Mechanical Systems · Installation of New VRV Systems made up of condensing units on the Roof piped to evaporators at each floor to provide Heating/Cooling throughout building. Exhaust is provided to BOH spaces, Cellar, trash closets. Electric Unit heaters provided throughout.
Mechanical Systems · Installation of New VRV Systems made up of condensing units on the Roof piped to evaporators at each floor to provide Heating/Cooling throughout building. Exhaust is provided to BOH spaces, Cellar, trash closets. Electric Unit heaters provided throughout.
No product keyword matched · NYC DOB building permits
Standpipe · New sprinkler protection to include Fire Pump, Riser, Floor control assemblies, drain risers. Replace exist. fire hose racks with new fire valve cabinets. Standpipe system modification removal of exist. fire hose & relocate exist. hose valves.
No product keyword matched · NYC DOB building permits
Plumbing · Replacement of existing plumb. fixtures with new on exist. roughing, addition of limited roughing for kitchens/bathrooms, removal of gas service, water heating installation of new water heating plant, installation of new water service & backflow devices.
No product keyword matched · NYC DOB building permits