Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | MADISON SQUARE GARDEN NYC DOB building permits | 9 | General Construction · TEMPORARY TENTS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | 8-10 GRAND AVENUE OWNER LLC NYC DOB building permits |
| 9 |
Sprinklers · Sprinkler & Standpipe modifications to take place on the first through third floor as per drawings filed herewith. No change in use, egress, or occupancy. No product keyword matched |
| 0 |
| Jun 29, 2026 |
| B | HKFIRM3, LLC NYC DOB building permits | 9 | General Construction · APT 4G LIVING ROOM-REMOVE ILLEGALLY ERECTED FULL HEIGHT PARTITION WALL WITH ENTRY DOOR TO CREATE ADDITIONAL BEDROOM.,AND RESTORE LIVING ROOM TO PRIOR LEGAL EXISTING CONDITION No product keyword matched | 0 | Jun 29, 2026 |
| B | LOGOS SERVICE3CORP NYC DOB building permits | 9 | General Construction · REPLACMENT OF FLOOR AND WALL TILE FINISH FOR TOILET ROOMS IN CELLAR No product keyword matched | 0 | Jun 29, 2026 |
| B | DOUGLASTON REALTY MANAGEMENT CORP NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | EVEREST REALTY HOLDINGS I NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF APARTMENT 15E ON THE 15TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | FONG CONSTRUCTION CORP NYC DOB building permits | 9 | General Construction · PARTIAL INTERIOR RENOVATION TO EXISTING 6TH FLOOR APARTMENT #620, TO INCLUDE REVISIONS TO EXISTING DINING ROOM CLOSET, BEDROOM 2 AND CLOSET. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jun 29, 2026 |
| B | Hong Cheam LLC NYC DOB building permits | 9 | Sprinklers · NEW PLUMBING SYSTEM (GAS, WATER, SANITARY, VENT) FOR NEW COMMERCIAL RESTUARANT AND SPRINKLER HEADS AT OPEN KITCHEN ONLY. No product keyword matched | 0 | Jun 29, 2026 |
| B | POINT PROPERTY HOLDINGS NYC DOB building permits | 9 | Structural · Tenant interior fit-out with new finishes throughout. Minor exterior modifications include new egress doors and new storefront with new entry/exit doors. No product keyword matched | 0 | Jun 29, 2026 |
| B | MOUNT SINAI HOSPITAL QUEENS NYC DOB building permits | 9 | Plumbing · Mount Sinai Medical Center - HVAC Modernization - PLUMBING MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | 154 E 62 LLC NYC DOB building permits | 9 | General Construction · Reframing of roof structure above master bathroom, integrating new skylight opening. Enlarge opening between master bedroom and terrace. No change in use, occupancy, or egress. No product keyword matched | 0 | Jun 29, 2026 |
| B | A K AND SONS PLUMBING COR NYC DOB building permits | 9 | Plumbing · Plumbing work at cellar . also rectify violation #34900908P related to first floor kitchen plumbing. No product keyword matched | 0 | Jun 29, 2026 |
| B | KG delicatessen NYC DOB building permits | 9 | Mechanical Systems · INTERIOR RENVATION OF THE GROUND FLOOR TAKE OUT FOOD STORE WITH EXISTING COMMERICAL KITCHEN HOOD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | BR52 LLC NYC DOB building permits | 9 | Protection and Mechanical Methods · USE OF CONSTRUCTION EQUIPMENT IN CONJUNCTION WITH ALTERATION 1 WORK, FILED SEPARATELY UNDER 123358892. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 29, 2026 |
| B | 57 WELLNESS INC NYC DOB building permits | 9 | Plumbing · PROPOSED PLUMBING WORK IN A NEW SPA ON THE FIRST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jun 29, 2026 |
| B | 3071 ave u realty llc NYC DOB building permits | 9 | Full Demolition · Legalize full demolition of a garage. No product keyword matched | 0 | Jun 29, 2026 |
| B | Ewanchin International Inc. NYC DOB building permits | 9 | General Construction · Proposed interior renovation to the first floor and cellar only of an existing two-story and attic to a two-family dwelling. No product keyword matched | 0 | Jun 29, 2026 |
| B | TRINITY PLACE HOLDINGS INC NYC DOB building permits | 9 | Protection and Mechanical Methods · INSTALLATION AND USE OF BUILDING MAINTENANCE UNIT (BMU). BMU EQUIPMENT SHALL REMAIN ON BUILDING POST APPLICATION SIGN OFF WHILE REMAINING UNDER DEPARTMENT OF LABOR'S JURISDICTION CONTINGENT ON APPROVAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | GRAD INDUSTRIAL WORKS INC NYC DOB building permits | 9 | General Construction · Modification to non load bearing partitions. new finishes. new built-in cabinetry. No product keyword matched | 0 | Jun 29, 2026 |
| B | 1 Halal Spot NYC DOB building permits | 9 | Mechanical Systems · FILING TO INSTALL KITCHEN HOOD AND DUCTWORK AS PER PLANS FOR THE HALAL SPOT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | ABRAHAMS BUILDERS CORP NYC DOB building permits | 9 | General Construction · GENERAL CONSTRUCTION WORK FOR INTERIOR PARTITION WORK TO COMBINE APARTMENTS AT THE 3RD FLOOR AS PER TPPN #3/97. NO CHANGE TO EGRESS, USE OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | RIDGEWOOD ASSOCIATES INC NYC DOB building permits | 9 | Suspended Scaffold · OUTRIGGER SUSPENDED SCAFOLDING USED DURING FACADE REPAIR WORK UNDER JOB APPLICAITON NUMBER #Q00942386 No product keyword matched | 0 | Jun 29, 2026 |
| B | 155 w 122nd ST Brownstone Condo Ass NYC DOB building permits | 9 | Structural · Proposed new attached metal deck at 1st floor rear of property. Structural piers (and stairs land) at basement level. No product keyword matched | 0 | Jun 29, 2026 |
| B | WM NYC DOB building permits | 9 | General Construction · 1. REPLACE SHEET ROCK IN THE ALL WALLS AND CEILING IN THE APT. 4D, 4TH FLOOR.2. REPLACE FLOOR TILES THROUGHOUT THE APT. 4D, 4TH FLOOR.3. REPLACE EXISTING WINDOW IN KIND AS PER PLAN IN THE APT. 4D, 4TH FLOOR=4 NOS. No product keyword matched | 0 | Jun 29, 2026 |
| B | Georgann Gilbert NYC DOB building permits | 9 | General Construction · LEGALIZE THE REPLACEMENT OF THE ROOF RAFTERS, SHINGLES AND 1/2 WOOD SHEATHING FOR EXISTING GARAGE. No product keyword matched | 0 | Jun 29, 2026 |
| B | N&Z GROCERY INC NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - N&Z MINI MART. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | Juan D Rodriguez NYC DOB building permits | 9 | General Construction · LEGALIZE EXISTING TERRACE AND CELLAR ENTRANCE No product keyword matched | 0 | Jun 29, 2026 |
| B | IDEAL FLOW MECHANICAL CO* NYC DOB building permits | 9 | Mechanical Systems · REPLACMENT OF SPLIT SYSTEM ON THE GROUND FLOOR AND OUTSIDE SPACE WITH A TOTAL CAPACITY OF 4 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Jun 29, 2026 |
| B | Nepita NYC DOB building permits | 9 | Sign · PROPOSED INSTALLATION OF 1 NON-ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING NEPITA No product keyword matched | 0 | Jun 29, 2026 |
| B | J M BEER COUNTER LLC NYC DOB building permits | 9 | Plumbing · Installation of new plumbing fixtures to accommodate new bar and kitchen equipment. No product keyword matched | 0 | Jun 29, 2026 |
| B | ALADDIN SWEETS NYC DOB building permits | 9 | Plumbing · RELOCATION OF GAS RACK OVEN No product keyword matched | 0 | Jun 29, 2026 |
| B | 711 east 215 llc NYC DOB building permits | 9 | Structural · STRUCTURAL APPLICATION FILED IN CONJUNCTION WITH APPROVED DOB NOW JOB NUMBER X01023872-I1 No product keyword matched | 0 | Jun 29, 2026 |
| B | ALLSORTS INC NYC DOB building permits | 9 | Plumbing · INTERIOR WORK IN EXISTING EATING AND DRINKING ESTABLISHMENT (USEGROUP 6). INSTALL NEW ADA BATHROOM ON 1ST FLOOR. No product keyword matched | 0 | Jun 29, 2026 |
| B | SICULA ALKEIS CONSTRUCT NYC DOB building permits | 9 | General Construction · GENERAL CONSTRUCTION TO RENOVATE APT 11D ON THE 11TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING. No product keyword matched | 0 | Jun 29, 2026 |
| B | RICO CHIMI BROOKLYN INC. NYC DOB building permits | 9 | Plumbing · DIRECT REPLACEMENT OF (2) SHOWER, (4) TOILET, (4) LAVATORY, (1) BATHTUB (1) KITCHEN SINK, (1) DISHWASHER, (1) GAS RANGE, (1) HWH (1) BOILER, AND INSTALLING (1) NEW DRYER IN CELLAR AS PER PLANS NO CHANGE USE AGREES OR OCCUPANCY No product keyword matched | 0 | Jun 29, 2026 |
| B | COUNTRYWIDE GENERAL CONST NYC DOB building permits | 9 | General Construction · REPAIR AND RECONSTRUCTION OF LOW RETAINING WALL (24 HIGH), FRONT YARD PAVEMENT REPLACEMENT, REPOINTING OF BRICK STAIRS, PORCH SLAB REPAIR, AND RECONSTRUCTION OF DAMAGED BRICK PIER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Jun 29, 2026 |
| B | NH COLLECTION NEW YORK MADISON AVEN NYC DOB building permits | 9 | General Construction · Faade Inspection Safety Program (FISP) Cycle 9 Repairs No product keyword matched | 0 | Jun 29, 2026 |
| B | OVADIA BROS NYC DOB building permits | 9 | General Construction · Interior non-structural demolition proposed at floors 1 thru 3. No change to use, egress or occupancy. No product keyword matched | 0 | Jun 29, 2026 |
| B | AN-K ELECTRIC LLC NYC DOB electrical permits | 9 | General wiring No product keyword matched | 0 | Jun 28, 2026 |
| B | Coloss Solutions NYC DOB electrical permits | 9 | test No product keyword matched | 0 | Jun 27, 2026 |
| B | ABC PROVATE ASSOC NYC DOB electrical permits | 9 | oo No product keyword matched | 0 | Jun 27, 2026 |
| B | El Special Business NYC DOB electrical permits | 9 | Test02 No product keyword matched | 0 | Jun 27, 2026 |
| B | PARK SOUTH TENANTS CORP. NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/ repair. No product keyword matched | 0 | Jun 26, 2026 |
| B | HML Developments NYC DOB building permits | 9 | Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH ALT-CO JOB# B01245808-I1 No product keyword matched | 0 | Jun 26, 2026 |
| B | EG ENTERPRISES NY INC NYC DOB building permits | 9 | Construction Fence · APPLICATION IS FILED FOR THE INSTALLATION OF 8'-0' HIGH TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH FUTURE NEW BUILDING. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILLED UNDER THIS APPLICATION No product keyword matched | 0 | Jun 26, 2026 |
| B | BUILD 360 NYC DOB building permits | 9 | Plumbing · PLUMBING FILED FOR 122 3RD PLACE. PLUMBING WORK AS PER PLANS. No product keyword matched | 0 | Jun 26, 2026 |
| B | HFZ CAPITAL GROUP NYC DOB building permits | 9 | Construction Fence · CONSTRUCTION FENCE No product keyword matched | 0 | Jun 26, 2026 |
| B | AA CAPRI CONSTRUCTION NYC DOB building permits | 9 | General Construction · Demolition of non load-bearing interior partitions, construction of new partitions, removal and replacement of exterior door and exterior railing. No product keyword matched | 0 | Jun 26, 2026 |
| B | EMERALD BUILDERS GROUPLLC NYC DOB building permits | 9 | Supported Scaffold · Proposed pump jack scaffold as per plans. No change to egress or occupancy under this application. all work to comply with applicable chapters of nycbc No product keyword matched | 0 | Jun 26, 2026 |
| B | OGRIN ASSOCIATESLLC NYC DOB building permits | 9 | Boiler Equipment · REPLACE BOILER AND OIL BURNER. No product keyword matched | 0 | Jun 26, 2026 |