Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 950 SECOND AVE LLC NYC DOB building permits | 11 | General Construction · General construction modifications taking place on the 1st fl & subcellar as per plans filed herewith. No change in use, egress or occupancy No product keyword matched | 5 | Nov 2, 2026 |
| B | COLLEGE POINT REALTY |
| 11 |
General Construction · To renovate the facade. no change in use, egress, and occupancy, No product keyword matched |
| 1 |
| Nov 2, 2026 |
| B | LION KING HOME IMPROVEMENT NYC DOB building permits | 11 | Foundation · APPLICATION FILING MINOR RENOVATION INCLUDING HORIZONTAL EXTENSION FOR EXISTING 1 FAMILY HOME TO OBTAIN FINAL CERTIFICATE OF OCCUPANCY. No product keyword matched | 2 | Nov 2, 2026 |
| B | TECH CONSTRUCTION, LLC NYC DOB building permits | 11 | General Construction · General construction work associated with renovations to existing apartment #14F. No change in occupancy, use or egress. No product keyword matched | 1 | Nov 2, 2026 |
| B | PETER DI NATALE & ASSOC I NYC DOB building permits | 11 | General Construction · ALT CO FILING TO CONVERT 1ST FLOOR UG 4 DAYCARE TO UG VI YOGA STUDIO. RENOVATE 2ND AND 3RD FLOOR RESIDENTIAL UNITS. No product keyword matched | 1 | Nov 2, 2026 |
| B | RALLY RESTORATION CORP NYC DOB building permits | 11 | General Construction · Facade repairs. No change to use, egress or occupancy. No product keyword matched | 1 | Nov 2, 2026 |
| B | Goldstar Properties LLC NYC DOB building permits | 11 | Plumbing · MINOR INTERIOR PLUMBING WORK TO UPDATED EXISTING BATHROOM & KITCHEN ON 1ST & 2ND FLOORS AND BOILER ROOM AT CELLAR - NO CHANGE TO USE, EGRESS, OR OCCUPANCY No product keyword matched | 2 | Nov 2, 2026 |
| B | ALMA DEVELOPERS LLC NYC DOB building permits | 11 | Full Demolition · Full demolition of a private one story two car garage. No product keyword matched | 4 | Nov 2, 2026 |
| B | JACOBS DEVELOPMENT CORPOR NYC DOB building permits | 11 | Mechanical Systems · Mechanical filing with units & associated ducts, associated with interior fit out for Pilates Studio. No product keyword matched | 3 | Nov 2, 2026 |
| B | COSME PLBG & HTG CORP NYC DOB building permits | 11 | Plumbing · Removal of plumbing fixtures as shown on drawings filed herewith. No change in occupancy, use, or egress. No product keyword matched | 1 | Nov 2, 2026 |
| B | GLYNN GROUP LLC NYC DOB building permits | 11 | General Construction · FILING HEREWITH INTERIOR RENOVATIION TO RECONSTRUCT WALL TO SEPARATE APT 21F AND 21G AS SHOWN ON DRAWINGS.. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 2, 2026 |
| B | PLANET RENOVATIONS INC NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH HORIZONTAL ENLARGEMENT AT REAR No product keyword matched | 5 | Nov 2, 2026 |
| B | 2921 BRIGHTON 4 LLC NYC DOB building permits | 11 | General Construction · PROPOSED NEW RESIDENTIAL BUILDING WITH 14 DWELLING UNITS No product keyword matched | 7 | Nov 2, 2026 |
| B | KNS BUILDING RESTORATION NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND MATERIAL STORAGE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Nov 2, 2026 |
| B | SUBSURFACE WATERMAIN& SWR NYC DOB building permits | 11 | Plumbing · HOUSE CONNECTION SEWER SLEEVE INSPECTION. No product keyword matched | 1 | Nov 2, 2026 |
| B | OUTSOURCE CONSULTANTS NYC DOB building permits | 11 | Structural · FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 2, 2026 |
| B | GREEK ORTHODOX COMMUNITY OF SAINT D NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Nov 2, 2026 |
| B | ASPHALT GREEN INC. NYC DOB building permits | 11 | Plumbing · REPLACEMENT IN KIND OF EXISTING DOMESTIC WATER BOOSTER PUMP AND PRESSURESTORAGE TANK. No product keyword matched | 1 | Nov 2, 2026 |
| B | PRIME CONSTRUCTION USA NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 6 | Nov 2, 2026 |
| B | SARWAR BUILDERS INC NYC DOB building permits | 11 | General Construction · FACADE RESTORATION WORK AS PER INDICATED ON PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Nov 2, 2026 |
| B | MFA 527 MADISON LLC NYC DOB building permits | 11 | Sprinklers · SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, BULK, EGRESS, OR OCCUPANCY IS PROPOSED. No product keyword matched | 3 | Nov 2, 2026 |
| B | NOVELTY CONSTRUCTION CORP NYC DOB building permits | 11 | Foundation · ALT-1 FILING FOR INTERIOR RENOVATION OF EXISTING 2-FAMILY DWELLING No product keyword matched | 11 | Nov 2, 2026 |
| B | ALLIANCE TRI-STATE CONSTR NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF NEW SIDEWALK SHED AT 1037 EVERGREEN AVENUE, BRONX AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 2, 2026 |
| B | Devils Harvest NYC DOB building permits | 11 | Mechanical Systems · Split system heat pump heating and air conditioning as well as mechanical ventilation No product keyword matched | 3 | Nov 2, 2026 |
| B | RUBI MANAGEMENT LLC NYC DOB building permits | 11 | General Construction · PROPOSED INTERIOR RENOVATION CONVERTING EXISTING 2 STORY AND BASEMENT INTO A 10 UNIT RESIDENTIAL BUILDING No product keyword matched | 5 | Nov 2, 2026 |
| B | AIR STREAM AIR CONDITIONI NYC DOB building permits | 11 | Mechanical Systems · Filing to replace existing (6) gas-fired Roof units with (6) Heat Pump Roof units as per plans. No change in use, egress, or occupancy under this application. No product keyword matched | 1 | Nov 2, 2026 |
| B | FOREMOST CONTRACTING & BU NYC DOB building permits | 11 | Support of Excavation · SOE work in conjunction with NB# 121207979 No product keyword matched | 2 | Nov 2, 2026 |
| B | PIFR Real Estate Holdings LLC NYC DOB building permits | 11 | Construction Fence · PROPOSED 8FT CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 4 | Nov 2, 2026 |
| B | GINO O LONGO RA NYC DOB building permits | 11 | Mechanical Systems · APPLICATION HEREWITH FILED FOR NEW MECHANICAL WORK ASSOCIATED WITH NB 220547549. No product keyword matched | 1 | Nov 2, 2026 |
| B | Chapin Home for the Aging NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF EXISTING SPACE. INSTALL NEW NON-LOAD BEARING PARTITIONS, FIXTURES, AND FINISHES. ALL DEMOLITION WAS FILED UNDER RELATED APPLICATION Q01300063. No product keyword matched | 2 | Nov 2, 2026 |
| B | BRICKYARD HOLDING MGT LLC NYC DOB building permits | 11 | General Construction · FILE APPLICATION TO REMOVE ILLEGAL TWO PIECES BATHROOM AND FULL HEIGHT PARTITIONS INSTALLED IN THE LIVING, DINING, AND FAMILY ROOMS, ALL LOCATED WITHIN THE CELLAR SUPERS APARTMENT. TO REMOVE VIOLATION NO# 39135735M. NO CHANGE IN USE, EGRESS,OR OCCUPANCY. No product keyword matched | 2 | Nov 2, 2026 |
| B | 600 PARTNERS CO., L.P. NYC DOB building permits | 11 | General Construction · Roof replacement, installation of guardrails on the 8th & 10th floor roof setback & beam reinforcement on the 10th floor roof setback as per plans. No change to use, egress or occupancy. No product keyword matched | 4 | Nov 2, 2026 |
| B | MEIR GLAZER CONSTRUCTION NYC DOB building permits | 11 | Foundation · Proposed one story horizontal addition, and minor interior renovation, and new concrete stair at cellar. No product keyword matched | 4 | Nov 2, 2026 |
| B | 14111 BM REALTY LLC NYC DOB building permits | 11 | Plumbing · FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q01392898 No product keyword matched | 1 | Nov 2, 2026 |
| B | MEDALLION REAL ESTATE NYC DOB building permits | 11 | General Construction · FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 2, 2026 |
| B | MATRIS HOLDING LLC NYC DOB building permits | 11 | General Construction · General construction related to the minor renovation of apartment 1A on the first floor. No product keyword matched | 1 | Nov 2, 2026 |
| B | 278 MOTT, LLC NYC DOB building permits | 11 | General Construction · INTERIOR DEMOLITION IN EXISTING 1ST FLOOR COMMERCIAL SPACE. REMOVE EXISTING FLOORING, CEILING TILES, EXISTING BATHROOMS, SHELVING, FURNITURE, NON-BEARING PARTITIONS AND CELLAR WALK IN COOLER. NO LOAD BEARING STRUCTURAL MEMBERS TO BE AFFECTED. No product keyword matched | 1 | Nov 2, 2026 |
| B | OMEGA POWER UP INC NYC DOB building permits | 11 | General Construction · REPLACE EXISTING BATHROOM PLUMBING FIXTURES, KITCHEN PLUMBING FIXTURES, FLOORING AND WINDOWS IN CELLAR AND 1ST TO 2ND FLOOR. LOWER SLAB AT CELLAR FLOOR, NEW STRUCTURAL BEAM AT CELLAR FLOOR. No product keyword matched | 1 | Nov 2, 2026 |
| B | 160 SMITH REALTY LLC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK ASSOCIATED WITH INTERIOR REMODELING OF ONE MEDICAL COMMERCIAL SPACE. INCLUDES INSTALLATION OF NEW HWH (NON-GAS) AND NEW PL FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Nov 2, 2026 |
| B | 42-12 35 ave LLc NYC DOB building permits | 11 | Mechanical Systems · THE SCOPE OF WORK IS OFFSET CHIMNEY PER NEW YORK CITY BUILDING CODE 2113.1.5 WHICH IS ALSO LISTED ON YORK CITY MECHANICAL CODE 801.1.1.1. No product keyword matched | 1 | Nov 2, 2026 |
| B | EBM DEVELOPMENT CO. LTD. NYC DOB building permits | 11 | General Construction · installation of billiards room and bar use group 6 No product keyword matched | 5 | Nov 2, 2026 |
| B | ARTISTIC DETAIL CONTRACT NYC DOB building permits | 11 | General Construction · RENOVATION OF APARTMENT 20A ON 19TH FLOOR/20TH MARKETING FLOOR. NON-STRUCTURAL PARTITION WORK, RELATED PLUMBING AND ELECTRICAL WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 3 | Nov 2, 2026 |
| B | STAR-CEL WATERPRO&REST CO NYC DOB building permits | 11 | Suspended Scaffold · SUSPENDED SCAFFOLD INSTALLATION FOR FACADE REPAIRS AND INSTALLATIONS No product keyword matched | 3 | Nov 2, 2026 |
| B | Fillmore East Realty LLC NYC DOB building permits | 11 | Plumbing · PROPOSED PLUMBING FIXTURE DEMO THROUGHOUT BUILDING AND NEW PLUMBING FIXTURES PROPOSED IN 1ST FLOOR COMMERCIAL SPACE. No product keyword matched | 2 | Nov 2, 2026 |
| B | EURO-COMFORT CORP NYC DOB building permits | 11 | Mechanical Systems · Upgrade of existing building heating plant. Replacement of gas fired hot water condensing boiler. No change in use, egress, or occupancy. No product keyword matched | 2 | Nov 2, 2026 |
| B | 965 44ST INC NYC DOB building permits | 11 | Plumbing · PLUMBING FIXTURE WITH ASSOCIATED PIPES FOR THE EXISTING FOUR FAMILY BUILDING RENOVATION. No product keyword matched | 3 | Nov 2, 2026 |
| B | 79TH STREET RESIDENCE CORP. NYC DOB building permits | 11 | General Construction · GENERAL CONSTRUCTION SCOPE OF WORK: KITCHEN & BATHROOM RENOVATION. MINORPARTITION AND CABINET REMOVAL, NEW PARTITIONS AND DOORS, DROPPED CEILINGS, NEW FINISHES AND CABINETRY PER PLANS FILED. NO CHANGE TO USE OCCUPANCY OR EGRESS No product keyword matched | 3 | Nov 2, 2026 |
| B | AAA KTV INC NYC DOB building permits | 11 | Plumbing · PROPOSED PLUMBING WORK ON PARTIAL 2ND FLOOR IN CONJUNCTION WITH DOB ALTERATION JOB #:Q01416556-I1. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Nov 2, 2026 |
| B | SDC LLC NYC DOB building permits | 11 | Mechanical Systems · New mechanical/HVAC system install in connection with duplex apartment renovation/combination including A/C and heating; kitchen and bath- / powder room venting and piping. No change to occupancy / use, egress or fire-protection under this application. No product keyword matched | 4 | Nov 2, 2026 |
| B | ROCKSTONE CONTRACTOR CORP. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 5 | Nov 2, 2026 |