Mechanical Systems · INSTALLATION OF DUST COLLECTION SYSTEM AND VENTILATION SYSTEM FOR PROPOSED FABRICATION AREA IN FIRST FLOOR. FILED IN CONJUNCTION WITH B01067553-I1, B01067553-S1, B01067553-S3.
Mechanical Systems · INSTALLATION OF DUST COLLECTION SYSTEM AND VENTILATION SYSTEM FOR PROPOSED FABRICATION AREA IN FIRST FLOOR. FILED IN CONJUNCTION WITH B01067553-I1, B01067553-S1, B01067553-S3.
No product keyword matched · NYC DOB building permits
Sprinklers · Modification of existing sprinkler system in first floor commercial space to provide adequate coverage for proposed commercial space. Add 3 heads, relocate 1 head, and remove 3 sprinkler heads.
No product keyword matched · NYC DOB building permits
Plumbing · Plumbing work as shown on first floor in accordance with proposed interior renovation to the first floor with conversion of residential to manufacturing space.. Remove two baths and one lav.
No product keyword matched · NYC DOB building permits
General Construction · Alt-GC application herewith filed for interior renovation of one existing dwelling unit in a 5-story residential building to cure violation #35592486Z.
No product keyword matched · NYC DOB building permits