General Construction · Reframing of roof structure above master bathroom, integrating new skylight opening. Enlarge opening between master bedroom and terrace. No change in use, occupancy, or egress.
General Construction · Reframing of roof structure above master bathroom, integrating new skylight opening. Enlarge opening between master bedroom and terrace. No change in use, occupancy, or egress.
No product keyword matched · NYC DOB building permits
General Construction · Reframing of roof structure above master bathroom, integrating new skylight opening. Enlarge opening between master bedroom and terrace. No change in use, occupancy, or egress.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · Installation of a temporary Engineered Enclosure System per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched · NYC DOB building permits
Supported Scaffold · Installation of a temporarily supported scaffold and Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
No product keyword matched · NYC DOB building permits