Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | B.A.C.C BUILDERS INC NYC DOB building permits | 9 | General Construction · Alteration to existing 1 bedroom apartment to include new washer and dryer. No other work is proposed. No product keyword matched | 0 | Jul 6, 2026 |
| B | IMIAN PARTNERS LLC NYC DOB building permits |
| 9 |
General Construction · INTERIOR RENOVATION OF EXISTING DUPLEX PENTHOUSE #PH46C, NEW FINISH FLOORS/WALLS/CEILING AND AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched |
| 0 |
| Jul 6, 2026 |
| B | TERRANOVA CONTRACTING COR NYC DOB building permits | 9 | General Construction · NEW DECK AND STAIRS AT REAR YARD. NEW DOOR AT FORMER WINDOW OPENING. RE-OPEN FORMER WINDOW OPENING AND INSTALL NEW WINDOW. No product keyword matched | 0 | Jul 6, 2026 |
| B | VANGUARD CONSTRUCTION AND NYC DOB building permits | 9 | Structural · STRUCTURAL MODIFICATIONS TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | FETTMAN DESIGN LLC NYC DOB building permits | 9 | Full Demolition · Full demolition of the existing garage. No product keyword matched | 0 | Jul 6, 2026 |
| B | AA BUILDING& INSPECTION NYC DOB building permits | 9 | General Construction · REMOVE ILLEGAL EXTENSION TO EX REAR SHED OF PREMISES APPROXIMATELY25'-0X20'.0X8'-6 HIGH OF CMU BLOCK (6),TIMBER CORRNGATED SHEETS AND PARTIAL CONCRETE ROOF. CORRECT ECB VIOLATION# 34076216L. No product keyword matched | 0 | Jul 6, 2026 |
| B | I G H RESTORATION LLC NYC DOB building permits | 9 | General Construction · EXTERIOR RESTORATION PROJECT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | IGH RESTORATION LLC NYC DOB building permits | 9 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 0 | Jul 6, 2026 |
| B | 1986 NYC DOB building permits | 9 | General Construction · REPAIR OR REPLACEMENT OF STUCCO; DECORATIVE STONE; MORTAR JOINTS ON THE FACADES AS PER INDICATED ON PLAN.THERE WILL BE NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Jul 6, 2026 |
| B | JACK FOX CONSTRUCTION CO NYC DOB building permits | 9 | General Construction · HORIZONTAL ENLARGEMENT ON THE BASEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | GRAND CONSTRUCTION & DEV* NYC DOB building permits | 9 | General Construction · NEW BUILDING- 6 STORY MIXED USE BUILDING No product keyword matched | 0 | Jul 6, 2026 |
| B | RISE CONSTRUCTION SOLUTIO NYC DOB building permits | 9 | General Construction · GENERAL CONSTRUCTION TO INCLUDE THE ADDITION OF 121 SQUARE FEET TO THE 1ST FLOOR IN THE FORM OF A HORIZONTAL ENLARGEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | HTI VISIONS LLC NYC DOB building permits | 9 | General Construction · FILING FOR MINOR COSMETIC WORK INSIDE EXISTING COMMERCIAL SPACE TO PROPOSE A COFFEE SHOP. WORK WILL INCLUDE INSTALLATION OF COUNTER-TOPS AND INTERIOR FINISHES THROUGHOUT THE SPACE. No product keyword matched | 0 | Jul 6, 2026 |
| B | 149 PP LLC NYC DOB building permits | 9 | General Construction · renovation of residential building including apartments combination on floors 2nd and 3rd floors, relocaiton of egress stair on the 4th floor, exterior work includes facade work and opening modification at the cel ar. no change to use, egress, or occupanc No product keyword matched | 0 | Jul 6, 2026 |
| B | LEONID BELILOVSKY NYC DOB building permits | 9 | General Construction · BUILD EXTENTION No product keyword matched | 0 | Jul 6, 2026 |
| B | ALL TECH MECHANICAL INC NYC DOB building permits | 9 | General Construction · MECHANICAL & GENERAL CONSTRUCTION WORK TO INSTALL NEW EXTERIOR HEAT PUMP AT REAR COURT AND ASSOCIATED INTERIOR CEILING CONCEALED DUCTED UNITS IN APARTMENT 2E ON 2ND FLOOR. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY No product keyword matched | 0 | Jul 6, 2026 |
| B | MAX NEW YORK MANAGEMENT INC NYC DOB building permits | 9 | General Construction · RENOVATION OF EXISTING APARTMENT ON 2ND & 3RD FLOOR OF AN EXISTING 3-STORY BUILDING. REPLACE EXISTING FLOOR TILES, LIGHTING FIXTUERS, & WALL FINISHES, AS NEEDED. REMOVE & INSTALL INTERIOR NON-LOAD BEARING PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY No product keyword matched | 0 | Jul 6, 2026 |
| B | HUGHES ENVIRONMENTAL ENGI NYC DOB building permits | 9 | Mechanical Systems · Replacing HVAC unit on roof with new as per plans filed herewith. No product keyword matched | 0 | Jul 6, 2026 |
| B | 144-19TH STREET JACKSON HEIGHTS, IN NYC DOB building permits | 9 | Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. No product keyword matched | 0 | Jul 6, 2026 |
| B | TRUEBLUE CONSTRUCTION LLC NYC DOB building permits | 9 | Foundation · The installation of new concrete pier and spread footings to support proposed lateral frame, and patch existing concrete slab-on-grade after installation of the foundation. No change in use, egress or occupancy. No product keyword matched | 0 | Jul 6, 2026 |
| B | Symphony Towers Infrastructure, LLC NYC DOB building permits | 9 | Antenna · Modification to existing Verizon site. REMOVE 1 CABINET, 1 ANTENNA, AND 2 RRH's, REPLACE 2 ANTENNAS AND 2 RRH's, AND INSTALL 6 ANTENNAS, 4 RRH's, 3 MDB's, AND PLATFORM WITH 3 CABINETS ON ROOF.. No product keyword matched | 0 | Jul 6, 2026 |
| B | Coxon NYC DOB building permits | 9 | General Construction · Proposed Renovation of the Basement Level of an Existing 2-Family Building. No Change in Use, Egress or Occupancy is proposed under this application No product keyword matched | 0 | Jul 6, 2026 |
| B | Buffoon Group LP NYC DOB building permits | 9 | Plumbing · PROPOSED PLUMBING WORK FOR AN EXIST. 3-STORY 3-FAMILY BUILDING. NO CHANGE TO EXIST. USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | V.S. BUILDERS LLC NYC DOB building permits | 9 | Mechanical Systems · subsequent document for mechanical system No product keyword matched | 0 | Jul 6, 2026 |
| B | KURT NYC DOB building permits | 9 | Plumbing · PLUMBING WORK AS PER PLANS FILED HEREWITH. No product keyword matched | 0 | Jul 6, 2026 |
| B | EMDAD CONSTRUCTION INC NYC DOB building permits | 9 | Structural · RENOVATION OF AN EXISTING TWO-FAMILY BUILDING. INTERIOR WORK TO INCLUDE, NEW NON LOAD-BEARING PARTITIONS, FINISHES, AND FITTINGS. EXTERIOR WORK TO INCLUDE WINDOW AND SKYLIGHT REPLACEMENT ON ROOF IN EXISTING LOCATIONS. NO CHANGE TO USE,EGRESS, OR OCCUPANCY No product keyword matched | 0 | Jul 6, 2026 |
| B | FORTUNA CONSTRUCTION LLC NYC DOB building permits | 9 | General Construction · INSTALL A NEW CHAIN LINK MESH FENCE ON VACANT LOT. NO CHANGE IN USE OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 6, 2026 |
| B | ELYSEE MANAGEMENT LLC NYC DOB building permits | 9 | Structural · Repair and reinforce vault slab at first floor, repair and reinforce beams and columns at cellar as the plan shown. There is no change occupancy, use or egress. No product keyword matched | 0 | Jul 6, 2026 |
| B | Jastkur Management Inc NYC DOB building permits | 9 | Plumbing · PLUMBING WORK FOR UNITS #1L,1R,2L,2R FROM CELLAR TO 2ND FLOOR.NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | Y R A DEVELOPMENT CORP NYC DOB building permits | 9 | Plumbing · HEREWITH TO PROPOSE PLUMBING SYSTEM AS PERPLANS. IN CONJUNCTION WITH DOB B01392181-I1 AND TO ADDRESS ECB# 39133150H,39133149K, 39133149K, 39120514R, 32088490J, 32070372N, 32070371L No product keyword matched | 0 | Jul 6, 2026 |
| B | El Mango Rico inc NYC DOB building permits | 9 | Sign · ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | LC EXPEDITING SRVCS CORP NYC DOB building permits | 9 | Full Demolition · This job is filed for full demotion work at 69-23 caldwell Ave, Queens, NY 11378 No product keyword matched | 0 | Jul 6, 2026 |
| B | LINKED MECHANICAL LLC NYC DOB building permits | 9 | Mechanical Systems · INSTALLMENT OF TWO YORK CHILLERS IN SUB-CELLAR 1, SUB-CELLAR 2 AND TWO SPLIT DAIKIN UNITS ON MAIN ROOF, NO CHANGE IN EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | Martha's Bakery NYC DOB building permits | 9 | Plumbing · HEREWITH FILED FOR MINOR PLUMBING WORK IN EXISTING STORE. TO INCLUDE REPLACEMENT OF FIXTURES IN SALES AREA AND BATHROOMS ON EXT'G ROUGHING IN EXT'G LOCATIONS. No product keyword matched | 0 | Jul 6, 2026 |
| B | Tana United LLC NYC DOB building permits | 9 | Structural · INTERIOR STRUCTURAL WORK ON 3RD AND 4TH FLOORS AS INDICATED ON PLANS FILED HEREWITH FOR APARTMENT COMBINATION No product keyword matched | 0 | Jul 6, 2026 |
| B | ALBERT MAZZARISI NYC DOB building permits | 9 | Mechanical Systems · PROVIDE AND INSTALL HEATING, COOLING AND VENTILATION SYSTEM NEW ADDITINAL ROOMS IN SINGLE FAMILY HOUSE PER SUBMITTED PLANS No product keyword matched | 0 | Jul 6, 2026 |
| B | 234 HILLSIDE ACQUISITIONS LLC NYC DOB building permits | 9 | Mechanical Systems · Replace 2 old HVAC units with new ones on roof. No product keyword matched | 0 | Jul 6, 2026 |
| B | AXOS RENOVATIONS CORP NYC DOB building permits | 9 | Mechanical Systems · Convert existing 2-story and Cellar, 2-family house to One (1)-Family house. New layout as per accompanying plans. No product keyword matched | 0 | Jul 6, 2026 |
| B | 377 Broadway Condominium NYC DOB building permits | 9 | Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR EXTERIOR FACADE RESTORATION WORK AND INSPECTION AT 377 BROADWAY, MANHATTAN, NY 10013 No product keyword matched | 0 | Jul 6, 2026 |
| B | BLDG INCORPORATED NYC DOB building permits | 9 | General Construction · ALTERATION (TYPE 2) OF AN EXISTING SINGLE FAMILY TOWNHOUSE. WORK TO INCLUDE 3RD FLOOR BATHROOM, INTERIOR PARTITION WORK, PLUMBING, AND ELECTRICAL. ROOF PAVER, CABINETRY, PLUMBING, GAS, AND ELECTRICAL. No product keyword matched | 0 | Jul 6, 2026 |
| B | Our Lady of Pompeii Church NYC DOB building permits | 9 | General Construction · Repairs to existing entry granite steps per plans submitted. No change in use, occupancy or egress proposed under this application. No product keyword matched | 0 | Jul 6, 2026 |
| B | ZHONGSHUN JIANZHU INC NYC DOB building permits | 9 | General Construction · HEREWITH FILE TO RESTORE THE FIRE DAMAGED RETAIL STORE INCLUDES THE REPLACEMENT OF FIRE-DAMAGED BEARING WALLS AND ROOFING, FLOORING REPAIRS, NEW PAINT, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | ASTRAL PROPERTIES NYC DOB building permits | 9 | General Construction · ROOF REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE, TO USE EGREE OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | Donnelly Building LLC NYC DOB building permits | 9 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY ELECTRONIC MESSAGE CENTER FOR DONNELLY MECHANICAL - IN PROPERTY LINES. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | Hold Up Roll Up Brooklyn NYC DOB building permits | 9 | Sign · INSTALL EXTERIOR ILLUMINATED WALL SIGN (HOLD UP ROLL UP) No product keyword matched | 0 | Jul 6, 2026 |
| B | DENI INTERNATIONAL INC NYC DOB building permits | 9 | General Construction · GENERAL INTERIOR RENOVATIONS OF AN APARTMENT 2W. MINOR PARTITION REMOVAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | SAUMIER HOLDING NYC DOB building permits | 9 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Jul 6, 2026 |
| B | 33RD AND BROADWAY LLC NYC DOB building permits | 9 | Plumbing · NEW GAS SERVICE AND GAS METER TO BE INSTALLED AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 0 | Jul 6, 2026 |
| B | 250 PARK AVENUE, LLC NYC DOB building permits | 9 | Sprinklers · Modifications to the existing Sprinkler System: Relocate (12) existing sprinkler heads and piping and install (1) new head and associated piping on the 8th Floor as per plans (Kirby McInerney - Suite #820.) No change to use, egress or occupancy. No product keyword matched | 0 | Jul 6, 2026 |
| B | 209 MONTROSE LJ LLC NYC DOB building permits | 9 | General Construction · Proposed interior renovation to an existing three (3) story + cellar residential use building. No product keyword matched | 0 | Jul 6, 2026 |