Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Dunn Beulah XV, L.P. NYC DOB building permits | 11 | Structural · PROPOSE TO PROVIDE STRUCTURAL WORK TO REPAIR EXISTING ADA RAMP AS PER PLANS FILED HEREWITH. No product keyword matched | 5 | Nov 4, 2026 |
| B | RAZA CONSTRUCTION NY1 LLC NYC DOB building permits |
| 11 |
General Construction · APPLICATION FILING MINOR INTERIOR RENOVATION INCLUDING REPLACE SHEETROCK, TAPPING AND PAINTING AT 1ST AND 2ND FLOOR FOR EXISTING SINGLE FAMILY HOME AND EXISTING CO# 207672, DATED 03/29/1988 AS PER PLAN. NO CHANGE OF USE, EGRESS AND OCC No product keyword matched |
| 3 |
| Nov 4, 2026 |
| B | EFLOW PLUMBING & WATERMAIN INC NYC DOB building permits | 11 | Plumbing · JOB FILED HEREWITH FOR PLUMBING WORK IN AN EX. COM. SPACE ON THE GROUND FLOOR OF AN EX. MIXED USE 5-STORY BRICK BUILDING, INCL. NEW PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 6 | Nov 4, 2026 |
| B | DC 925 INC. NYC DOB building permits | 11 | Structural · PROPOSED STRUCTURAL WORK FILING IN CONJUNCTION WITH GC JOB#B08030525-I1 FOR A 6 STORY BUILDING WITH EXTENSION. No product keyword matched | 2 | Nov 4, 2026 |
| B | RANDHAWA CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · FILING HEREWITH PLANS AND APPLICATION TO RESTORE PROPERTY BACK TO LEGAL 2-FAMILY DWELLING, AND LEGALIZE EXISTING CELLAR CONDITIONS ( 3PC BATHROOM , CELLAR STAIRS AND LAUNDRY) .NO WORK ON FIRST FLOOR OR SECOND FLOORS. No product keyword matched | 2 | Nov 4, 2026 |
| B | BROOKDALE CONSTR LLC NYC DOB building permits | 11 | Structural · STRUCTURAL APPLICATION BEING FILED FOR NEW BUILDING. No product keyword matched | 4 | Nov 4, 2026 |
| B | ADI CONTRACTING LLC NYC DOB building permits | 11 | General Construction · Northwell Health: Extension BH Clinic: rearrange interior, non-bearing partitions, install hung ceiling, wall & floor finishes as per plans filed herewith. No change in use, occupancy or egress under this application. No product keyword matched | 3 | Nov 4, 2026 |
| B | 39 Tapir LLC NYC DOB building permits | 11 | Plumbing · Minor modification to existing bathrooms fixtures including removal of 2 existing bathrooms and relocate fixtures. No change in occupancy, use or egress. No product keyword matched | 5 | Nov 4, 2026 |
| B | Invision construction llc NYC DOB building permits | 11 | Mechanical Systems · Propose mechanical work, installation of kitchen exhaust hood at existing commercial space of eating and drinking establishment as per plan. No change in use, egress, or occupancy. No product keyword matched | 6 | Nov 4, 2026 |
| B | PLUMBING PLBG & PLBG CORP NYC DOB building permits | 11 | Plumbing · PLUMBING APPLICATION FOR DIRECT REMOVAL AND REPLACEMENT OF EXISTING BATHROOM FIXTURES IN SAME LOCATIONS FILING TO CAP AND REMOVE SINKS AS PER PLANS. THERE IS NO GAS WORK UNDER THIS APPLICATION NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Nov 4, 2026 |
| B | RROSHI CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · Interior renovation of Apt 2D as per plans filed herewith. Related plumbing work filed as a subsequent application. No change to use, egress and occupancy. No product keyword matched | 2 | Nov 4, 2026 |
| B | Lee Kum Kee USA Inc NYC DOB building permits | 11 | Sprinklers · PROVIDE NEW FIRE SPRINKLER SYSTEM THROUGHOUT WAREHOUSE (ALT 2#B01388059-I1) No product keyword matched | 3 | Nov 4, 2026 |
| B | Eagle Metalworks NJ LLC NYC DOB building permits | 11 | General Construction · FILING TO INSTALL EXTERIOR ALUMINUM FRAMING AND PANELS AT FRONT FACADE ELEVATION WITH POST INSTALLED ANCHOR BOLTS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Nov 4, 2026 |
| B | UNITED RESTORATION & DEV NYC DOB building permits | 11 | Structural · ramp modification No product keyword matched | 2 | Nov 4, 2026 |
| B | 71ST REALTY ASSOCIATES LLC NYC DOB building permits | 11 | General Construction · HEREBY FILING GENERAL CONSTRUCTION WORK AT 4TH FLOOR UNIT 3A AS PER PLANS No product keyword matched | 2 | Nov 4, 2026 |
| B | CHRISTINE MARIE TROPEA.LL NYC DOB building permits | 11 | General Construction · Interior renovation of apartment 33i. No change to Use , egress or Occupancy No product keyword matched | 2 | Nov 4, 2026 |
| B | MARCY LLC NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 3 | Nov 4, 2026 |
| B | EAST COAST OFFICE SOLUT NYC DOB building permits | 11 | General Construction · Installaton of non load bearing partitions as per plans filed herewith. No change in use egress or occupancy No product keyword matched | 8 | Nov 4, 2026 |
| B | SHOBRO MANAGEMENT NYC DOB building permits | 11 | Plumbing · Plumbing work in connection with Interior renovation of 3rd floor for medical office. No product keyword matched | 7 | Nov 4, 2026 |
| B | Sora by Masuta NYC DOB building permits | 11 | Plumbing · Plumbing and sprinkler installation for eating and drinking establishment. No change in egress, use or occupancy. No product keyword matched | 2 | Nov 4, 2026 |
| B | STATECOURT ENTERPRISES INC. NYC DOB building permits | 11 | Plumbing · APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 5TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 4 | Nov 4, 2026 |
| B | SHINING SKY INC NYC DOB building permits | 11 | Structural · CREATING STRUCTURAL DESIGN FOR 2 1/2 STORY HORIZONTAL EXTENSION WITH 1 1/2 STORY VERTICAL ENLARGEMENT TO EXISTING 1 STORY BUILDING. STRUCTURAL WORK IN CONJUNCTION WITH GC B01106121-I1 No product keyword matched | 4 | Nov 4, 2026 |
| B | SHAPEL GENERAL CONTRACTIN NYC DOB building permits | 11 | Mechanical Systems · Filing subsequent application for installation of mechanical unit and equipment as per plans. No product keyword matched | 2 | Nov 4, 2026 |
| B | 55TH STREET TSADIK LLC NYC DOB building permits | 11 | Structural · Filing to address ECB# 34950967K. No product keyword matched | 2 | Nov 4, 2026 |
| B | MANNY & L CONTRACTING COR NYC DOB building permits | 11 | Structural · Partial floor structural repair in basement and first floor No product keyword matched | 2 | Nov 4, 2026 |
| B | Florence Brown NYC DOB building permits | 11 | Boiler Equipment · REPLACE BOILER AND OIL BURNER. No product keyword matched | 3 | Nov 4, 2026 |
| B | JOINT CAPITAL DEVELOPMENT NYC DOB building permits | 11 | Mechanical Systems · Mechanical work in conjunction with the NB application B00872556-I1. No product keyword matched | 3 | Nov 4, 2026 |
| B | ANCHOR MAINT GROUP INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED (300 PSF) AS PER PLANS FOR FACADE WORK UNDER JOB Q01435429-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. No product keyword matched | 2 | Nov 4, 2026 |
| B | 724 PELHAM PARKWAY LLC NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF OUTRIGGER FOR THE FACADE REPAIR WORK AS PER PLAN SUBMITTED. No product keyword matched | 1 | Nov 4, 2026 |
| B | RECHEN 1076, LLC NYC DOB building permits | 11 | Plumbing · FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B01483058 No product keyword matched | 2 | Nov 4, 2026 |
| B | AB CAPITAL DEVELOPMENT NYC DOB building permits | 11 | Structural · ERECT A COVERED PORCH IN FRONT OF AN EXISTING ONE-FAMILY RESIDENCE. No product keyword matched | 3 | Nov 4, 2026 |
| B | 237 APT CORP NYC DOB building permits | 11 | Structural · Structural work, floor framing repair and reinforcement at basement & 1st floor. No change in use, egress or occupancy. No product keyword matched | 1 | Nov 4, 2026 |
| B | PRIMAL GENERAL CONSTRUCTI NYC DOB building permits | 11 | General Construction · SCOPE OF WORK APPLIES TO THE FACADE RESTORATION OF THE BUILDING INCLUDES REBUILD PARAPET WALL, BRICK/LINTEL REPLACEMENT & POINTING AS REQUIRED AS PER PLAN SUBMITTED HEREWITH. NO CHANGE IN BULK, USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | 535 GRAND AVENUE LLC NYC DOB building permits | 11 | Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 3 | Nov 4, 2026 |
| B | WHITEHALL PROPERTIES LLC NYC DOB building permits | 11 | Mechanical Systems · Installation of 2 new exhaust fan at roof to resolve violation #39158379R as shown on plans filed herewith. No product keyword matched | 1 | Nov 4, 2026 |
| B | G & S CONSTRUCTION VENTUR NYC DOB building permits | 11 | General Construction · Interior renovation of a 2 story townhouse with basement. Modification to facade, windows, partitions, floors, doors, ceilings and related work. No change in occupancy, use or egress. No product keyword matched | 1 | Nov 4, 2026 |
| B | L.RISO & SONS CO INC NYC DOB building permits | 11 | Construction Fence · INSTALL NEW TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH NEW BUILDING. No product keyword matched | 3 | Nov 4, 2026 |
| B | CASILLAS CONTRACTING INC NYC DOB building permits | 11 | Mechanical Systems · 4TH FLOOR APARTMENT RENOVATIONS TO INCLUDE CONSTRUCTION OF A FLOOR-TO-CEILING WALL ANDPOCKET DOOR. CREATE A LARGER BATHROOM AND ONE LARGE BEDROOM. NO CHANGE TO USE, EGRESS, OROCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | TGG 43 AVE LLC NYC DOB building permits | 11 | General Construction · PARTIAL INTERIOR ALTERATION OF AN EXISTING THREE-FAMILY DWELLING BUILDING. NON-LOAD BEARING PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF FIXTURES, FINISHES, AND LIGHTING AS PER PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Nov 4, 2026 |
| B | ACRUZ CONSTRUCTION CROP NYC DOB building permits | 11 | General Construction · ROOF REPAIR AND MEMBRANE REPLACEMENT AS PER PLANS. FILING TO ADDRESS WWP VIOLATION 39164682K. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Nov 4, 2026 |
| B | INTER-REALTY INC NYC DOB building permits | 11 | Construction Fence · installation of 252 ln/ ft of new construction fence No product keyword matched | 1 | Nov 4, 2026 |
| B | AUM BUILD CORP. NYC DOB building permits | 11 | Structural · THE PROPOSED STRUCTURAL WORK INVOLVES REPAIR OF THE EXISTING FACADE. No product keyword matched | 1 | Nov 4, 2026 |
| B | ADN CONTRACTING LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF APARTMENT #9DE AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | J&SBOND NYC DOB building permits | 11 | Sprinklers · INSTALLATION OF NEW SPRINKLER SYSTEM AS PER PLANS No product keyword matched | 1 | Nov 4, 2026 |
| B | NU WORLD CAPITAL LLC NYC DOB building permits | 11 | Mechanical Systems · FILED TO LEGALIZE A/C UNITS AND WALK-IN BOX COMPRESSORS ON ROOF FOR A 1-STORY COMMERCIAL BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Nov 4, 2026 |
| B | MGI DESIGNED INTERIORS NYC DOB building permits | 11 | General Construction · new interior partitions and finishes in units 10R and 10S on the 9th construction floor as per plans filed. No change in use, occupancy, or egress. No product keyword matched | 1 | Nov 4, 2026 |
| B | Artemis Wax Corp NYC DOB building permits | 11 | Mechanical Systems · Install (1) 8-ton Condenser and (2) High Static Pressure Duct (48,000 BTU) Indoor Unit No product keyword matched | 1 | Nov 4, 2026 |
| B | J M G PAINTER DECORATOR C NYC DOB building permits | 11 | General Construction · MINOR INTERIOR RENOVATION FOR NON-LOAD BEARING PARTITIONS No product keyword matched | 1 | Nov 4, 2026 |
| B | MID BRONX SENIOR CITIZENS COUNCIL NYC DOB building permits | 11 | Mechanical Systems · INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Nov 4, 2026 |
| B | VILLAGE MANAGEMENT INCORPORATED NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC No product keyword matched | 1 | Nov 4, 2026 |