Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 23RD STREET LOFT CORP. NYC DOB building permits | 8 | General Construction · WE PROPOSE TO RENOVATE EXISTING COMMERCIAL SPACE TO CONSTRUCT AND INSTALL A NEW PHARMACY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Feb 19, 2026 |
| B | HERCULES HOME IMPROVEMENT |
| 8 |
General Construction · RENOVATION OF APARTMENT #12B. PARTITION WORK AND FINISHES PER PLAN. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched |
| 0 |
| Feb 19, 2026 |
| B | True Jesus Church NYC DOB building permits | 8 | Mechanical Systems · Hereby filing to convert existing single family house to Community Center, work to include new interior partitions, new stair, new windows, kitchen, bathrooms and equipment No product keyword matched | 0 | Feb 19, 2026 |
| B | OCEAN PACIFIC INTERIORS * NYC DOB building permits | 8 | Mechanical Systems · Mechanical modifications to floors 1 and 2 as per plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 0 | Feb 19, 2026 |
| B | SCHULMAN MANAGEMENT NYC DOB building permits | 8 | Mechanical Systems · Installing new commercial hood, fire suppression system and outside duct and fan. No product keyword matched | 0 | Feb 19, 2026 |
| B | BUILDERS SOURCE USA LLC NYC DOB building permits | 8 | Mechanical Systems · Mechanical Systems filed in conjunction with NB # B00898115-I1 No product keyword matched | 0 | Feb 19, 2026 |
| B | HARPIA NYC DOB building permits | 8 | Mechanical Systems · Propose Mechanical Scope of work filed in conjunction with NB # 321599409. No product keyword matched | 0 | Feb 19, 2026 |
| B | LEGENDS LIMOUSINE NYC DOB building permits | 8 | Plumbing · PLUMBING WORK TO CORRECT ECB VIOL# 35667848K, DOB VIOL# 090125CCER08CR AND 090225IMEGNCY19515. NEW PLUMBING FIXTURES THROUGHOUT BUILDING, REMOVE PLUMBING FIXTURES IN CELLAR. No product keyword matched | 0 | Feb 19, 2026 |
| B | Cantina Sociale Bedstuy Inc. NYC DOB building permits | 8 | Plumbing · HEREBY FILING FOR THE INTERIOR RENOVATION OF THE GROUND FLOOR COMMERCIAL SPACE IN A MIXED USE BUILDING (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPAN No product keyword matched | 0 | Feb 19, 2026 |
| B | NYC DOE NYC DOB building permits | 8 | Plumbing · Legalize existing LAARS Gas Fired Water Heater (MODEL#PWO715IN09K). Legalization scope of work is limited to the exist LAARS water heater's domestic and gas piping only. No change to use, egress or occupancy. No product keyword matched | 0 | Feb 19, 2026 |
| B | ALBA IMPROVEMENT CORP NYC DOB building permits | 8 | Mechanical Systems · INSTALL THREE NEW THRU-WALL AIR CONDITIONING UNITS IN THE LIVING ROOM AND BEDROOMS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Feb 19, 2026 |
| B | ST. SAVIOUR CATHOLIC ACADEMY NYC DOB building permits | 8 | Structural · STRCUTURAL CONSTRUCTION OF A ROOFTOP/PLAY AREA ON A NEW RAISEDDECK FRAMED OVER EXISTING ROOF STRUCTURE AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Feb 19, 2026 |
| B | Dermot Company NYC DOB building permits | 8 | General Construction · INSTALL REPLACEMENT SPLIT HEAT PUMP SYSTEM FOR EXISTING ELEVATOR MACHINE ROOM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 19, 2026 |
| B | GEORGE MARAGOS NYC DOB building permits | 8 | General Construction · Interior renovation of the basement, first and second floors of this 2-family house, with new partitions, finish materials throughout, and ductless electric split ac units, as per plans. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Feb 19, 2026 |
| B | CLEAN 4 U NYC CORP NYC DOB building permits | 8 | General Construction · REMOVAL OF INTERIOR NON LOAD BEARING WALLS AS PER THE PLANS. No product keyword matched | 0 | Feb 19, 2026 |
| B | JMS 2 BRO HOME IMPROVE NYC DOB building permits | 8 | General Construction · FILING PAA to revise controlled inspection list only, no change in plans, work, scope, or cost proposed under this PAA, adding structural stability to special inspection list under this action No product keyword matched | 0 | Feb 19, 2026 |
| B | ZERO OTTO NYC DOB building permits | 8 | Mechanical Systems · DIRECT REPLACMENT OF 2 ROOFTOP CONDENSING UNITS WITH A TOTAL CAPACITY OF 17.5 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Feb 19, 2026 |
| B | WING & FEE AND FAMILY REALTY INC NYC DOB building permits | 8 | General Construction · Remove 5 non-illuminated advertising/awning/business signs in order to remedy ECB violation number 39171958H. No change in egress, occupancy or use is involved under this application. No product keyword matched | 0 | Feb 19, 2026 |
| B | The French Japanese Educational Ins NYC DOB building permits | 8 | General Construction · Removal of playground equipment on the roof as per plans. No change to use, egress or occupancy. No product keyword matched | 0 | Feb 19, 2026 |
| B | Gerard Owners Corp. NYC DOB building permits | 8 | Mechanical Systems · Upgrade of existing cooling tower. No change in use, egress or occupancy. No product keyword matched | 0 | Feb 19, 2026 |
| B | MANOR MANAGEMENT LLC NYC DOB building permits | 8 | General Construction · Install new marquee as per plans filed. No change in use, egress or occupancy. No product keyword matched | 0 | Feb 19, 2026 |
| B | MY CONTRACTING COMPANY I* NYC DOB building permits | 8 | General Construction · RENOVATE EXISTING APARTMENT PH1 ON THE 6TH FLOOR; WORK TO INCLUDE REMOVING AND INSTALLING NON-BEARING PARTITION WORK AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 19, 2026 |
| B | YESHIVA OHR YISRAEL NYC DOB building permits | 8 | Mechanical Systems · Filing for the installation of two 12-Ton Heat Pump Systems. No change in use, egress or occupancy. No product keyword matched | 0 | Feb 19, 2026 |
| B | MJD HOLDINGS LLC NYC DOB building permits | 8 | General Construction · RENOVATION TO REMOVE ILLEGAL STORAGE EXTENSION, LEGALIZE ROLL DOWN GATE AT 1ST FLOOR AS PER PLANS FILED HEREWITH, TO RESOLVE VIOLATION. No product keyword matched | 0 | Feb 19, 2026 |
| B | BULLER GROUP NYC DOB building permits | 8 | Mechanical Systems · REPLACEMENT OF CHILLER HEATER ON THE ROOFTOP WITH A TOTAL CAPACITY OF 120.4 KBTU/H. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Feb 19, 2026 |
| B | FZEE MANAGEMENT, LLC NYC DOB building permits | 8 | Full Demolition · HAND DEMO OF A WOOD FRAME ACCESSORY STRUCTURE No product keyword matched | 0 | Feb 19, 2026 |
| B | ODM CONSTRUCTION LLC. NYC DOB building permits | 8 | Sprinklers · Installation of Sprinkler System No product keyword matched | 0 | Feb 19, 2026 |
| B | NEW ERA DEVELOPMENT GROUP NYC DOB building permits | 8 | General Construction · Full interior renovation of apartment 3F No product keyword matched | 0 | Feb 19, 2026 |
| B | LP FAMILY TRUST NYC DOB building permits | 8 | Plumbing · APPLICATION FILED IN CONJUNCTION WITH ALT-CO TO CONVERT FROM FOURFAMILIES TO TWO FAMILIES AND VERTICALLY ENLARGE BUILDING FROM TWOTO FOUR STORIES AND TO RESOLE ECB VIOLATION #39119350L. ALL AS PERPLANS FILED HEREWITH. No product keyword matched | 0 | Feb 19, 2026 |
| B | NAN NYC DOB building permits | 8 | General Construction · This project is filed for some interior repair work at the 1st, 2nd&3rd floors after fire and smoke damage in some areas of the building, no change of Use egress or occupancy No product keyword matched | 0 | Feb 19, 2026 |
| B | GSB PLUMBING & HEATING CO NYC DOB building permits | 8 | Plumbing · INSTALL TWO DIRECT VENT GAS BOILERS. No product keyword matched | 0 | Feb 19, 2026 |
| B | 2018 AVE J LLC NYC DOB building permits | 8 | Construction Fence · TEMPORARY CONSTRUCTION FENCE No product keyword matched | 0 | Feb 19, 2026 |
| B | 185 STEVEN CORP NYC DOB building permits | 8 | Plumbing · RELOCATION AND NEW INSTALLATION OF PLUMBING FIXTURES AND GAS APPLIANCES IN CELLAR, FIRST, SECOND AND THIRD FLOOR. No product keyword matched | 0 | Feb 19, 2026 |
| B | NEW AMSTERDAM REALTY, LLC NYC DOB building permits | 8 | Structural · INSTALL NEW DROPPED GIRDER BELOW FIRST FLOOR FRAMING WITH NEW LALLY COLUMNS AND FOOTINGS IN CELLAR. FILED TO REPLACE BIS APPLICATION # 101273168 AND TO ADDRESS PEREMPTORY VACATE ORDER VAC 21-95 NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 19, 2026 |
| B | 183-185 COLUMBIA ST INC NYC DOB building permits | 8 | Plumbing · INSTALLATION OF PLUMBING WORK ON 4TH AND 5TH FLOOR AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Feb 19, 2026 |
| B | DYNAMO ELECTRICAL CORP NYC DOB electrical permits | 8 | Upgrading Electrical Panel No product keyword matched | 0 | Feb 19, 2026 |
| B | METRO PROP NYC DOB building permits | 8 | General Construction · REPLACEMENT OF STAIRS FROM FIRST FLOOR TO CELLAR FLOOR. NO CHANGE IN BULK OR OCCUPANCY No product keyword matched | 0 | Feb 18, 2026 |
| B | VILLAGE P & H NY INC NYC DOB building permits | 8 | Plumbing · PROPOSE PLUMBING WORK ON 1ST FLOOR OF EXISTING THREE FAMILY WALK-UP APARTMENT, NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 18, 2026 |
| B | MINOTT RENOVATION LLC NYC DOB building permits | 8 | Mechanical Systems · NEW SPLIT SYSTEM HEATING AND COOLING FOR EXISTING FOUR-FAMILY, TWO-STORY + CELLAR DWELLING, IN CONNECTION WITH OT APPLICATION #01220190-I1. No product keyword matched | 0 | Feb 18, 2026 |
| B | METROPOLITAN MEDICAL AND SURGICAL P NYC DOB building permits | 8 | Structural · Steel support for MRI equipment installation No product keyword matched | 0 | Feb 18, 2026 |
| B | SIGN WORLD INC. NYC DOB building permits | 8 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - BAKER HEALTH. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 18, 2026 |
| B | FOSTER DEVELOPMENT.LLC NYC DOB building permits | 8 | General Construction · LEGALIZATION FILED FOR THE NEW DRIVEWAY PAVEMENT. No product keyword matched | 0 | Feb 18, 2026 |
| B | Goldmont Realty Corp NYC DOB building permits | 8 | Solar · Installation of ballast mounted PV solar energy system on roof. No change of use, egress, or occupancy. No product keyword matched | 0 | Feb 18, 2026 |
| B | LIGHTSTONE NYC DOB building permits | 8 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE MATERIAL HOIST RACK INSIDE THE BUILDING FROM THE GROUND FLOOR TO THE 2ND FLOOR SLAB. No product keyword matched | 0 | Feb 18, 2026 |
| B | STANTON BUILDING COMP INC NYC DOB building permits | 8 | General Construction · PROPOSED RENOVATION No product keyword matched | 0 | Feb 18, 2026 |
| B | BELIDA ASSOCIATES INC NYC DOB building permits | 8 | General Construction · finishes and millwork replacement. Replacement of fixtures and appliances. Minor partition work. No product keyword matched | 0 | Feb 18, 2026 |
| B | MALCOLM X BH MAZAL LLC NYC DOB building permits | 8 | Plumbing · PROPOSED PLUMBING WORK FILED IN CONJUCTION WITH ALT-CO B01076333-I1 INCLUDING INSTALLMENT OF NEW FIXTURES & CAP-REMOVE ALL GAS IN THE BUILDING AS PER PLANS. No product keyword matched | 0 | Feb 18, 2026 |
| B | TOWER NYC DOB building permits | 8 | Plumbing · EXISTING 2 FAMILY HOUSE WITH PULMBING WORK AT CELLAR,BASEMENT,1 ST AND 2ND FLOOR,JOB FILED TO RELATED TO ALT2 APPLICATION #B01345646-I1.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY. No product keyword matched | 0 | Feb 18, 2026 |
| B | HAMILTON HEIGHTS CLUSTER ASSOCIATES NYC DOB building permits | 8 | Mechanical Systems · Respectfully filing for mechanical work as per proposed plans submitted. No product keyword matched | 0 | Feb 18, 2026 |
| B | GRS MASONRY INC NYC DOB building permits | 8 | Curb Cut · New Curb Cut installation in conjunction with S01248482. No change in use, egress or occupancy. No product keyword matched | 0 | Feb 18, 2026 |