Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,502
Tier S19
New this week126
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
BWILDENSTEIN & CO. INC.
NYC DOB building permits
9
Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND STORAGE OF MATERIAL AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
0Aug 13, 2026
B
Seer chat
125 CNY LLC
NYC DOB building permits
9
Earth Work · PROPOSE A NEW TWO STORY WITH TWO FAMILY HOUSE. OBTAIN NEW C OF O.
No product keyword matched
0
Aug 13, 2026
BBowery Hotel Top Floor LLC, Lessee
NYC DOB building permits
9
Structural · Structural work filed in conjunction with alteration application for renovation of an existing penthouse. Work is limited to designing a roof opening and supporting a new stair.
No product keyword matched
0Aug 13, 2026
BSC CONTRACTING MANAGEMENT
NYC DOB building permits
9
General Construction · INTERIOR DEMOLITION AS SHOWN IN PLANS ON THE 1ST FLOOR EATING AND DRINKING ESTABLISHMENT. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
No product keyword matched
0Aug 13, 2026
BJEWISH COMMUNITY CENTER OF STATEN I
NYC DOB building permits
9
Mechanical Systems · WORK TYPE FILED FOR INSTALLATION OF 2 AC UNIT AT EXISTING ROOMS. C-13 AEROBICS DANCE ROOM AND C-40 WORKSHOP (MEDIA ROOM)2 CONDENSING UNITS AT OSP SIDE OF BUILDING ON WALL BRACKETS.
No product keyword matched
0Aug 13, 2026
BTHE NEW SCHOOL
NYC DOB building permits
9
Mechanical Systems · MECHANICAL WORK: DEMOLISH AND REROUTE EXISTING DUCTWORK & VAV BOXES TO FIT RENOVATED SPACES.INSTALL NEW PACKAGED AC UNITS ON FIRST FLOOR AND,NEW EXHAUST FANS FOR ADDED TOILETS, DYE LAB, & DRYER.
No product keyword matched
0Aug 13, 2026
BSERVIDIO INC
NYC DOB building permits
9
General Construction · ALTERATION TYPE 2 PLANS AND APPLICATIONS SUBMITTED HEREWITH FOR THE PROPOSED TOTAL INTERIOR RENOVATION OF THE EXISTING BASEMENT, FIRST AND SECOND FLOORS OF THE EXISTING TWO FAMILY, TWO STORY DWELLING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Aug 13, 2026
BMERVIN NEW CREATION CONS
NYC DOB building permits
9
General Construction · MINOR INTERIOR WORK AT CELLAR AND FIRST FLOOR. SLEEPING, COOKING OR SEPARATE RENTALS NOT ALLOWED IN CELLAR.
No product keyword matched
0Aug 13, 2026
BKHAIKA CONSTRUCTION INC
NYC DOB building permits
9
General Construction · PROPOSED INSTALLATION OF ONE NEW EXTERIOR ACCESSIBLE RAMP ON EXISTING SIDEWALK FOR EXISTING BUILDING
No product keyword matched
0Aug 13, 2026
BSTATESIDE CONSTRUCTION LLC
NYC DOB building permits
9
General Construction · Removal of extra parking spaces to convform to the legal number of 117 parking spaces as specified on NYS Final CO 2000.57 (see additional supporting documents).
No product keyword matched
0Aug 13, 2026
BGREEN STREET GROUP USA LLC
NYC DOB building permits
9
General Construction · RENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. NO CHANGE IN USE, EGRESS AND OCCUPANCY. INSTALL LIGHTING FIXTURES, RECEPTACLES & ELECTRICAL EQUIPMENT. INSTALL NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. INSTALL NEW SUSHI COUNTER
No product keyword matched
0Aug 13, 2026
BFESH POND FOOD SERVICES LLC
NYC DOB building permits
9
Mechanical Systems · SUBSEQUENT FILING FOR MS WORK TYPE IN CONJUNCTION WITH APPLICATION# B01341089-I1. INSTALL HVAC UNITS, KITCHEN EXHAUST HOOD & SYSTEM UP TO ROOF FOR A LITTLE CAESAR PIZZER ON 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
0Aug 13, 2026
BA. TOBIN INTERIORS INC
NYC DOB building permits
9
General Construction · INTERIOR RENOVATIONS TO AN EXISTING 4954 SF TOWNHOUSE TO PROVIDE FUNCTIONAL UPGRADES AND CAPITAL IMPROVEMENTS TO THE BASEMENT AND SECOND FLOOR LEVELS.
No product keyword matched
0Aug 13, 2026
BCORINTO CONSTRUCTION CORP
NYC DOB building permits
9
Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH INTERIOR MODIFICATIONS TO EXISTING 2 STORY RESIDENTIAL BUILDING. RELOCATE EXISTING GAS FURNACE WITH SPLIT SYSTEM COOLING COIL AND CONDENSER AND ASSOCIATED DUCTWORK AND PIPING.
No product keyword matched
0Aug 13, 2026
BNYC PLUMBING & HEATING IN
NYC DOB building permits
9
Plumbing · Plumbing work in conjunction to interior renovation work. No change in use, egress and occupancy
No product keyword matched
0Aug 13, 2026
BSAMIL CONTRACT INC
NYC DOB building permits
9
General Construction · HEREWITH FILED PROPOSED AWNING APPLICATION
No product keyword matched
0Aug 13, 2026
B213 GREEN ST
NYC DOB building permits
9
Curb Cut · Proposed modification of an existing Curb Cut to reflect minimum compliance requirements.
No product keyword matched
0Aug 13, 2026
BOVERTONE CONSULTING & CON
NYC DOB building permits
9
Mechanical Systems · Indoor a/c units and roof condensers; kitchen, dryer, bathrooms and fireplace exhausts.
No product keyword matched
0Aug 13, 2026
BPREFERENCE PAINTING & WAL
NYC DOB building permits
9
General Construction · RENOVATION WORK ON APT B1006 TO INCLUDE GENERAL CONSTRUCTION WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0Aug 13, 2026
B111 Worth
NYC DOB building permits
9
Sprinklers · REPLACE EXISTING SPRINKLER HEADS WITH NEW SPRINKLERS AND ASSOCIATED PIPING TO ACCOMODATE NEW CEILING AND NEW LAYOUT.
No product keyword matched
0Aug 13, 2026
BSmokey 1221 Dean LLC.
NYC DOB building permits
9
General Construction · RENOVATION AND CONVERSION OF EXISTING 2-FAMILY & 6 FURNISHED ROOMS RESIDENTIAL BUILDING TO 5-FAMILY RESIDENTIAL BUILDING.
No product keyword matched
0Aug 13, 2026
BHUDSON COMPANIES, INC.
NYC DOB building permits
9
Plumbing · INSTALL NEW PLUMBING FIXTURES, NEW COMMERCIAL COOKING EQUIPMENT, AND NEW FIRE SUPPRESSION VALVE AT THE FIRST FLOOR COMMERCIAL STORE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
No product keyword matched
0Aug 13, 2026
BOTIC PROFESSIONAL CONDOMINIUM
NYC DOB building permits
9
General Construction · FACADE REPAIR.
No product keyword matched
0Aug 13, 2026
BPeninsula Property Management
NYC DOB building permits
9
General Construction · Roof replacement down to existing deck as per plans. No change in use, occupancy, or egress.
No product keyword matched
0Aug 13, 2026
BW NEW POWER CONSTRUCTION
NYC DOB building permits
9
General Construction · INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. NEW POWDER ROOM ON THE 1st FLOOR, RELOCATION, AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
No product keyword matched
0Aug 13, 2026
BFAIRFIELD INN JFK
NYC DOB building permits
9
Mechanical Systems · Remove existing enclosure and duct riser and flue vent. Install (2) 5 vent flues.
No product keyword matched
0Aug 13, 2026
BGREAT INTERIOR RENOVATION
NYC DOB building permits
9
General Construction · INTERIOR RENOVATION OF APARTMENT 31E. REMOVE AND ERECT NON-LOAD BEARING INTERIOR PARTITIONS. REMOVE, RELOCATE AND REPLACE PLUMBING FIXTURES. PLUMBING AND MECHANICAL WORK TYPE FILED SUBSEQUENTLY VIA DOB NOW. NO CHANGE TO USE, EGRESS OR OCCUPANCY
No product keyword matched
0Aug 13, 2026
BPSGR LLC
NYC DOB building permits
9
General Construction · Tenant fit-out for Wingstop restaurant at this locaiton. No change in use, egress, or occupancy under this application.
No product keyword matched
0Aug 13, 2026
BLENNIE CONSTRUCTION CORP
NYC DOB building permits
9
Structural · APPLICATION FILED FOR STRUCTURAL WORK FOR THE INSTALLATION OF NEW STEEL STAIR AND NEW LANDING FRAMING AT PENTHOUSE FLOOR AND DUNNAGE BEAM EXTENSION. RELATED GC APPLICATION M01359395-I1.
No product keyword matched
0Aug 13, 2026
BNORWEGIAN SEAMEN'S CHURCH IN NEW YO
NYC DOB building permits
9
General Construction · RENOVATION OF EXISTING RECTORY. REMOVE/INSTALL NON-LOAD BEARING PARTITIONS AND FINISHES. NO CHANGE IN OCCUPANCY, USE OR EGRESS. MS, PL and SP filed as subsequent.
No product keyword matched
0Aug 13, 2026
BMC GOWAN BUILDERS INC
NYC DOB building permits
9
Structural · Structural drawings filed herewith for alteration of existing church.
No product keyword matched
0Aug 13, 2026
BKASSMAN
NYC DOB building permits
9
Sign · ILLUMINATED ACCESSORY NON ADVERTISING BUSINESS SIGN ON WALL. SIGN WORDING: NATURES FIRST PHARMACY
No product keyword matched
0Aug 13, 2026
BBENJAMIN MAINTENANCE
NYC DOB building permits
9
Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
0Aug 13, 2026
B2034 Stanhope Street LLC
NYC DOB building permits
9
Mechanical Systems · Filing this MECH application in conjunction with ALt-1 application # Q01271738-I1 for all new HVAC units, no change of use, egress or OCcupancy
No product keyword matched
0Aug 13, 2026
B64 Perry Street, LLC
NYC DOB building permits
9
Plumbing · Demolishing existing and adding new fixtures per plans. Relocation of existing range. as per plans. No change in use, egress or occupancy.
No product keyword matched
0Aug 13, 2026
BPacker Collegiate Institute
NYC DOB building permits
9
Boiler Equipment · INSTALLATION OF (3) NEW ELECTRIC HOT WATER BOILERS (LAARS EB-135-2080) AT 4TH FLOOR MECHANICAL ROOM AS AS PER PLANS. RELATED PLUMBING AND MECHANICAL WORK FILED SUBSEQUENTLY.
No product keyword matched
0Aug 13, 2026
BLowe's Home Centers, LLC
NYC DOB building permits
9
Solar · Solar Panel installation as per plans filed herewith.
No product keyword matched
0Aug 13, 2026
BCHRIS SNYDER DRAFTING & DESIGN
NYC DOB building permits
9
General Construction · Proposed installation of (3) thruwalll PTAC units as per plan. No change to use, egress or occupancy under this application.
No product keyword matched
0Aug 13, 2026
BNYC REMOLDERS INC
NYC DOB building permits
9
General Construction · APPLICATION HEREWITH FILED FOR INTERIOR RENOVATION OF AN EXISTING APARTMENT #4S. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.
No product keyword matched
0Aug 13, 2026
BSHI
NYC DOB building permits
9
Plumbing · Filing herewith for the modifications to existing plumbing system
No product keyword matched
0Aug 13, 2026
BCHURCH OF THE TRANSFIGURATION
NYC DOB building permits
9
Suspended Scaffold · SUSPENDED SCAFFOLD OUTRIGGER INSTALLATION FOR FACADE RESTORATION
No product keyword matched
0Aug 13, 2026
BCOMMERCIAL BUILDING AND R
NYC DOB building permits
9
General Construction · facade repairs
No product keyword matched
0Aug 13, 2026
BCITY LIMIT CONSTRUCTION *
NYC DOB building permits
9
General Construction · Facade repair
No product keyword matched
0Aug 13, 2026
B10 EAST 18TH STREET CONDOMINIUM
NYC DOB building permits
9
General Construction · Interior renovation to Apartment 5N- new non load bearing partitions, finishes and lighting
No product keyword matched
0Aug 13, 2026
BJOSEPH JOHN REALTY ENTERPRISES LLC
NYC DOB building permits
9
Mechanical Systems · Filing plans & paperwork for replacement of existing rooftop mechanical HVAC unit to existing rough piping & ductwork
No product keyword matched
0Aug 13, 2026
BSGVL Management
NYC DOB building permits
9
General Construction · ALT TYPE 2 REMOVAL OF FINISHES ON WALLS AND FLOORS AT LOBBY AT GROUND FLOOR LEVEL. MINOR REMOVAL OF NONFIRE-RATED AND NON-LOAD BEARING PARTITIONS, LIGHT FIXTURE REPLACEMENT AND MINOR PLUMBING ROUTING. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
No product keyword matched
0Aug 13, 2026
B1365 REALTY CORP
NYC DOB building permits
9
Mechanical Systems · INSTALLATION OF NEW KITCHEN MECHANICAL EXHAUST SYSTEM FOR COMMERCIAL KITCHEN OF EATING AND DRINKING ESTABLISH, INCLUDING TWO (2) TYPE I HOOD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
No product keyword matched
0Aug 13, 2026
BVertex Partnership
NYC DOB building permits
9
General Construction · FILED HEREWITH TO INSTALL TEMPORARY TRAILERS FOR CHARTER SCHOOL
No product keyword matched
0Aug 13, 2026
BTHE SLATE CONTRACTING COR
NYC DOB building permits
9
General Construction · PROPOSED INTERIOR RENOVATION AS INDICATED ON PLANS. ALL WORK TO BE DONE WITHIN APARTMENT G12.REMOVALS:-EXISTING WOOD FLOORING TO BE SANDED DOWN AND REFINISHED.INSTALLATION OF NEW PARTITIONS & DOOR. REFINISHING OF EXISTING WOOD FLOORING.
No product keyword matched
0Aug 13, 2026
BPERMANENT MISSION OF VENEZUELA UN
NYC DOB building permits
9
General Construction · Minor interior renovation of floor 1 and 2. No change to use, egress, zoning or occupancy.
No product keyword matched
0Aug 13, 2026
Showing 9,601–9,650 of 16,447
PreviousNext