General Construction · Removal of extra parking spaces to convform to the legal number of 117 parking spaces as specified on NYS Final CO 2000.57 (see additional supporting documents).
General Construction · Removal of extra parking spaces to convform to the legal number of 117 parking spaces as specified on NYS Final CO 2000.57 (see additional supporting documents).
No product keyword matched · NYC DOB building permits
Plumbing · Replace two existing toilet rooms with two accessible toilet rooms. Condensate for new split system. No change to egress, occupancy or use due to this filing.
No product keyword matched · NYC DOB building permits
Structural · Revise layout. Eliminate one masonry opening. Add new window in existing opening. No change to egress, occupancy or use due to this filing.
No product keyword matched · NYC DOB building permits
General Construction · Remove illegally installed partitions installed in rear of Apartment 3G at bedroom & living room to create additional bedrooms to comply with ECB Violation 35117463N. This will restore the apartment to its original legal layout.
No product keyword matched · NYC DOB building permits
Structural · 1. INSTALL NEW STEEL COLUMNS/SHORES, BEAMS, AND STEEL DECK IN THE CELLAR TO SUPPORT THE EXISTING CONCRETE SLAB OF THE COURTYARD FLOOR ABOVE. 2. ALL ABOVE AS PER ATTACHED PLANS AND SCHEME B. (SCHEME A, ONLY FOR REFERENCE). 3. INSTALL HANDICAP LIFT FRAMING
No product keyword matched · NYC DOB building permits