Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects

Prospects

Companies with dated public signals, ranked by fit with your products.

Prospects22,502
Tier S19
New this week126
AllSABC
TierCompanyScoreLatest signalSignals 90dLast signal
BPACXDESIGN
NYC DOB building permits
10
General Construction · INTERIOR RENOVATION OF APT 28R ON THE 28TH FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
No product keyword matched
2Aug 26, 2026
BAKCO CORP
NYC DOB building permits
Seer chat
10
General Construction · Interior renovation work to divide one classroom and add one bathroom.
No product keyword matched
1
Aug 26, 2026
B5537-225 WEST 23RD AND 220 WEST 24T
NYC DOB building permits
10
Plumbing · Installation of new domestic water booster system in the cellar, including replacement of existing booster pumps with new inline pumps, associated piping, valves, and appurtenances. Existing domestic water service, meter, and RPZ to remain. No change to o
No product keyword matched
1Aug 26, 2026
BCHINESE UNITED METHODIST CHURCH COR
NYC DOB building permits
10
Supported Scaffold · INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
1Aug 26, 2026
BTELIA CONTRACTING CORP
NYC DOB building permits
10
General Construction · Interior renovation of existing class A apartment. No change of use, egress or occupancy under this application.
No product keyword matched
1Aug 26, 2026
BSOO JUNG LLC
NYC DOB building permits
10
Mechanical Systems · MODIFICATION OF HVAC UNIT (HEATING/COOLING SYSTEM) AT EXISTING STORE (79-32). TO OBATAIN AN EQUIPMENT USE PERMIT (CERT. OF COMPLIANCE). NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS JOB.
No product keyword matched
1Aug 26, 2026
BCongregation Hope of Israel
NYC DOB building permits
10
General Construction · Provide and install temporary boarding at the window opening using timber planks and plywood sheets to secure the fire-damaged building until permanent repairs are completed.
No product keyword matched
1Aug 26, 2026
BDAN'S SUPREME SUPERMARKETS INC
NYC DOB building permits
10
Sign · NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - PULMONARY & SLEEP DISORDERS OF NEW YORK. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
No product keyword matched
1Aug 26, 2026
B461 ENY LLC
NYC DOB building permits
10
Standpipe · INSTALL TEMPORARY STANDPIPE FOR NEW BUILDING IN CONJUCTION WITH NB JOB #321588607 AND SP/SD JOB #B00341492-I1.
No product keyword matched
1Aug 26, 2026
B189 NEPTUNE AVE LLC
NYC DOB building permits
10
Sign · THIS APPLICATION IS FILED TO INSTALL NON-ADVERTISING ILLUMINATED BUSINESS SIGN ABOVE EXISTING FIRST-FLOOR COMMERCIAL STOREFRONT.
No product keyword matched
1Aug 26, 2026
B3RD & 85TH LLC
NYC DOB building permits
10
Mechanical Systems · INSTALLATION OF SPLIT-TYPE AIR CONDITIONING SYSTEM AT EXISTING APARTMENT #1A, INCLUDING INDOOR FAN COIL UNIT, OUTDOOR CONDENSER, REFRIGERANT PIPING, CONDENSATE DRAINAGE, AND ALL ASSOCIATED ELECTRICAL CONNECTIONS. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
No product keyword matched
1Aug 26, 2026
BRoosevelt Hotel
NYC DOB building permits
10
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
No product keyword matched
1Aug 26, 2026
BEAST COAST BUILDERS GROUP
NYC DOB building permits
10
Sidewalk Shed · INSTALLATION OF NEW SIDEWALK SHED AT 209 BROOKLYN NAVY YARD, BROOKLYN, NY 11205 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
1Aug 26, 2026
BPAWN FUNDERS INC
NYC DOB building permits
10
Curb Cut · 1. REDUCE EXISTING CURB CUT, LOCATED ON 69ROAD, TO 18'-0 WIDECURB CUT.2. PROPOSE (1) ONE MODIFIED 15'-0 CURB CUT INCLUDING TWO SPLAYSWITH SIZE OF 1'-6 (TOTAL CURB CUT SIZE 18'-0), LOCATED ALONGSOUTH SIDE OF 69TH ROAD. RESOLVE RCA COMPLAINT NO. 4A32257
No product keyword matched
1Aug 26, 2026
BROB ELECTRIC LLC
NYC DOB electrical permits
10
6TH FLOOR GYM - REMOVE EXISTING EMERGENCY LIGHTING FIXTURES. REMOVE EXISTING RECESSED LIGHT FIXTURES. REMOVE AND REINSTALL EXIT SIGNAGE TO BE FLUSH WITH WALL AND CORNER OF CEILING ON CENTER ABOVE THE DOOR. REPLACE SWITCHES AND PROVIDE NEW DIMMER ON UNDER TRACK LIGHTING FIXTURES. REPLACE AND RELOCATE EXISTING DOWN LIGHTS FIXTURE. PROVIDE NEW LIGHT FIXTURE (12 LOCATIONS). REPLACE AND RELOCATE EXISTING EMERGENCY EGRESS LIGHTS FIXTURE (4 LOCATIONS).
No product keyword matched
1Aug 26, 2026
BAXOL ELECTRICAL CONT. LLC
NYC DOB electrical permits
10
Install new branch circuits for receptacles, lighting and switches in the ground fl. store
No product keyword matched
2Aug 26, 2026
BMAIN POWER ELECT CONTR
NYC DOB electrical permits
10
Remedy Obtain Permit For ECB #39201666K. File Electrical Work 2nd Floor. New Light Fixtures, New Receptacles, New Wiring, New Apartment Riser New Electrical Panel.
No product keyword matched
1Aug 26, 2026
BSHELTER ELEC. MAINT. CORP
NYC DOB electrical permits
10
Electrical Work
No product keyword matched
1Aug 26, 2026
BCHURCH OF ST. EDWARD THE MARTYR
NYC DOB building permits
10
General Construction · Filing application for facade repairs. No change to use, egress or occupancy.
No product keyword matched
1Aug 25, 2026
B232 W 15 LLC
NYC DOB building permits
10
Mechanical Systems · Replacement of multi-zone air-conditioning split system unit. Replacement of hot water fin tube radiators in-kind capacity but different mounting style. No change in use, egress and occupancy.
No product keyword matched
1Aug 25, 2026
BBRONX ARTS AND SCIENCE CHARTER SCHO
NYC DOB building permits
10
Standpipe · PROPOSED STANDPIPE WORK. ALL AS PER PLANS FILED HEREWITH.
No product keyword matched
1Aug 25, 2026
B245 REALTY LLC
NYC DOB building permits
10
General Construction · It is proposed to create a vanilla box for the new tenant, remove existing partitions, countertop, and plumbing fixtures to be removed under a separate LAA. No change of use, egress or occupancy.
No product keyword matched
1Aug 25, 2026
BAPG
NYC DOB building permits
10
Full Demolition · FULL DEMOLITION OF 4 STORY BUILDING
No product keyword matched
2Aug 25, 2026
B169 CH9 OWNER, LLC
NYC DOB building permits
10
General Construction · Interior renovation (partitions, ceilings and doors) layout change to existing unit PHQ (Penthouse) floor. No change in use, egress or occupancy.
No product keyword matched
2Aug 25, 2026
BNEW WHITEHALL APTS LLC
NYC DOB building permits
10
General Construction · It is proposed to renovate 1st floor and mezzanine floor, remove access stairs at cellar and to amend existing CO FOR change of use of occupancy as shown on plans.
No product keyword matched
1Aug 25, 2026
B388 AMZI HILL LLC
NYC DOB building permits
10
Structural · Reframing on all floors and roof. Change of use from House of Worship to a Two Family Residence. No change in egress.
No product keyword matched
1Aug 25, 2026
BACTA REALTY CORP.
NYC DOB building permits
10
Suspended Scaffold · SUSPENDED SCAFFOLD FOR FACADE RESTORATION AS SHOWN ON PLANS
No product keyword matched
1Aug 25, 2026
BKHAL ALESK
NYC DOB building permits
10
Construction Fence · Installation of 8' construction fence.
No product keyword matched
1Aug 25, 2026
BADA B LLC
NYC DOB building permits
10
Mechanical Systems · Mechanical work proposed as per plans filed herewith.
No product keyword matched
2Aug 25, 2026
BDIFY INC.
NYC DOB building permits
10
Plumbing · INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
No product keyword matched
2Aug 25, 2026
BFIDELITY CONSTRUCTION CORP
NYC DOB building permits
10
Construction Fence · 8 feet high construction fence
No product keyword matched
1Aug 25, 2026
BM. EARLY PLBG & HTG CORP
NYC DOB building permits
10
Standpipe · install temporary dry standpipe during construction as per plans filed
No product keyword matched
3Aug 25, 2026
BUNIQUE FIRE SYSTEMS INC
NYC DOB building permits
10
Mechanical Systems · NO CHANGE IN USE, EGRESS , OR OCCUPANCY UNDER THIS APPLICATION, SCOPE OF WORK TO INCLUDE INSTALLATION OF NEW TYPE 1 HOOD, NEW HVAC SPLIT UNIT AND ASSOCIATED DUCT WORK.
No product keyword matched
1Aug 25, 2026
BPAUL M MAINTENANCE INC
NYC DOB building permits
10
Mechanical Systems · Herewith filing Mechanical modifications for Mount Sinai Orthopedics Clinic Extension. No change in use, egress, or occupancy.
No product keyword matched
2Aug 25, 2026
BEVAN CONSTURCTION CORP
NYC DOB building permits
10
Construction Fence · INSTALL TEMPORARY 8FT PLYWOOD CONSTRUCTION CONSTRUCTION FENCE IN CONJUCTION WITH NB APPLICATION #X01298866
No product keyword matched
1Aug 25, 2026
BFORTUNE 23 REALTY LLC
NYC DOB building permits
10
Structural · PROPOSED STRUCTURAL WORK TYPE FOR HORIZONTAL & VERTICAL ENLARGEMENT TO ESTABLISH A 6-STORY BUILDING FOR FUNERAL ESTABLISHMENT AND COMMUNITY FACILITY USES, IN CONJUNCTION W/ ALT-CO APPLICATION Q01175010-I1.
No product keyword matched
3Aug 25, 2026
BK & W Management
NYC DOB building permits
10
Sidewalk Shed · INSTALLATION OF 300PSF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched
1Aug 25, 2026
BLUIGI CALIENDO & SONS,INC
NYC DOB building permits
10
Earth Work · HERWITH PAA FOR GENERAL REVISION TO PREVIOUSLY APPROVED FOUNDATION PLANS, INCLUDING THE ADDITION OF HELICAL PILES AND ASSOCIATED FOUNDATION MODIFICATIONS.
No product keyword matched
5Aug 25, 2026
BATRIUM CONSTRUCTIONS LLC
NYC DOB building permits
10
Mechanical Systems · Propose mechanical work as per drawings filed herewith. No change in use, egress or occupancy.
No product keyword matched
1Aug 25, 2026
BGRANDEUR CONSULTING GROUP
NYC DOB building permits
10
Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING FILING
No product keyword matched
1Aug 25, 2026
BSt. Michael Church
NYC DOB building permits
10
Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
No product keyword matched
1Aug 25, 2026
BMYPROPERTYMAN LLC
NYC DOB building permits
10
Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
No product keyword matched
1Aug 25, 2026
BMaureen R Monaghan
NYC DOB building permits
10
Structural · FOUNDATION WORK & STRUCTURAL FRAMING IN CONJUNCTION WITH THE REAR EXTENSION & NEW 4TH FLOOR ADDITION FILED UNDER GC #M01208069-I1.
No product keyword matched
1Aug 25, 2026
BJONAS RENOVATION CORP
NYC DOB building permits
10
General Construction · CONVERSION OF ONE FAMILY HOUSE TO TWO FAMILY HOUSE AS PER PLANS FILED HEREWITH. MINOR CHANGE TO THE LAYOUT AND NEW CO PROPOSED.
No product keyword matched
1Aug 25, 2026
BDATA WATERPROOFING INC
NYC DOB building permits
10
General Construction · Replacement of the lintel
No product keyword matched
1Aug 25, 2026
BAAA MANAGEMENT CORP
NYC DOB building permits
10
General Construction · FILING HEREWITH FOR THE REMOVAL OF ALL THE MINOR INTERIOR IMPROVEMENT/RENOVATION OF THE PREVIOUS TENANT.
No product keyword matched
1Aug 25, 2026
BGRAND CONSTRUCTION & DEVELOPMENT GR
NYC DOB building permits
10
General Construction · AMEND 1st FLOOR MAIXIMUM PERSONS PERMITTED AND C OF O TO COMMUNITY FACILITY-AUDLT DAY CARE WITH RECREATION AND FOOD CATERING. NO CHANGE IN USE, OR EGRESS. NO CHANGE IN OCCUPANCY FOR THE REST OF THE FLOORS.
No product keyword matched
1Aug 25, 2026
BKRM BROOKLYN LLC
NYC DOB building permits
10
Construction Fence · CONSTRUCTION FENCE IN CONJUNCTION WITH BUILDING RENOVATION.
No product keyword matched
1Aug 25, 2026
BWEST END RESIDENCES
NYC DOB building permits
10
General Construction · Filing for limited exterior repairwork, including masonry and stone repairwork, for facade, roof, and bulkheads. No change in use, egress, or occupancy.
No product keyword matched
1Aug 25, 2026
BROLANDO FIRE SUPP MECH IN
NYC DOB building permits
10
Sprinklers · NEW PLUMBING FIXTURES AND CONNECTIONS, NEW SPRINKLER HEADS. WORK INSIDE 2ND FLOOR SUITE ONLY.
No product keyword matched
1Aug 25, 2026
Showing 8,901–8,950 of 16,447
PreviousNext