General Construction · Roof replacement, installation of guardrails on the 8th & 10th floor roof setback & beam reinforcement on the 10th floor roof setback as per plans. No change to use, egress or occupancy.
General Construction · Roof replacement, installation of guardrails on the 8th & 10th floor roof setback & beam reinforcement on the 10th floor roof setback as per plans. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Roof replacement, installation of guardrails on the 8th & 10th floor roof setback & beam reinforcement on the 10th floor roof setback as per plans. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched · NYC DOB building permits
General Construction · Existing windows to be replaced with new windows on the 5th through 11th floors as per plans. No change to use, egress, or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · REPLACE EXISTING WINDOWS WITH NEW,THERMALLY BROKEN ALUMINUM WINDOWS ON THE 3RD THRU 12TH FLOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched · NYC DOB building permits
Sprinklers · Removal of sprinkler fixtures and installation of temp loop on the 5th thru 10th floors as per plans. No change to use, egress or occupancy.
No product keyword matched · NYC DOB building permits
General Construction · Removal of partitions, doors, ceilings and interior finishes on the ground, 5th thru 10th floors as per plans. No change to use. egress or occupancy.
No product keyword matched · NYC DOB building permits