Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CEPHEUS.CONSTRUCTION NYC DOB building permits | 9 | Structural · Miscellaneous facade repairs. Work to include removal & reconstruction of the second floor front wall, masonry repairs, new parapet & lintels. No change in use, egress, nor occupancy. No product keyword matched | 0 | Aug 5, 2026 |
| B | African restaurant Le Dakar llc |
| 9 |
Plumbing · Install bathrooms, sink and gas to proposed commercial kitchen. No product keyword matched |
| 0 |
| Aug 5, 2026 |
| B | MANHATTAN MODERN MANAGEMENT NYC DOB building permits | 9 | Mechanical Systems · INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Aug 5, 2026 |
| B | UNIVERSAL BUILDERS SUPPLY LLC NYC DOB building permits | 9 | Protection and Mechanical Methods · FDNY High Pile Storage & Fuel Storage No product keyword matched | 0 | Aug 5, 2026 |
| B | RAJ MARAJH REALTY LLC NYC DOB building permits | 9 | Solar · INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS. No product keyword matched | 0 | Aug 5, 2026 |
| B | CARE PLASMA LLC NYC DOB building permits | 9 | Sprinklers · SPRINKLER WORK AS PER PLANS FILED HEREWITH No product keyword matched | 0 | Aug 5, 2026 |
| B | 5 WEST 87 NYC DOB building permits | 9 | General Construction · Architectural General Construction to Facilitate Fire Sprinkler System Upgrade. No change to use, occupancy, or egress. No product keyword matched | 0 | Aug 5, 2026 |
| B | Kenbar Management LLC NYC DOB building permits | 9 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 0 | Aug 5, 2026 |
| B | Liar Liar NYC DOB building permits | 9 | Sign · INSTALLATION OF AWNINGS FOR RESTAURANT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 0 | Aug 5, 2026 |
| B | 38TH AVENUE FLUSHING LLC NYC DOB building permits | 9 | Construction Fence · Install temporary construction fence during construction activites as per plans filed. Filed in conjunction with proposed new building. No product keyword matched | 0 | Aug 5, 2026 |
| B | BRADFORD SWETT MANAGEMENT LLC NYC DOB building permits | 9 | Mechanical Systems · Radon Mitigation System and associated piping and exhaust fan. No change in use or egress. No product keyword matched | 0 | Aug 5, 2026 |
| B | RICHPORT ASSOCIATES NYC DOB building permits | 9 | General Construction · Facade restoration work to include replacement of windows, restoration of decorative lintels and miscellaneous repairs to stonework as per plans submitted herewith. No change in use egress or occupancy. No product keyword matched | 0 | Aug 5, 2026 |
| B | 375 PLEASANT GROUP LLC NYC DOB building permits | 9 | General Construction · PROPOSED FACADE REPAIR AS PER PLAN. NO CHANGE TO EGRESS,OCCUPANCY OR USE. No product keyword matched | 0 | Aug 5, 2026 |
| B | BINDER ELT'L SERVICE CORP NYC DOB electrical permits | 9 | To Supersede Application # X00052730 S1 No work is being done . Building was gut renovated and we want to close out old app. No product keyword matched | 0 | Aug 5, 2026 |
| B | CSL ELECTRIC LLC NYC DOB electrical permits | 9 | Replacing devices and re-connect equipment No product keyword matched | 0 | Aug 5, 2026 |
| B | ERIN ELEC'L CONTR'G INCOR NYC DOB electrical permits | 9 | Elevator Modernization No product keyword matched | 0 | Aug 5, 2026 |
| B | GATSONS ELECTRIC INC NYC DOB electrical permits | 9 | general wiring for dental office renovation,located on 2nd and fourth floor as follows: 2nd floor 95 receptacles,85 lighting fixtures controlled by 29 sensors. replaced a 200amp main breaker panelboard and a 100 amp sub panel. 4th floor 105 receptacles, 95 fixtures and 31 sensors. PERMIT TO BE SUPERSEDED: JOB# X01419978. No product keyword matched | 0 | Aug 5, 2026 |
| B | WINDSOR ELEC CONT'G INC. NYC DOB electrical permits | 9 | ABANDONED Application # A290280 No product keyword matched | 0 | Aug 5, 2026 |
| B | 400 EAST 84TH STREET ASSOCIATES, L. NYC DOB building permits | 9 | Plumbing · PLUMBING GAS WORK FOR THE RENOVATION TO EXISTING UNITS 28C, 29C, 30C, 31C, 32C, 33C, 34C, 35C, 36C, 37C, 38C, 39C AND 17C AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 4, 2026 |
| B | 2538 35 STREET LLC NYC DOB building permits | 9 | General Construction · VERTICAL ENLARGEMENT AND FILL IN NE CORNER OF EXISTING 2-STORY BUILDING TO 4-STORY W/ CELLAR, PENTHOUSE AND BULKHEAD BUILDING. CONVERT EXISTING 2-FAMILY TO 7 DWELLING UNITS. INTERIOR RENOVATION WITH PARTITIONS. OBTAIN NEW C.O. No product keyword matched | 0 | Aug 4, 2026 |
| B | 205TH STREET LLC NYC DOB building permits | 9 | Plumbing · partial plumbing work,new building sewer as per DEP approved site connection. DOB inspection sewer steel sleeve through foundation wall. No product keyword matched | 0 | Aug 4, 2026 |
| B | SEA BRIGHT SOLAR LLC NYC DOB building permits | 9 | Solar · INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK No product keyword matched | 0 | Aug 4, 2026 |
| B | BONEI BUILDERS LLC NYC DOB building permits | 9 | Structural · STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #X01221313-I1 No product keyword matched | 0 | Aug 4, 2026 |
| B | VAYA RESTORATION INC NYC DOB building permits | 9 | Suspended Scaffold · INSTALLATION OF 2 PT SUSPENDED SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Aug 4, 2026 |
| B | HS CONTRACTING NYC SV LLC NYC DOB building permits | 9 | General Construction · Roof fence installation No product keyword matched | 0 | Aug 4, 2026 |
| B | GREATER NEW YORK CORPORATION OF SEV NYC DOB building permits | 9 | Plumbing · INSTALL GAS PIPING, KITCHEN FIRE SUPPRESSION GAS VALVE AND GAS STOVE ON FIRST FLOOR. REMOVE EXISTING GAS BOILER AND GAS HOT WATER HEATER IN CELLAR. INSTALL NEW ELECTRIC WATER HEATER No product keyword matched | 0 | Aug 4, 2026 |
| B | FATU, INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION No product keyword matched | 0 | Aug 4, 2026 |
| B | RACQUET AND TENNIS CLUB NYC DOB building permits | 9 | Structural · Install new steel beams and concrete slabs to support new plunge pools at the 3rd floor and new steel beams to support ADA lift at 4th floor framing. No product keyword matched | 0 | Aug 4, 2026 |
| B | DAIWA HOUSE TEXAS INC. NYC DOB building permits | 9 | General Construction · INSTALLATION OF GLASS PARTITION ON APT. 13C (14C MARKETING) TERRACE AS PER THE PLANS FILED HEREWITH. NO CHANGE TO BULK, USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 4, 2026 |
| B | UP CONSTR SOLUTIONS INC NYC DOB building permits | 9 | General Construction · RENOVATIONS TO INCLUDE REMOVAL AND CONSTRUCTION OF INTERIOR PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 4, 2026 |
| B | SMITH STREET REALTY LLC NYC DOB building permits | 9 | Sign · INSTALL AN ACCESSSORY BUSINESS ILLUMINATED D/F BLADE SIGN C1 - WHOLE FOODS MARKET @SMITH STREET ELEVATION No product keyword matched | 0 | Aug 4, 2026 |
| B | Glenmore 485 LLC NYC DOB building permits | 9 | Plumbing · INSTALLATION OF PLUMBING FIXTURES AND ASSOCIATED PIPING FOR NEW 4-STORY, 14 UNIT RESIDENTIAL BUILDING. FILED IN CONJUCTION WITH DOB NOW # B01225438-I1. No product keyword matched | 0 | Aug 4, 2026 |
| B | GUARINA CORONA CORP. NYC DOB building permits | 9 | Plumbing · PROPOSED PLUMBING WORK ON 2ND FLOOR RESIDENTIAL UNIT OF AN EXIST 2 STORY MIXED USEBUILDING. NO CHANGE IN USE, EGRESS AND OCCUPANCY No product keyword matched | 0 | Aug 4, 2026 |
| B | Fultonex Management NYC DOB building permits | 9 | General Construction · INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE F12 ON 1ST FLOOR IN EXISTING BUILDING. NO CHANGE TO OCCUPANCY, GROUP AND USE. No product keyword matched | 0 | Aug 4, 2026 |
| B | WAI KEE CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · Minor interior renovation of two family dwelling including removal and installation of minor partitions. No change to use, egress or occupancy. No product keyword matched | 0 | Aug 4, 2026 |
| B | NOVA CONSTRUCTION SERVICES, LLC NYC DOB building permits | 9 | Construction Fence · Install construction fence No product keyword matched | 0 | Aug 4, 2026 |
| B | FLINTLOCK CONSTR SERV LLC NYC DOB building permits | 9 | General Construction · Removal of interior partitions, ceilings and doors for the 3rd thru 17th floor of the hotel as shown on plans. No product keyword matched | 0 | Aug 4, 2026 |
| B | Bruman NYC DOB building permits | 9 | General Construction · Proposed four (4) story + cellar and penthouse residential use building. No product keyword matched | 0 | Aug 4, 2026 |
| B | DV CONTRACTING INC NYC DOB building permits | 9 | General Construction · Interior renovation of apartment #4C as per plans. No change in use, egress, or occupancy. No product keyword matched | 0 | Aug 4, 2026 |
| B | Sedgewick Ave NY 2 LLC NYC DOB building permits | 9 | Mechanical Systems · Mechanical plans, specifications, details and risers herewith filed for mechanical scope of work in conjunction with New Building Application number X01282233-I1. No product keyword matched | 0 | Aug 4, 2026 |
| B | R.C. STRUCTURES INC NYC DOB building permits | 9 | Protection and Mechanical Methods · INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 4, 2026 |
| B | BI BI DEVELOPMENT GROUP I NYC DOB building permits | 9 | General Construction · Filing for interior renovation as per plans No product keyword matched | 0 | Aug 4, 2026 |
| B | CONGREGATION OF THE DAUGHTERS OF DI NYC DOB building permits | 9 | Mechanical Systems · MECHANICAL FILING FOR ELEMENTARY SCHOOL BUILDING :INSTALLATION OF SPLIT SYSTEM UNITS AT EXISTING INTERIOR CLASSROOMS ON 1ST, 2ND AND 3RD FLOOR. CONDENSING UNITS AT FRONT ROOF OF BUILDING. No product keyword matched | 0 | Aug 4, 2026 |
| B | NONSTOP WORK LLC NYC DOB building permits | 9 | Full Demolition · Full Demolition Of A Two Story Building No product keyword matched | 0 | Aug 4, 2026 |
| B | Devaloy NY Inc NYC DOB building permits | 9 | Earth Work · HEREWITH FILING FO/EA PLANS OF PROP. 2 STORY NEW BLDG. THE PROP FOUNDATION IS A CONTINUOUS CONCRETE FOOTING FOR WALLS AND MAT SLAB FOR ELEVATOR. THIS JOB IS FILED IN CONJUNCTION WITH DOB JOB # Q00812909-I1 No product keyword matched | 0 | Aug 4, 2026 |
| B | YASMEH REALTY LLC NYC DOB building permits | 9 | Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns. No product keyword matched | 0 | Aug 4, 2026 |
| B | SIBA MGT. INC. NYC DOB building permits | 9 | Plumbing · To file PL plumbing work type in conjunction with DOB Now Build job#M01029924. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Aug 4, 2026 |
| B | 162 STREET DEVELOPMENT LLC NYC DOB building permits | 9 | Mechanical Systems · PROPOSE A THREE STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O. No product keyword matched | 0 | Aug 4, 2026 |
| B | NOVO64 CONDOMINIUM NYC DOB building permits | 9 | General Construction · DIVIDING ONE (1) DWELLING UNIT INTO TWO (2) DWELLING UNITS. NO CHANGE TO USE OR BULK. No product keyword matched | 0 | Aug 4, 2026 |
| B | BAISLY REALTY CORP. NYC DOB building permits | 9 | General Construction · NON-ILLUMINATED NON-ADVERTISING ACCESSORY STOREFRONT AWNING - DUNKIN. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 4, 2026 |