Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/Devaloy NY Inc
Back to prospects

Devaloy NY Inc

Queens, QUEENS, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 9 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness3 / 5Latest signal is within 180 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
Devaloy NY Inc
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Aug 4, 2026
Source for Signal date (opens in new tab)
Signal count
5 saved signals, 0 in the last 90 days
Signal summary
Earth Work · HEREWITH FILING FO/EA PLANS OF PROP. 2 STORY NEW BLDG. THE PROP FOUNDATION IS A CONTINUOUS CONCRETE FOOTING FOR WALLS AND MAT SLAB FOR ELEVATOR. THIS JOB IS FILED IN CONJUNCTION WITH DOB JOB # Q00812909-I1
Source for Signal summary (opens in new tab)
Address
963 FOREST HILL ROAD
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

5 signals
  • Aug 4, 2026
    Permit
    Earth Work · HEREWITH FILING FO/EA PLANS OF PROP. 2 STORY NEW BLDG. THE PROP FOUNDATION IS A CONTINUOUS CONCRETE FOOTING FOR WALLS AND MAT SLAB FOR ELEVATOR. THIS JOB IS FILED IN CONJUNCTION WITH DOB JOB # Q00812909-I1
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 3, 2026
    Permit
    General Construction · HEREWITH TO PROPOSE NEW 2 STORY HOUSE OF WORSHIP.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 14, 2026
    Permit
    Structural · HEREWITH FILING STRUCTURAL PLANS OF 2-STOREY NEW BUILDING. THE PROPOSED WORK INCLUDES CONCRETE METAL DECK SLAB OVER STEEL FRAMING BEARING ON CMU WALLS WITH CMU AS LATERAL RESISTING SYSTEM.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 13, 2026
    Permit
    Full Demolition · Full demolition existing one (1) story garage frame/brick building and footing foundation as per plan.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 4, 2026
    Permit
    Full Demolition · FULL DEMOLITION 1-1/2 STORY STUCCO BUILDING WITH CELLAR FLOOR FOUNDATION REMOVAL.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)