Protection and Mechanical Methods · INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE MATERIAL HOIST RACK INSIDE THE BUILDING FROM THE GROUND FLOOR TO THE 2ND FLOOR SLAB.
Protection and Mechanical Methods · INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE MATERIAL HOIST RACK INSIDE THE BUILDING FROM THE GROUND FLOOR TO THE 2ND FLOOR SLAB.
No product keyword matched · NYC DOB building permits
General Construction · TENANT FITOUT ADJUSTMENTS AT CELLAR, 1st FLOOR AND 2ND FLOOR. BUILDING OUT COMMERCIAL ELEVATORS CONNECTING 3 FLOORS ENCLOSED SPACES ADJACENT TO OPEN FLOOR PLAN. THERE IS NO PROPOSED CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits