Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | PACXDESIGN NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF APT 28R ON THE 28TH FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. No product keyword matched | 2 | Aug 26, 2026 |
| B | AKCO CORP NYC DOB building permits |
| 10 |
General Construction · Interior renovation work to divide one classroom and add one bathroom. No product keyword matched |
| 1 |
| Aug 26, 2026 |
| B | 5537-225 WEST 23RD AND 220 WEST 24T NYC DOB building permits | 10 | Plumbing · Installation of new domestic water booster system in the cellar, including replacement of existing booster pumps with new inline pumps, associated piping, valves, and appurtenances. Existing domestic water service, meter, and RPZ to remain. No change to o No product keyword matched | 1 | Aug 26, 2026 |
| B | CHINESE UNITED METHODIST CHURCH COR NYC DOB building permits | 10 | Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 26, 2026 |
| B | TELIA CONTRACTING CORP NYC DOB building permits | 10 | General Construction · Interior renovation of existing class A apartment. No change of use, egress or occupancy under this application. No product keyword matched | 1 | Aug 26, 2026 |
| B | SOO JUNG LLC NYC DOB building permits | 10 | Mechanical Systems · MODIFICATION OF HVAC UNIT (HEATING/COOLING SYSTEM) AT EXISTING STORE (79-32). TO OBATAIN AN EQUIPMENT USE PERMIT (CERT. OF COMPLIANCE). NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS JOB. No product keyword matched | 1 | Aug 26, 2026 |
| B | Congregation Hope of Israel NYC DOB building permits | 10 | General Construction · Provide and install temporary boarding at the window opening using timber planks and plywood sheets to secure the fire-damaged building until permanent repairs are completed. No product keyword matched | 1 | Aug 26, 2026 |
| B | DAN'S SUPREME SUPERMARKETS INC NYC DOB building permits | 10 | Sign · NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - PULMONARY & SLEEP DISORDERS OF NEW YORK. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 26, 2026 |
| B | 461 ENY LLC NYC DOB building permits | 10 | Standpipe · INSTALL TEMPORARY STANDPIPE FOR NEW BUILDING IN CONJUCTION WITH NB JOB #321588607 AND SP/SD JOB #B00341492-I1. No product keyword matched | 1 | Aug 26, 2026 |
| B | 189 NEPTUNE AVE LLC NYC DOB building permits | 10 | Sign · THIS APPLICATION IS FILED TO INSTALL NON-ADVERTISING ILLUMINATED BUSINESS SIGN ABOVE EXISTING FIRST-FLOOR COMMERCIAL STOREFRONT. No product keyword matched | 1 | Aug 26, 2026 |
| B | 3RD & 85TH LLC NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF SPLIT-TYPE AIR CONDITIONING SYSTEM AT EXISTING APARTMENT #1A, INCLUDING INDOOR FAN COIL UNIT, OUTDOOR CONDENSER, REFRIGERANT PIPING, CONDENSATE DRAINAGE, AND ALL ASSOCIATED ELECTRICAL CONNECTIONS. NO CHANGE IN USE, EGRESS, AND OCCUPANCY No product keyword matched | 1 | Aug 26, 2026 |
| B | Roosevelt Hotel NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Aug 26, 2026 |
| B | EAST COAST BUILDERS GROUP NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF NEW SIDEWALK SHED AT 209 BROOKLYN NAVY YARD, BROOKLYN, NY 11205 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 26, 2026 |
| B | PAWN FUNDERS INC NYC DOB building permits | 10 | Curb Cut · 1. REDUCE EXISTING CURB CUT, LOCATED ON 69ROAD, TO 18'-0 WIDECURB CUT.2. PROPOSE (1) ONE MODIFIED 15'-0 CURB CUT INCLUDING TWO SPLAYSWITH SIZE OF 1'-6 (TOTAL CURB CUT SIZE 18'-0), LOCATED ALONGSOUTH SIDE OF 69TH ROAD. RESOLVE RCA COMPLAINT NO. 4A32257 No product keyword matched | 1 | Aug 26, 2026 |
| B | ROB ELECTRIC LLC NYC DOB electrical permits | 10 | 6TH FLOOR GYM - REMOVE EXISTING EMERGENCY LIGHTING FIXTURES. REMOVE EXISTING RECESSED LIGHT FIXTURES. REMOVE AND REINSTALL EXIT SIGNAGE TO BE FLUSH WITH WALL AND CORNER OF CEILING ON CENTER ABOVE THE DOOR. REPLACE SWITCHES AND PROVIDE NEW DIMMER ON UNDER TRACK LIGHTING FIXTURES. REPLACE AND RELOCATE EXISTING DOWN LIGHTS FIXTURE. PROVIDE NEW LIGHT FIXTURE (12 LOCATIONS). REPLACE AND RELOCATE EXISTING EMERGENCY EGRESS LIGHTS FIXTURE (4 LOCATIONS). No product keyword matched | 1 | Aug 26, 2026 |
| B | AXOL ELECTRICAL CONT. LLC NYC DOB electrical permits | 10 | Install new branch circuits for receptacles, lighting and switches in the ground fl. store No product keyword matched | 2 | Aug 26, 2026 |
| B | MAIN POWER ELECT CONTR NYC DOB electrical permits | 10 | Remedy Obtain Permit For ECB #39201666K. File Electrical Work 2nd Floor. New Light Fixtures, New Receptacles, New Wiring, New Apartment Riser New Electrical Panel. No product keyword matched | 1 | Aug 26, 2026 |
| B | SHELTER ELEC. MAINT. CORP NYC DOB electrical permits | 10 | Electrical Work No product keyword matched | 1 | Aug 26, 2026 |
| B | CHURCH OF ST. EDWARD THE MARTYR NYC DOB building permits | 10 | General Construction · Filing application for facade repairs. No change to use, egress or occupancy. No product keyword matched | 1 | Aug 25, 2026 |
| B | 232 W 15 LLC NYC DOB building permits | 10 | Mechanical Systems · Replacement of multi-zone air-conditioning split system unit. Replacement of hot water fin tube radiators in-kind capacity but different mounting style. No change in use, egress and occupancy. No product keyword matched | 1 | Aug 25, 2026 |
| B | BRONX ARTS AND SCIENCE CHARTER SCHO NYC DOB building permits | 10 | Standpipe · PROPOSED STANDPIPE WORK. ALL AS PER PLANS FILED HEREWITH. No product keyword matched | 1 | Aug 25, 2026 |
| B | 245 REALTY LLC NYC DOB building permits | 10 | General Construction · It is proposed to create a vanilla box for the new tenant, remove existing partitions, countertop, and plumbing fixtures to be removed under a separate LAA. No change of use, egress or occupancy. No product keyword matched | 1 | Aug 25, 2026 |
| B | APG NYC DOB building permits | 10 | Full Demolition · FULL DEMOLITION OF 4 STORY BUILDING No product keyword matched | 2 | Aug 25, 2026 |
| B | 169 CH9 OWNER, LLC NYC DOB building permits | 10 | General Construction · Interior renovation (partitions, ceilings and doors) layout change to existing unit PHQ (Penthouse) floor. No change in use, egress or occupancy. No product keyword matched | 2 | Aug 25, 2026 |
| B | NEW WHITEHALL APTS LLC NYC DOB building permits | 10 | General Construction · It is proposed to renovate 1st floor and mezzanine floor, remove access stairs at cellar and to amend existing CO FOR change of use of occupancy as shown on plans. No product keyword matched | 1 | Aug 25, 2026 |
| B | 388 AMZI HILL LLC NYC DOB building permits | 10 | Structural · Reframing on all floors and roof. Change of use from House of Worship to a Two Family Residence. No change in egress. No product keyword matched | 1 | Aug 25, 2026 |
| B | ACTA REALTY CORP. NYC DOB building permits | 10 | Suspended Scaffold · SUSPENDED SCAFFOLD FOR FACADE RESTORATION AS SHOWN ON PLANS No product keyword matched | 1 | Aug 25, 2026 |
| B | KHAL ALESK NYC DOB building permits | 10 | Construction Fence · Installation of 8' construction fence. No product keyword matched | 1 | Aug 25, 2026 |
| B | ADA B LLC NYC DOB building permits | 10 | Mechanical Systems · Mechanical work proposed as per plans filed herewith. No product keyword matched | 2 | Aug 25, 2026 |
| B | DIFY INC. NYC DOB building permits | 10 | Plumbing · INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME. No product keyword matched | 2 | Aug 25, 2026 |
| B | FIDELITY CONSTRUCTION CORP NYC DOB building permits | 10 | Construction Fence · 8 feet high construction fence No product keyword matched | 1 | Aug 25, 2026 |
| B | M. EARLY PLBG & HTG CORP NYC DOB building permits | 10 | Standpipe · install temporary dry standpipe during construction as per plans filed No product keyword matched | 3 | Aug 25, 2026 |
| B | UNIQUE FIRE SYSTEMS INC NYC DOB building permits | 10 | Mechanical Systems · NO CHANGE IN USE, EGRESS , OR OCCUPANCY UNDER THIS APPLICATION, SCOPE OF WORK TO INCLUDE INSTALLATION OF NEW TYPE 1 HOOD, NEW HVAC SPLIT UNIT AND ASSOCIATED DUCT WORK. No product keyword matched | 1 | Aug 25, 2026 |
| B | PAUL M MAINTENANCE INC NYC DOB building permits | 10 | Mechanical Systems · Herewith filing Mechanical modifications for Mount Sinai Orthopedics Clinic Extension. No change in use, egress, or occupancy. No product keyword matched | 2 | Aug 25, 2026 |
| B | EVAN CONSTURCTION CORP NYC DOB building permits | 10 | Construction Fence · INSTALL TEMPORARY 8FT PLYWOOD CONSTRUCTION CONSTRUCTION FENCE IN CONJUCTION WITH NB APPLICATION #X01298866 No product keyword matched | 1 | Aug 25, 2026 |
| B | FORTUNE 23 REALTY LLC NYC DOB building permits | 10 | Structural · PROPOSED STRUCTURAL WORK TYPE FOR HORIZONTAL & VERTICAL ENLARGEMENT TO ESTABLISH A 6-STORY BUILDING FOR FUNERAL ESTABLISHMENT AND COMMUNITY FACILITY USES, IN CONJUNCTION W/ ALT-CO APPLICATION Q01175010-I1. No product keyword matched | 3 | Aug 25, 2026 |
| B | K & W Management NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF 300PSF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Aug 25, 2026 |
| B | LUIGI CALIENDO & SONS,INC NYC DOB building permits | 10 | Earth Work · HERWITH PAA FOR GENERAL REVISION TO PREVIOUSLY APPROVED FOUNDATION PLANS, INCLUDING THE ADDITION OF HELICAL PILES AND ASSOCIATED FOUNDATION MODIFICATIONS. No product keyword matched | 5 | Aug 25, 2026 |
| B | ATRIUM CONSTRUCTIONS LLC NYC DOB building permits | 10 | Mechanical Systems · Propose mechanical work as per drawings filed herewith. No change in use, egress or occupancy. No product keyword matched | 1 | Aug 25, 2026 |
| B | GRANDEUR CONSULTING GROUP NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING FILING No product keyword matched | 1 | Aug 25, 2026 |
| B | St. Michael Church NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Aug 25, 2026 |
| B | MYPROPERTYMAN LLC NYC DOB building permits | 10 | Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION. No product keyword matched | 1 | Aug 25, 2026 |
| B | Maureen R Monaghan NYC DOB building permits | 10 | Structural · FOUNDATION WORK & STRUCTURAL FRAMING IN CONJUNCTION WITH THE REAR EXTENSION & NEW 4TH FLOOR ADDITION FILED UNDER GC #M01208069-I1. No product keyword matched | 1 | Aug 25, 2026 |
| B | JONAS RENOVATION CORP NYC DOB building permits | 10 | General Construction · CONVERSION OF ONE FAMILY HOUSE TO TWO FAMILY HOUSE AS PER PLANS FILED HEREWITH. MINOR CHANGE TO THE LAYOUT AND NEW CO PROPOSED. No product keyword matched | 1 | Aug 25, 2026 |
| B | DATA WATERPROOFING INC NYC DOB building permits | 10 | General Construction · Replacement of the lintel No product keyword matched | 1 | Aug 25, 2026 |
| B | AAA MANAGEMENT CORP NYC DOB building permits | 10 | General Construction · FILING HEREWITH FOR THE REMOVAL OF ALL THE MINOR INTERIOR IMPROVEMENT/RENOVATION OF THE PREVIOUS TENANT. No product keyword matched | 1 | Aug 25, 2026 |
| B | GRAND CONSTRUCTION & DEVELOPMENT GR NYC DOB building permits | 10 | General Construction · AMEND 1st FLOOR MAIXIMUM PERSONS PERMITTED AND C OF O TO COMMUNITY FACILITY-AUDLT DAY CARE WITH RECREATION AND FOOD CATERING. NO CHANGE IN USE, OR EGRESS. NO CHANGE IN OCCUPANCY FOR THE REST OF THE FLOORS. No product keyword matched | 1 | Aug 25, 2026 |
| B | KRM BROOKLYN LLC NYC DOB building permits | 10 | Construction Fence · CONSTRUCTION FENCE IN CONJUNCTION WITH BUILDING RENOVATION. No product keyword matched | 1 | Aug 25, 2026 |
| B | WEST END RESIDENCES NYC DOB building permits | 10 | General Construction · Filing for limited exterior repairwork, including masonry and stone repairwork, for facade, roof, and bulkheads. No change in use, egress, or occupancy. No product keyword matched | 1 | Aug 25, 2026 |
| B | ROLANDO FIRE SUPP MECH IN NYC DOB building permits | 10 | Sprinklers · NEW PLUMBING FIXTURES AND CONNECTIONS, NEW SPRINKLER HEADS. WORK INSIDE 2ND FLOOR SUITE ONLY. No product keyword matched | 1 | Aug 25, 2026 |