier C
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place0 / 5WA is outside the seller’s region and target regions.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
HB Power Electric LLC
Source for Company (opens in new tab)
Signal source
Seattle electrical permits
Signal date
Nov 3, 2026
Source for Signal date (opens in new tab)
Signal count
15 saved signals, 6 in the last 90 days
Signal summary
I'm installing 20A disconnect for A/C unit. · Electrical
Source for Signal summary (opens in new tab)
Address
Not found
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

15 signals
  • Nov 3, 2026
    Permit
    I'm installing 20A disconnect for A/C unit. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 28, 2026
    Permit
    I'm replacing an existing 3x125Amp meter base with a single meter and adding an emergency disconnect. Also, I'm going to replace 3x125Amp sub panels for a new ones. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 17, 2026
    Permit
    I'm adding an EV charger. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Oct 14, 2026
    Permit
    I'm adding 40A circuit for a heat pump and 20A circuit for service outlet. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Sep 4, 2026
    Permit
    Converting living room heating circuit to A/C unit circuit. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Aug 23, 2026
    Permit
    I'm adding two 30A circuits for A/C unit. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 20, 2026
    Permit
    I'm replacing a panel without relocation. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Jul 8, 2026
    Permit
    I'm adding two 20A circuits for two bathrooms, which will feed bidet outlet, heated towel rack and heated floor in each bathroom. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 27, 2026
    Permit
    We are adding 2 can lights, heated floor, bidet and vanity receptacles in the bathroom. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 26, 2026
    Permit
    We are adding an EV charger, 3 receptacles and 4 can lights. (basement ADU UNIT OF THIS ADDRESS THAT HAS SEPERATE ADDRESS OF 5515 8TH AVE NW GOITJ 7-24-26) · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • May 26, 2026
    Permit
    Whole house rewiring · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 23, 2026
    Permit
    Panel replacement, no relocation · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 20, 2026
    Permit
    I'm adding 4 circuits (under 30 amp) and 50 amp for cooktop. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Mar 10, 2026
    Permit
    We are adding 5 circuits: 15A for additional lighting; 15A for hood; 20A for micro wave; 20A for kit countertop receptacles; 20A for bathroom receptacles. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)
  • Dec 16, 2025
    Permit
    100A Subpanel installation. 50 A Generator inlet installation with mechanical interlock. 60A EV Charger installation. · Electrical
    No product keyword matched · Seattle electrical permits
    Source record (opens in new tab)