Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 334-340 HOTEL MANAGEMENT NYC DOB building permits | 9 | Plumbing · Hot water storage tank replacement No product keyword matched | 0 | Aug 13, 2026 |
| B | INFINITY REAL ESTATE NYC DOB building permits | 9 | Mechanical Systems · HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 0 |
| Aug 13, 2026 |
| B | L C CARPIO NO 2 CORP NYC DOB building permits | 9 | General Construction · ADDRESS VIOLATION VIO26-01705 No product keyword matched | 0 | Aug 13, 2026 |
| B | ENCORE FIRE PROT SVS INC NYC DOB building permits | 9 | Sprinklers · Filing herewith Sprinkler plans for sprinkler work and finishes associated with the interior fit out of Four Leaf Federal Credit Union. No change to use, egress, or occupancy No product keyword matched | 0 | Aug 13, 2026 |
| B | METACOMET CONSTRUCTION NYC DOB building permits | 9 | Mechanical Systems · Installation of HVAC system and related ductwork throughout existing 1 family dwelling renovation. All work as per plans submitted. No product keyword matched | 0 | Aug 13, 2026 |
| B | 196 NASSAU ARETZ LLC NYC DOB building permits | 9 | General Construction · LEGALIZING ILLEGAL DEMO ON THE 2ND. NEW OWNER PURCHASED PROPERTY ON 01/30/2026, CFRN 2026000049492. ADDRESSING ECB VIOLATIONS #: 39178418Z, 39178419K NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 13, 2026 |
| B | HARLEM VALLEY CORPORATION NYC DOB building permits | 9 | Plumbing · REGISTER LAUNDRY ROOM EQUIPMENT. INSTALL SPRINKLER HEADS OFF DOMESTIC WATER SUPPLY. No product keyword matched | 0 | Aug 13, 2026 |
| B | JCR SERVICES GROUP CORP NYC DOB building permits | 9 | General Construction · RESPECTFULLY PROPOSING REMOVAL OF EXISTING ACCORDION DOORS AND INSTALLATION OF FRENCH DOORS TO REAR DECK, AND INSTALLATION OF PRE-FABRICATED STAIR SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 13, 2026 |
| B | WING YIP REALTY CORP NYC DOB building permits | 9 | General Construction · FACADE REPAIR AS SHOWN ON PLANS. No product keyword matched | 0 | Aug 13, 2026 |
| B | JOSEPH CRUPI CONSTRUCT IN NYC DOB building permits | 9 | General Construction · STORE RENOVATION (ZARA KIDS) WORK TO INCLUDE PARTITION, CEILING AND DOOR MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 13, 2026 |
| B | 46-11 88th St. Corp NYC DOB building permits | 9 | General Construction · BRICK REPLACEMENT AND MORTAR REPOINTING AS PERPLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 13, 2026 |
| B | A.S.K. ELECTRICAL CORP NYC DOB electrical permits | 9 | ADDITIONAL LIGHTING AND POWER FOR RETAIL SPACE No product keyword matched | 0 | Aug 13, 2026 |
| B | ZIN ELECTRICAL, INC NYC DOB electrical permits | 9 | service and meters No product keyword matched | 0 | Aug 13, 2026 |
| B | SORAN ELECTRICAL, INC NYC DOB electrical permits | 9 | APARTMENT 4G. MAIN LUG CIRCUIT BREAKER PANEL CHANGE & KITCHEN CIRCUITS No product keyword matched | 0 | Aug 13, 2026 |
| B | MOMERN ELECT'L CONTRS INC NYC DOB electrical permits | 9 | General wiring, installing new light/outlets No product keyword matched | 0 | Aug 13, 2026 |
| B | ALL PRO ELECTRIC CONTROLS NYC DOB electrical permits | 9 | Disconnect all branch circuit lighting and receptacles wiring back to means of disconnect No product keyword matched | 0 | Aug 13, 2026 |
| B | Fortinet Inc. NYC DOB building permits | 9 | General Construction · General construction alterations on the 1st thru 4th floors for proposed change of use/occupancy; related work as per plans. No product keyword matched | 0 | Aug 12, 2026 |
| B | MODERN SERVICES SOLUTIONS NYC DOB building permits | 9 | General Construction · GENERAL CONSTRUCTION FOR LIMITED EXTERIOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 12, 2026 |
| B | AKHTAR CONSTRUCTION CO INC NYC DOB building permits | 9 | General Construction · FILED FOR HORIZONTAL EXTENSION AND CONVERSION EXISTING (1) FAMILY DWELLING TO (2) FAMILY DWELLING AS PER PLAN. OBTAIN NEW C.OF O. No product keyword matched | 0 | Aug 12, 2026 |
| B | ST. CLAIRE BUILDERS & CONTRACTORS L NYC DOB building permits | 9 | General Construction · FILING HEREWITH CONSTRUCTION OF THE FIRE PASSAGE AS PER PLANS IN CONJUNCTION WITH ALT I APPLICATION # 121209101. No product keyword matched | 0 | Aug 12, 2026 |
| B | LONG ISLAND ENVIRONMENTAL NYC DOB building permits | 9 | General Construction · INSTALLATION OF SUB-SLAB DEPRESSURIZATION SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 12, 2026 |
| B | FOUR BRIDGES CONSTRUCTION NYC DOB building permits | 9 | General Construction · PROPOSED EARTHWORK, FOUNDATION AND STRUCTURAL SYSTEM FOR A NEW BUILDING. No product keyword matched | 0 | Aug 12, 2026 |
| B | LORI-ZEE CORP NYC DOB building permits | 9 | Structural · Structural reinforcement of floor framing and beams at 3 & 5 floors and reinforcement of existing dunnage at roof level as per plans filed no change in use occupancy or egress No product keyword matched | 0 | Aug 12, 2026 |
| B | CENTRAL MANAGEMENT CORP NYC DOB building permits | 9 | General Construction · Renovation of an existing retail store at 1st floor. No change in use, egress or occupancy under this application. No product keyword matched | 0 | Aug 12, 2026 |
| B | LINCOLN CENTER NYC DOB building permits | 9 | General Construction · Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress. No product keyword matched | 0 | Aug 12, 2026 |
| B | CHARLES H. GREENTHAL MANAGEMENT COR NYC DOB building permits | 9 | Plumbing · INSTALLATION OF NEW GAS FIRED WATER HEATERS, STORAGE TANKS, AND BOOSTER PUMPS. INSTALLATION OF NEW DOMESTIC WATER LINES FROM CELLAR TO ROOF. NO CHANGE IN EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 12, 2026 |
| B | 184 N 8 LLC NYC DOB building permits | 9 | Mechanical Systems · Radon Mitigation System and associated fan. No change in use or egress. No product keyword matched | 0 | Aug 12, 2026 |
| B | GENERAL LEASING & MANAGEMENT CORP. NYC DOB building permits | 9 | Plumbing · Filing for plumbing work at the 4th and 5th floor. No change to use, egress, or occupancy. No product keyword matched | 0 | Aug 12, 2026 |
| B | ROGERS DEVELOPERS GRP LLC NYC DOB building permits | 9 | Construction Fence · Installation of 8 ft construction fence. No product keyword matched | 0 | Aug 12, 2026 |
| B | A&B CONSTRUCTION NY CORP NYC DOB building permits | 9 | Mechanical Systems · INSTALLATION OF KITCHEN EXHAUST HOOD FOR WARMING KITCHEN No product keyword matched | 0 | Aug 12, 2026 |
| B | GURRI INSTALLATION INC NYC DOB building permits | 9 | General Construction · RENOVATION OF THREE BATHROOMS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 0 | Aug 12, 2026 |
| B | THE COMMONWEALTH FUND NYC DOB building permits | 9 | Mechanical Systems · Filing for mechanical work consisting of installation of air conditioning systems and refrigerant piping and extension of new ductwork from existing air handling systems. No system-wide FA/Mechanical/Fire Protection integration is included or implied. No product keyword matched | 0 | Aug 12, 2026 |
| B | ALMAR PLUMBING & HTG CORP NYC DOB building permits | 9 | Plumbing · TO PROPOSE PLUMBING WORK OF EXISTING APARTMENT UNIT #13-131 ON 13RD FLOOR IN CONJUNCTION WITH GENERAL CONSTRUCTION JOB #M00934584-I1 AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTITICATE OF OCCUPANCY. No product keyword matched | 0 | Aug 12, 2026 |
| B | PINE BUILDERS CORP NYC DOB building permits | 9 | Mechanical Systems · MS job in conjunction with the NB application filed to construct a new 13 story commercial building. Tax lots 57, 60, 62, 163 merged into Tax lot 57. No product keyword matched | 0 | Aug 12, 2026 |
| B | JSL DESIGN INC NYC DOB building permits | 9 | General Construction · CONVERSION OF AN EXISTING TWO-FAMILY INTO A SINGLE-FAMILY HOUSE INCLUDING MINOR NON-BEARING INTERIOR DEMOLITION AND NEW PARTITIONS. TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 0 | Aug 12, 2026 |
| B | ENYQ CORP NYC DOB building permits | 9 | Plumbing · INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING INCONJUNCTION WITH ALTERATION DOB JOB #B00890375-I1 No product keyword matched | 0 | Aug 12, 2026 |
| B | 27 EAST 21 STREET, LLC NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 0 | Aug 12, 2026 |
| B | SZW CONSTRUCTION LLC NYC DOB building permits | 9 | Curb Cut · PROPOSED CURB CUT No product keyword matched | 0 | Aug 12, 2026 |
| B | 20 West 53rd Street Condominium NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 0 | Aug 12, 2026 |
| B | p national group NYC DOB building permits | 9 | Plumbing · Application filed for plumbing work in conjunction with renovation of three existing dwellings. Work to include cap & remove, relocate and new fixtures. gc work filed under initial application. No change to use, egress nor occupancy No product keyword matched | 0 | Aug 12, 2026 |
| B | MAXCAP CONSTRUCTION LLC NYC DOB building permits | 9 | Mechanical Systems · Installation of heat pump air conditioning units and energy recovery units for existing 3-story 2-family house. No changes to the egress and zoning No product keyword matched | 0 | Aug 12, 2026 |
| B | MONROE HOLDINGS NY LLC NYC DOB building permits | 9 | Mechanical Systems · INSTALLATION OF DUST COLLECTION SYSTEM AND VENTILATION SYSTEM FOR PROPOSED FABRICATION AREA IN FIRST FLOOR. FILED IN CONJUNCTION WITH B01067553-I1, B01067553-S1, B01067553-S3. No product keyword matched | 0 | Aug 12, 2026 |
| B | 1326 East Gun Hill Road LLC NYC DOB building permits | 9 | Plumbing · APPLICATION FILED IN CONJUNCTION WITH X01167903-I1 FOR RELATED PLUMBING WORK. INSTALLATION OF (10) PLUMBING FIXURES, (3) FLOOR DRAINS AND (1) NEW ELEC. HOT WATER HEATER. NO CHANGE IN OCCUPANCY, USE, EGRESS OR BULK. No product keyword matched | 0 | Aug 12, 2026 |
| B | HARLEMUNITED.ORG NYC DOB building permits | 9 | General Construction · Filing for limited exterior repair work of building facade. No change in use, egress, or occupancy. No product keyword matched | 0 | Aug 12, 2026 |
| B | KAUFMAN ASTORIA STUDIOS NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 12, 2026 |
| B | M-AZAD CONSTRUCTION INC NYC DOB building permits | 9 | General Construction · FILING TO CONVERT A 2 FAMILY INTO A 1 FAMILY. NO CHANGE IN EGRESS. No product keyword matched | 0 | Aug 12, 2026 |
| B | ISHCO INC NYC DOB building permits | 9 | General Construction · File for minor interior modification as per plan. No change to use egress or occupancy No product keyword matched | 0 | Aug 12, 2026 |
| B | The Unitarian Church of All Souls NYC DOB building permits | 9 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT THE EAST NEIGHBOR'S (162 E 80TH ST) SIDE YARD PROPERTY LINE. No product keyword matched | 0 | Aug 12, 2026 |
| B | SD 2 INC NYC DOB building permits | 9 | General Construction · INTERIOR RENOVATION OF EXISTING APARTMENT 6H. INTERIOR PARTITION, AND FINISH WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 0 | Aug 12, 2026 |
| B | MAXWELL PLUMB MECH. CORP NYC DOB building permits | 9 | Plumbing · Plumbing work in connection with combination of apartments 226 and 227. No change of use, egress or occupancy under this application. No product keyword matched | 0 | Aug 12, 2026 |