Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Protection and Mechanical Methods · INSTALLATION OF 4,400 LB CAPACITY SINGLE PERSONNEL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits
Structural · New stair from 1st to 2nd floor, new MEP and refuse chute slab openings from floors 1-11, new MEP dunnage at roof, new bay window framing, reinforcement of existing vault at cellar.
No product keyword matched · NYC DOB building permits
Plumbing · Demolition and removal of existing plumbing fixtures & equipment including all related piping as per plans filed herewith. No change is use occupancy or egress.
No product keyword matched · NYC DOB building permits
General Construction · Non-structural interior demolition and installation of new partitions. No change to egress, use or occupancy. MPP meeting held on 4/22/25.
No product keyword matched · NYC DOB building permits
Sidewalk Shed · INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits