Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | DELIHUT MARKET NYC DOB building permits | 9 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | VERTICAL RIGGING INC NYC DOB building permits |
| 9 |
Suspended Scaffold · Inspection of existing conditions for telecom upgrade. No product keyword matched |
| 0 |
| Jun 26, 2026 |
| B | R.A. COHEN & ASSOCIATES, INC. NYC DOB building permits | 9 | Antenna · Modification to T-Mobile site. Installing 3 antennas and 9 RRU's on the roof. Replace 9 antennas on the roof. Remove 1 cabinet and install 2 cabinets on existing steel platform on the roof. No product keyword matched | 0 | Jun 26, 2026 |
| B | AISEN RESIDENCE 1580 DEKALB LLC NYC DOB building permits | 9 | Plumbing · PLUMBING WORK TYPE TO BE FILED FOR 4-STORY BUILDING. No product keyword matched | 0 | Jun 26, 2026 |
| B | True Care ventures NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EXISTING OFFICE ON 2ND FLOOR AND 3RD FLOORAS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | 462 AMSTERDAM LLC NYC DOB building permits | 9 | General Construction · REMOVE AN EXT. OUTDOOR EATING ENCLOSURE OF AN EXISTING RESTAURANT @ 1ST FLOOR TO RESOLVE OATH/ECB VIOLATIONS: 35688450N & 39174269X. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Jun 26, 2026 |
| B | LESLIE GRANT NYC DOB building permits | 9 | Sprinklers · PROPOSE SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH ALT#321736074 No product keyword matched | 0 | Jun 26, 2026 |
| B | 37-55 61 ST LLC NYC DOB building permits | 9 | Construction Fence · PROPOSED TEMPORARY CONSTRUCTION FENCE @ GROUND FLOOR. THE FENCE IS OUTSIDE OF PROPERTY LINE WITHIN 3 FEET ONLY BEYOND THE PROPERTY LINE. THIS JOB IS FILED IN CONJUNCTION WITH A1 JOB#420666372 No product keyword matched | 0 | Jun 26, 2026 |
| B | REAL POWER ELECTRIC INC NYC DOB electrical permits | 9 | Correct device count for all receptacles, light switches and lights with a total of (92) No product keyword matched | 0 | Jun 26, 2026 |
| B | ARCTIC BAY INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EXISTING 1ST FLOOR PER PLAN OF AN EXISTING ONE FAMILY DWELLING. WORK INCLUDES NEW PARTITION, FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 0 | Jun 25, 2026 |
| B | MATCO SERVICE CORP NYC DOB building permits | 9 | Mechanical Systems · Proposed mechanical work at 1st floor and mezzanine as per plan. No change in use, egress, or occupancy. No product keyword matched | 0 | Jun 25, 2026 |
| B | BARONE MANAGEMENT NYC DOB building permits | 9 | Standpipe · INSTALLATION OF A SPRINKLER - STANDPIPE SYSTEM FOR A CONVERSION OF A 1 STORY BUILDING INTO A 3 STORY BUILDING No product keyword matched | 0 | Jun 25, 2026 |
| B | BELVEDERE SITEWORK INC NYC DOB building permits | 9 | Mechanical Systems · FILING FOR MECHANICAL WORK IN CHILD DAYCARE SPACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Jun 25, 2026 |
| B | BLUEWATER P&H, INC NYC DOB building permits | 9 | Sprinklers · SP WORK FILED IN CONJUNCTION WITH DOB NOW GC PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 25, 2026 |
| B | BONA LLC NYC DOB building permits | 9 | Plumbing · Sprinkler and plumbing plans filed in conjunction with NB B01201594-I1. Provide new sprinkler system and plumbing system (domestic water system, storm water system, sanitary water system) for entire building. No product keyword matched | 0 | Jun 25, 2026 |
| B | NYC MAINMAN CORP NYC DOB building permits | 9 | Plumbing · SUBSEQUENT FILING FOR EXTERIOR PLUMBING WORK. INSTALL OF NEW SITE CONNECTION WITH DEP APPROVAL# 3935/25 No product keyword matched | 0 | Jun 25, 2026 |
| B | METRO MECHANICAL GROUP IN NYC DOB building permits | 9 | Plumbing · Repair and test gas piping. No major change in egress, nor use group, nor occupancy group. No product keyword matched | 0 | Jun 25, 2026 |
| B | NYC HUMAN RESOURCES ADMINISTRATION NYC DOB building permits | 9 | General Construction · PROPOSED NEW MIXED USE COMMUNITY FACILITY AND COMMERCIAL 4 STORY BUILDING. No product keyword matched | 0 | Jun 25, 2026 |
| B | 77 barrow st ll NYC DOB building permits | 9 | Plumbing · PLUMBING WORK AS PER PLANS HEREWITH FILED. No product keyword matched | 0 | Jun 25, 2026 |
| B | STREAM REALTY NYC DOB building permits | 9 | General Construction · Exterior Facade repairs as per the plans filed including: Removal and replacement of cracked/spalled masonry units, joint sealant, terra-cotta units, steel lintels, precast coping and window frame parts. Masonry Re-Pointing. No product keyword matched | 0 | Jun 25, 2026 |
| B | SASSO CAPITAL LLC NYC DOB building permits | 9 | General Construction · STORE RENOVATION INCLUDING REMOVAL OF MILLWORKS, PATCH, PAINT, AND CLEANING OF DEBRIS ON WALLS, CEILING, FLOOR, AND STOREFRONT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 25, 2026 |
| B | 26 W. 9TH STREET LLC NYC DOB building permits | 9 | Mechanical Systems · Installation of New VRV Systems made up of condensing units on the Roof piped to evaporators at each floor to provide Heating/Cooling throughout building. Exhaust is provided to BOH spaces, Cellar, trash closets. Electric Unit heaters provided throughout. No product keyword matched | 0 | Jun 25, 2026 |
| B | LAMBO CONSTRUCTION, INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF AN EXISTING 2-FAMILY RESIDENTIAL TOWNHOUSE. DUPLEX ON BASEMENT AND 001. APARTMENT ON 002. WORK TO INCLUDE REMOVAL AND REPLACEMENT OF NON-LOADBEARING PARTITIONS AND DOORS AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 25, 2026 |
| B | 5815 57RD LLC NYC DOB building permits | 9 | Structural · FILE STRUCTURE IN CONJUNCTION WITH JOB#Q01142245 No product keyword matched | 0 | Jun 25, 2026 |
| B | TOB 619 LLC NYC DOB building permits | 9 | Full Demolition · This application is filed to legalized full demolished of garage. No product keyword matched | 0 | Jun 25, 2026 |
| B | 168Herkimer LLC NYC DOB building permits | 9 | Mechanical Systems · THE SCOPE OF WORK INCLUDES BUT NOT LIMITED TO THE FOLLOWING: FURNISH AND INSTALL AIR-CONDITIONING UNITS, HEAT PUMP, FANS, HEATERS ETC. AT LOCATIONS AS SHOWN ON MECHANICAL DRAWINGS. PROVIDE ALL OTHER WORK ITEMS INDICATED ON DRAWINGS AND SPECIFICATIONS No product keyword matched | 0 | Jun 25, 2026 |
| B | INTERGATE.MANHATTAN LLC NYC DOB building permits | 9 | Sprinklers · Herewith filing for modification of existing sprinkler system on the 6th floor as per the drawings. No change in use, egress or occupancy. No product keyword matched | 0 | Jun 25, 2026 |
| B | 2315 CLOYSTER LLC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EXISTING TWO STORY HOUSE TO CLEAR ECB VIOLATIONS #39150680J; 39150679M; 39139317H; 39139314M; 35483906N; 35483182R; 35483138J. NO CHANGE IN USE, OCCUPANCY OR EGRESS No product keyword matched | 0 | Jun 25, 2026 |
| B | Hamilton deli & grill inc NYC DOB building permits | 9 | Plumbing · INSTALL NEW COOKING EQUIPMENT, PLUMBING FIXTURES AS PER PLAN NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 25, 2026 |
| B | 162-11 UNION LLC NYC DOB building permits | 9 | Plumbing · FILED PLUMBING AND SPRINKLER WORK FOR A 3-STORY 2-FAMILY BUILDING. No product keyword matched | 0 | Jun 25, 2026 |
| B | TREVOR DAY SCHOOL NYC DOB building permits | 9 | Sprinklers · Modifications of an existing Sprinkler System No product keyword matched | 0 | Jun 25, 2026 |
| B | L&M PLUMBING LLC NYC DOB building permits | 9 | Plumbing · FILE PLUMBING WORK IN CONJUNCTION WITH JOB #: Q01367406-I1. No product keyword matched | 0 | Jun 25, 2026 |
| B | ●●-●●● NYC DOB building permits | 9 | General Construction · CSC#24203 Interior renovation of existing store including installation of non-loadbearing partitions, finishes, lights, and equipment to accommodate Cold Stone Creamery. No change in use, egress, floor area or occupancy under this application No product keyword matched | 0 | Jun 25, 2026 |
| B | 26 WEST 9TH STREET LLC NYC DOB building permits | 9 | General Construction · RENOVATION BEING FILED TO ENCLOSE INTERIOR STAIRS, EXTEND STAIR TO ROOF, CONVERT DOCTORS OFFICES TO APARTMENTS AND RENOVATE EXISTING DWELLING UNITS. No product keyword matched | 0 | Jun 25, 2026 |
| B | Stacy development group NYC DOB building permits | 9 | Plumbing · Exterior Storm Piping No product keyword matched | 0 | Jun 25, 2026 |
| B | sunflower house llc NYC DOB building permits | 9 | General Construction · NB detached accessory 1-car garage filed in conjunction with Alt-CO# Q01349377-i1 alteration & expansion of a detached 1-family plus 1-ADU house No product keyword matched | 0 | Jun 25, 2026 |
| B | WOOLLY MAMMOTH LLC NYC DOB building permits | 9 | Structural · RENOVATION OF EXISTING COURTYARD. WORK INCLUDES CONSTRUCTION OF NEW CONCRETEPLANTERS AND A NEW STEEL-FRAMED CANOPY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 25, 2026 |
| B | COMMERCIAL CONSTRUCTION M NYC DOB building permits | 9 | Mechanical Systems · FIVE BELOW-- MECHANICAL MODIFICATIONS AND INSTALLATIONS IN CONJUNCTION WITH RETAIL RENOVATION. No product keyword matched | 0 | Jun 25, 2026 |
| B | EPOS DEVELOPMENT NYC DOB building permits | 9 | Plumbing · PROPOSED APPLICATION FOR INTERIOR RENOVATION, LAYOUT CHANGE, FOR COMMUNITY CENTERS FOR SENIORS' ADULT DAYCARE ON EXIST. UNIT S1. S2. S3ON EXIST. 1ST FL. AND EXIST. UNIT CF1 ON EXIST. 2ND FL. IN AN EXIST. 5-STORY MIXED-USED BUILD. WITH NO CHANGE IN EGRESS No product keyword matched | 0 | Jun 25, 2026 |
| B | ROCKY'S REPAIRS AND RENO* NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF AN EXISTING APARTMENT IN A THREE-FAMILY BUILDING. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 25, 2026 |
| B | MS TOOR ENTERPRISE INC NYC DOB building permits | 9 | General Construction · Renovate existing mixed use building including kitchens, bathrooms and finishes. Provide 2 hr. ceiling at commercial space and rebuild fire damage roof bulkhead. No change of use, egress and dwelling units. Janitor closet in cellar. No product keyword matched | 0 | Jun 25, 2026 |
| B | ANDERSON & CAHILL, LLP NYC DOB building permits | 9 | Construction Fence · installation of construction fence No product keyword matched | 0 | Jun 25, 2026 |
| B | BLU BESI CONSTRUCTION.LLC NYC DOB building permits | 9 | Mechanical Systems · REMOVING EXISTING 8-TON AIR COOLE PACKAGED AIR HANDLER AND ALL ASSOCIATED CONTROLS AND POWER. PROVIDING NEW 6-TON VRF SPLIT UNIT WITH CONDENSER AT ROOF AND AIR HANDLER SECTION INLAUNDRY ROOM. NEW REFRIGERANT LINES FROM UNIT TO ROOFTOP CONDENSER. No product keyword matched | 0 | Jun 25, 2026 |
| B | MAR-RICH HOLDING CORP NYC DOB building permits | 9 | Plumbing · TO INSTALL NEW GAS EQUIPMENT IN THE EXISTING STORE AS PER PLANS FILED HEREWITH. NO WATER WORK. NO CHANGE TO USE, EGRESS, OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Jun 25, 2026 |
| B | LM Kent INC NYC DOB building permits | 9 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 25, 2026 |
| B | Zampolin & Associates NYC DOB building permits | 9 | General Construction · Removal and installation of interior non-bearing partitions and related finishes as per plans filed. No change in use, egress or occupancy under this application No product keyword matched | 0 | Jun 25, 2026 |
| B | TRUSTEES OF THE MASONIC HALL AND AS NYC DOB building permits | 9 | Structural · Remove existing communication stair between Level 17 & 18. Infill stair opening at Level 18 with concrete slab on metal deck and steel framing. No product keyword matched | 0 | Jun 25, 2026 |
| B | Cong Bet Baruch NYC DOB building permits | 9 | Mechanical Systems · REPLACMENT OF (1) 12.5 TON HVAC UNITS ON THE ROOF ON EXISTINGSTEEL DUNNAGE. NO CHANGE IN EGRESS, USE OR OCCUPANCY No product keyword matched | 0 | Jun 25, 2026 |
| B | Ritz Carlton NYC DOB building permits | 9 | Mechanical Systems · CONNECT TO EXISTING EXHAUST VENT AND AIR INTAKE VENT FOR TWO (2) REPLACEMENT GAS-FIRED DIRECT-VENT BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 25, 2026 |
| B | VISTAH GROUP INC NYC DOB building permits | 9 | General Construction · Proposed 2 Story and cellar, 2 family dwelling - NYC Development HUB consultation held and accepted No product keyword matched | 0 | Jun 25, 2026 |