Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/SHINING SKY INC
Back to prospects

SHINING SKY INC

Brooklyn, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 11 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness5 / 5Latest signal is within 30 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
SHINING SKY INC
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Nov 4, 2026
Source for Signal date (opens in new tab)
Signal count
4 saved signals, 4 in the last 90 days
Signal summary
Structural · CREATING STRUCTURAL DESIGN FOR 2 1/2 STORY HORIZONTAL EXTENSION WITH 1 1/2 STORY VERTICAL ENLARGEMENT TO EXISTING 1 STORY BUILDING. STRUCTURAL WORK IN CONJUNCTION WITH GC B01106121-I1
Source for Signal summary (opens in new tab)
Address
2611 W 2ND STREET #6C
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

4 signals
  • Nov 4, 2026
    Permit
    Structural · CREATING STRUCTURAL DESIGN FOR 2 1/2 STORY HORIZONTAL EXTENSION WITH 1 1/2 STORY VERTICAL ENLARGEMENT TO EXISTING 1 STORY BUILDING. STRUCTURAL WORK IN CONJUNCTION WITH GC B01106121-I1
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 4, 2026
    Permit
    Support of Excavation · CREATING EXCAVATION DESIGN FOR 2 1/2 STORY HORIZONTAL EXTENSION WOOD FRAME BUILDING. SOE WORK IN CONJUNCTION WITH GC B01106121-I1 . EXCAVATION WITH 1:1 SLOPE FROM THE HORIZONTAL DOWN TO THE REQUIRED ELEVATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 23, 2026
    Permit
    General Construction · PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT ON EXISTING TWO STORY & ATTIC BUILDING TOCOMPLY WITH NEW BUILDING REQUIREMENTS FOR NEW C of O.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Oct 22, 2026
    Permit
    Foundation · CREATING FOUNDATION DESIGN FOR 2 1/2 STORY WOOD FRAMING BUILDING. FOUNDATION WORK IN CONJUNCTION WITH GC B01106121-I1. NO UNDERPINING REQUIRED UNDER THIS APPLICATION. NO DEWATERING BE REQUIRED UNDER THIS APPLICATION.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)