Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | H BUILDERS NYC LLC NYC DOB building permits | 10 | Construction Fence · Filing Fence application subsequent to approved job number B00884434-I1. No product keyword matched | 4 | Sep 3, 2026 |
| B | CERCONE EXTERIOR REST COR NYC DOB building permits | 10 |
Suspended Scaffold · Installation of outrigger for facade repair & inspection. No product keyword matched |
| 1 |
| Sep 3, 2026 |
| B | SKYCORE BUILDERS, INC. NYC DOB building permits | 10 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY CONTRACTOR'S SHED DURING NEW BUILDING CONSTRUCTION No product keyword matched | 1 | Sep 3, 2026 |
| B | MASTER BUILT HOMES INC NYC DOB building permits | 10 | Structural · Proposed new two-family residence as per 2022 NYC Building Code No product keyword matched | 3 | Sep 3, 2026 |
| B | FLATIRON REAL ESTATE ADVISORS NYC DOB building permits | 10 | Structural · Structural framing around new bay window openings No product keyword matched | 1 | Sep 3, 2026 |
| B | HF GROUP PLMBG & SPNKLER NYC DOB building permits | 10 | Sprinklers · Install sprinkler heads to existing sprinkler and standpipe system as per plan filed in conjunction with GC # X01373793-I1. No product keyword matched | 2 | Sep 3, 2026 |
| B | ROCHDALE VILLAGE INC. NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF NEW SIDEWALK SHED AT 168-10 127 AVENUE, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 5 | Sep 3, 2026 |
| B | LIBERTY SQR IN OZONE PARK LLC NYC DOB building permits | 10 | General Construction · ALTERATION FOR INTERIOR TENANT IMPROVEMENTS IN AN EXISTING PHYSICAL CULTURE ESTABLISHMENT ON THE CELLAR & FIRST FLOORS AS PER PLANS. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Sep 3, 2026 |
| B | 521 TREMONT OWNER LLC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER APPROVED DRAWINGS. No product keyword matched | 1 | Sep 3, 2026 |
| B | STREKTE NYC DOB building permits | 10 | General Construction · Alt-CO application filed to subdivide existing retail space into 3 spaces on the first floor of existing eight (8) story with cellar mixed-use building. No product keyword matched | 1 | Sep 3, 2026 |
| B | EKL PROPERTY MANAGMENT INC NYC DOB building permits | 10 | Boiler Equipment · BOILER SYSTEM REPLACEMENT AS PER PLANS HERE WITHIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY. No product keyword matched | 2 | Sep 3, 2026 |
| B | TORAH TEMIMAH NYC DOB building permits | 10 | General Construction · ALTERATION TO PERFORM FULL GUT RENOVATION AND HORIZONTAL ENLARGEMENT No product keyword matched | 1 | Sep 3, 2026 |
| B | LEO CONSTRUCTION NY CORP NYC DOB building permits | 10 | Construction Fence · Construction fence filed for the demolition of existing building and construction of a new building. No product keyword matched | 1 | Sep 3, 2026 |
| B | 80 Sprague Group LLC NYC DOB building permits | 10 | General Construction · Construct a two- family residence with accessory off street parking for one car. No product keyword matched | 1 | Sep 3, 2026 |
| B | VINTAGE REAL ESTATE SERVICES NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AT 665 EAST 181 STREET, BRONX, NY 10457 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Sep 3, 2026 |
| B | I.H 1 CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · Proposed interior renovation on the cellar, 1st floor. Ceiling, flooring, and partition works as per plan. No change in use, bulk, egress or occupancy. No product keyword matched | 2 | Sep 3, 2026 |
| B | VERITAS SERVICES, INC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 111-50 42 AVENUE, QUEENS, NY 11368, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 3, 2026 |
| B | ECO VISTA DEVELOPMENT LLC NYC DOB building permits | 10 | Curb Cut · INSTALL (1) 10.0' WIDE NEW CURB CUT. No product keyword matched | 2 | Sep 3, 2026 |
| B | NEW ERA MECH SERVICE INC NYC DOB building permits | 10 | Plumbing · INTERIOR RENOVATION TO BUILD COMMERCIAL LAUNDRY. WORK INCLUDES NEW INSTALLATION OF WASHING MACHINES, DRYERS, WATER HEATER AND MODIFICATION OF EXISTING SPRINKLER SYSTEM TO INCLUDE NEW SPRINKLER HEADS. No product keyword matched | 1 | Sep 3, 2026 |
| B | DIGITAL CONSTRUCTION TECH NYC DOB building permits | 10 | Curb Cut · FILING IN ASSOCIATION WITH APPLICATION NUMBER 420565347 FOR THE PURPOSE OF REINSPECTION AND SIGN OFF. Uploaded as supported documents approved plans under job number 420563347 dated 5/1/12. This job was approved constructed inspected but never signed off No product keyword matched | 1 | Sep 3, 2026 |
| B | KAMALJIT K. SANDHU NYC DOB building permits | 10 | Full Demolition · FULL HAND DEMOLITION OF EXISTING 2 STORY AND ATTIC FRAME DWELLING. No product keyword matched | 3 | Sep 3, 2026 |
| B | J & N REMODELING INC NYC DOB building permits | 10 | General Construction · Mount Sinai - Atran-Berg MSH Dubin Breast Center Expansion - Interior renovations including modifications to millwork, ceiling work, and related construction as per plans filed herewith. No change in use, egress, or occupancy. No product keyword matched | 4 | Sep 3, 2026 |
| B | VERSATILE RENOVATIONS COR NYC DOB building permits | 10 | Mechanical Systems · REMOVAL OF EXISTING HEATING SYSTEM (BOILER) AND THE INSTALLATION OF NEW HVAC AND VENTILATION EQUIPMENT FOR A RENOVATED 1-FAMILY HOME No product keyword matched | 2 | Sep 3, 2026 |
| B | LHOTSE CORP NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffolding For facade restoration as shown on plans PAA1 Additional Drop Locations No product keyword matched | 1 | Sep 3, 2026 |
| B | JLJ BRICKEN LLC C/O OLMSTEAD PROPER NYC DOB building permits | 10 | General Construction · Renovate 17th fl. Non bearing partitions and finishes removal. New partitions and finishes. No change in use, egress or occupancy No product keyword matched | 1 | Sep 3, 2026 |
| B | GALCON ENTERPRISES INC NYC DOB building permits | 10 | General Construction · Interior Renovation of apt 2AB only. no change in use, egress or occupancy. No product keyword matched | 2 | Sep 3, 2026 |
| B | ADVANCED CONTRACTING SERV NYC DOB building permits | 10 | General Construction · Two-story horizontal enlargement at rear on an existing two-story & attic, two-family dwelling. No change in use, occupancy or exit. CO 213045-1975 No product keyword matched | 1 | Sep 3, 2026 |
| B | SV333 Realty LLC NYC DOB building permits | 10 | General Construction · Interior renovation of existing commercial lobby including new finishes. No change to use, egress, or occupancy. No product keyword matched | 5 | Sep 3, 2026 |
| B | NORTHEASTERN TOWERS ANNEX LP NYC DOB building permits | 10 | Sprinklers · Plumbing and sprinkler work for the build out of new Pre K space No product keyword matched | 1 | Sep 3, 2026 |
| B | DOWNTOWN PLBG & HTG INC NYC DOB building permits | 10 | Plumbing · APPLICATION FILED TO REMOVE &REPLACE GAS PIPING IN ASSOCIATION WITH B01189666-I1 FOR LEGALIZATION OF GAS FIRED FIXTURES AT CELLAR LEVEL OF EXISTING 2 STORY 3 FAMILY RESIDENTIAL BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 3, 2026 |
| B | Electrify America LLC NYC DOB building permits | 10 | Structural · ST modification including slabs over existing CEL, raised slab & ramp over existing 001, new steel columns & steel framing at Roof for MEP Equipment & openings. New steel structure for facade support & replacement existing pop-up roof. No product keyword matched | 1 | Sep 3, 2026 |
| B | M.N.C. GENERAL CONTR CORP NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 3, 2026 |
| B | EMPIRE GENERAL CONTRACTIN NYC DOB building permits | 10 | Mechanical Systems · Filing for the removal of existing wall mounted FCU, piping and associated controls. Relocate existing wall mounted Fan Coil unit and Install New Heat Pump on Roof. No product keyword matched | 1 | Sep 3, 2026 |
| B | G. LUCAJ HOME IMPROVEMENT NYC DOB building permits | 10 | General Construction · REMOVAL AND INSTALLATION OF PARTITIONS, DOORS, FLOORING, PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESSS, OR OCCUPANCY. No product keyword matched | 1 | Sep 3, 2026 |
| B | ICS AMERICA CO LTD NYC DOB building permits | 10 | Mechanical Systems · INSTALL REPLACEMENT CHIMNEY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 3, 2026 |
| B | 1 ALEXANDERS GROUP INC NYC DOB building permits | 10 | Mechanical Systems · FILE HEREWITH MECHANICAL WORK OF FOUR (4) STORY, FOUR (2) FAMILY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT 1# B01115648-I1 No product keyword matched | 1 | Sep 3, 2026 |
| B | REEP-OFC 757 Third Avenue NY LLC NYC DOB building permits | 10 | General Construction · ALTERATIONS TO CREATE NEW OPENING IN THE EXISTING 4TH, 5TH, AND 6TH FLOOR SLABS. INSTALLATION OF THE SUPPORTING COMPONENTS OF NEW OPEN (NON-EGRESS) ORNAMENTAL STAIRWAYS. THE STAIRS WILL CONNECT THE 3RD & 4TH FL, 4TH & 5TH FL, 5TH & 6TH FL AS PER PLANS. No product keyword matched | 2 | Sep 3, 2026 |
| B | JULIO ESCALANTE NYC DOB building permits | 10 | General Construction · filed to show existing condition to include egress doors, interior stairs, walls and columns No product keyword matched | 1 | Sep 3, 2026 |
| B | FRANKLIN POINT HOLDING LLC NYC DOB building permits | 10 | Plumbing · Modifications to the existing gas plumbing system. No change in use, egress or occupancy. No product keyword matched | 1 | Sep 3, 2026 |
| B | MASTERS RENOVATION GROUP* NYC DOB building permits | 10 | General Construction · Interior renovation of lobby of the 1st floor. General Construction. No change in use, occupancy or egress. No product keyword matched | 2 | Sep 3, 2026 |
| B | RE GENERAL CONTRACTING SE NYC DOB building permits | 10 | Mechanical Systems · Installation of mechanical equipment & related piping / ductwork as shown on plan set filed herewith. Filed in conjunction with ALT CO application for renovation to SRO Class-B property. Building is currently and will remain vacant during renovation No product keyword matched | 1 | Sep 3, 2026 |
| B | UNIGROW INC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF GROUND FLOOR APARTMENT IN EXISTING TWO FAMILY BUILDING. NO WORK ON APARTMENT ABOVE. No product keyword matched | 1 | Sep 3, 2026 |
| B | SASCO CONSTRUCTION SVC LL NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 1 | Sep 3, 2026 |
| B | CENTRAL UTA NYC DOB building permits | 10 | Plumbing · Installation of new 3 domestic service, sanitary piping, and plumbing fixtures on the 1st floor. No product keyword matched | 2 | Sep 3, 2026 |
| B | DELCO PROPERTIES LLC NYC DOB building permits | 10 | Plumbing · FILING PLUMBING WORKTYPE INCLUDING UNDERGROUND SITE CONNECTION IN CONJUNCTION WITH NB APP Q01127079. Plumbing PAA application filed to remove Soil Percolation Test from the TR1 item list, no change to the plans. No product keyword matched | 1 | Sep 3, 2026 |
| B | MILLER MANAGEMENT NYC DOB building permits | 10 | General Construction · FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 3, 2026 |
| B | SUPERIOR INK CONDOMINIUM NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 3, 2026 |
| B | HEIGHTS CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · RENOVATION OF EXISTING SINGLE FAMILY TOWNHOUSE FILED IN CONJUNCTION WITH DOB NOW PL MH AND ST. . NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 4 | Sep 3, 2026 |
| B | Tiebreaker Productions llc. NYC DOB building permits | 10 | General Construction · Temporary structures for the Forest Hills Stadium programming. No changes to existing structures, use or egress. No product keyword matched | 1 | Sep 3, 2026 |
| B | MACARTHUR MANAGEMENT CORP. NYC DOB building permits | 10 | General Construction · ERECT NEW AWNING WITH COPY. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Sep 3, 2026 |