General Construction · Perform interior renovation work at Apt 4C on 4th Floor as shown on the plans, such as replace plumbing fixtures in the bathroom, rearrange non-load-bearing walls, and cosmetic work of painting and flooring. NO CHANGE in the USE, egress, and OCCUPANCY
No product keyword matched · NYC DOB building permits