Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | OAK DEVELOPERS, LLC NYC DOB building permits | 10 | Sprinklers · INSTALLATION OF NEW COMBINED WATER SERVICE WITH BFPA AND FIRE SPRINKLER SYSTEM No product keyword matched | 2 | Sep 11, 2026 |
| B | Owemanco in the Village LP NYC DOB building permits | 10 |
Structural · Propose structural work to install structural steel framing to support new mechanical equipments on roof for existing commercial space of eating & drinking establishment as per plan. No change in use, egress, or occupancy. No product keyword matched |
| 2 |
| Sep 11, 2026 |
| B | THE METRO GROUP, INC NYC DOB building permits | 10 | Mechanical Systems · INSTALL REPLACEMENT EXTERIOR CHIMNEY AND ROOF MOUNTED DRAFT INDUCER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Sep 11, 2026 |
| B | GJUSHI CONSTRUCTION CO LLC NYC DOB building permits | 10 | Construction Fence · 8' HIGH CONSTRUCTION FENCE AROUND PROPERTY PERIMETER No product keyword matched | 1 | Sep 11, 2026 |
| B | West Harlem Group Assistance, Inc. NYC DOB building permits | 10 | Solar · Installation of 24.2 kw solar energy system on two adjacent roof, Lot #105 system size 12.32KW DC and Lot #106, system size 11.88 KW DC with one interconnection to Lot#106 No change of occupancy, use or egress. Lot#105 DOB Now Application #M01348459-I1 No product keyword matched | 2 | Sep 11, 2026 |
| B | MEHRAN PROPERTY MGT NYC DOB building permits | 10 | General Construction · ALTERATION FOR INTERIOR TENANT IMPROVEMENTS IN AN EXISTING PHYSICAL CULTURE ESTABLISHMENT ON THE FIRST AND SECOND FLOOR. AS PER PLANS. NO CHANGE IN BULK, USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Sep 11, 2026 |
| B | TACONIC BUILDERS INC NYC DOB building permits | 10 | Mechanical Systems · Herewith filing mechanical work on floors 26-28, as per plans submitted. No change to use, egress or occupancy. No product keyword matched | 1 | Sep 11, 2026 |
| B | THOMAS STEPHENS CONSTRUCTION INC. NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF AN EXISTING APARTMENT WITHIN A 2-FAMILY RESIDENCE ADDITION OF A ROOFTOP BULKHEAD & SELECTIVE DEMOLITION OF NON-LOAD BEARING/FIRERATED INTERIOR PARTITIONS, COMPLETE RENOVATION OF THE KITCHEN & BATHROOM. PLUMBING WORK Q01102763-I No product keyword matched | 1 | Sep 11, 2026 |
| B | HOME BY ME INC NYC DOB building permits | 10 | General Construction · RENOVATE EXISTING APARTMENT: PARTITIONS, CEILING, FLOORING, CABINETRY, COUNTER, DOORS, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Sep 11, 2026 |
| B | THOMAS STEPHENS CONSTRUCT NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION TO INCLUDE PARTITION WORK, CREATE OPENINGFOR RELOCATED CONVENIENCE STAIR, AND REPLACEMENT OF EXTERIORWINDOWS/DOORS. No product keyword matched | 1 | Sep 11, 2026 |
| B | BERIK MANAGEMENT NYC DOB building permits | 10 | General Construction · FACADE AND BULKHEAD RESTORATION INCLUDING MASONRY REPLACEMENT, REPOINTING OF MORTAR JOINTS, WINDOW SILL REPLACEMENT, PARAPET REPLACEMENT AND LINTEL REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Sep 11, 2026 |
| B | XING RONG INC NYC DOB building permits | 10 | Plumbing · FILE PL WORKTYPE IN CONJUNCTION WITH JOB#B01205688 No product keyword matched | 1 | Sep 11, 2026 |
| B | SILVERSTEIN PROPERTIES INC. NYC DOB building permits | 10 | Mechanical Systems · Providing heating, cooling and ventilation for the new space. Providing kitchen exhaust and make-up air systems as per code requirements. No product keyword matched | 2 | Sep 11, 2026 |
| B | C.A.C. INDUSTRIES, INC NYC DOB building permits | 10 | General Construction · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection. Install new reinforced concrete footings with new steel post between the cellar slab and first floor wood joist. Repoint joists and repair bricks on facade. No product keyword matched | 1 | Sep 11, 2026 |
| B | WD BUILDERS INC NYC DOB building permits | 10 | Construction Fence · Install construction fence. No product keyword matched | 2 | Sep 11, 2026 |
| B | TOP LEVEL RESTORATION COR NYC DOB building permits | 10 | General Construction · APPLICATION FILING TO REBUILD RAER GARAGE WALL TO ADDRESS ECB VIOLATION#39160643J & DOB VIOLATION# 25-02145 AS PER PLAN. NO CHNAGE OF USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 11, 2026 |
| B | EUDA CONSTRUCTION & NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF HVAC SYSTEM TO SERVE NEW CONFIGURATION IN APTS 4W/E AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Sep 11, 2026 |
| B | BORIS MECHANICAL INC NYC DOB building permits | 10 | Plumbing · INSTALLATION OF GAS WATER HEATER ADDITIONAL GAS METER IN EXISTNG COMMERCIAL SPACE. NO CHANGE IN USE, OCCUPANCY OR EGRESS No product keyword matched | 1 | Sep 11, 2026 |
| B | CHATEL CONSTRUCTION CORP NYC DOB building permits | 10 | Structural · OPENINGS IN MASONRY WALLS, NEW REAR DECK AND STAR, MISC. FRAMING ALTERATIONS. No product keyword matched | 3 | Sep 11, 2026 |
| B | SANDYSTON CONSTRUCTION CO NYC DOB building permits | 10 | Construction Fence · CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB #210181444 No product keyword matched | 4 | Sep 11, 2026 |
| B | MNR RESTORATION GROUP INC NYC DOB building permits | 10 | Structural · INSTALLATION OF TEMPORARY WATER TANK SHORING AS PER PLANS. TEMPORARY WATER TANK SHORING IS FILED IN CONJUNCTION WITH PERMIT #M01247727. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 11, 2026 |
| B | SANDYSTON CONSTRUCTION CORPERATION NYC DOB building permits | 10 | Supported Scaffold · Scaffolding and needle beams installation at the exterior facades and supported scaffold inside the elevator and stair shafts from the 3rd floor to the roof level. No product keyword matched | 1 | Sep 11, 2026 |
| B | DL GOLD INC. NYC DOB building permits | 10 | Suspended Scaffold · OUTRIGGER FOR FACADE REPAIR. No product keyword matched | 3 | Sep 11, 2026 |
| B | GOLD FINCH ETXT LLC NYC DOB building permits | 10 | Plumbing · partial plumbing work, new building sewer as per DEP approved site connection. DOB inspection sewer steel sleeve through foundation wall. No product keyword matched | 2 | Sep 11, 2026 |
| B | UNIQUE RESTORATION CONSTRUCTION NYC DOB building permits | 10 | General Construction · PROPOSED OF FRONT PARAPET WALL REPLACEMENT TO BE DONE AS NEEDED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 11, 2026 |
| B | GRAVESEND CONSTRUCTION CO NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION IN APT 9B . NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Sep 11, 2026 |
| B | 988 Fifth Avenue 12th Floor LLC NYC DOB building permits | 10 | Mechanical Systems · INSTALL NEW CHIMNEY LINER FOR WOOD BURNING FIREPLACE AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Sep 11, 2026 |
| B | FINE ARTS HOUSING INC. NYC DOB building permits | 10 | Plumbing · Gas work to include relocation of 1 gas range . Plumbing work to include : relocation of 1 kitchen sink, 1 DW, 1 washer/dryer, 2 toilets, 2 lavs, 1 tub and 1 shower; Addition of: 1 toilet, 1 lav , 1 tub , 1 shower No product keyword matched | 1 | Sep 11, 2026 |
| B | 27-24 JACKSON AVE., LLC NYC DOB building permits | 10 | Plumbing · NEW PLUMBING FIXTURES AT 1st FLOOR No product keyword matched | 1 | Sep 11, 2026 |
| B | JIN AN INC NYC DOB building permits | 10 | Mechanical Systems · Interior renovation of the existing first floor and cellar; minor works as per plans submitted herewith; plumbing filed under #Q01366634-S1; No change to use, egress and occupancy. No product keyword matched | 1 | Sep 11, 2026 |
| B | ZMK LLC NYC DOB building permits | 10 | General Construction · Renovation and enlargement of existing 2 family's house. new C of O to be obtained to change to reconfigure units location. No product keyword matched | 2 | Sep 11, 2026 |
| B | BELL REALTY NYC DOB building permits | 10 | Sign · ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 11, 2026 |
| B | A&G GEN'L CONTRACTOR CORP NYC DOB building permits | 10 | Plumbing · PROPOSE TO INSTALL COMMERCIAL GAS COOKING EQUIPMENT, CAP & REMOVE PLUMBING FIXTURES, AND INSTALL NEW PLUMBING FIXTURES IN ACCORDANCE WITH PLANS SUBMITTED HEREWITH. No product keyword matched | 2 | Sep 11, 2026 |
| B | GARRITY CONTRACTING LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF APARTMENT 5L DUE TO SPRINKLER MAIN FLOOD DAMAGE, INCLUDING DEMOLITION AND REPLACEMENT OF NON-BEARING PARTITIONS, FINISHES, CABINETRY, CEILINGS, FLOORING, AND RELATED GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Sep 11, 2026 |
| B | GJUSHI CONSTRUCTION CO LL NYC DOB building permits | 10 | General Construction · Application filed to revert back to prior existing conditions & legalize new partitions & doors as noted on plans. All work in response to cure violation #'s 39138854Z, 39138858X & 39138852P. Plumbing filed separate. No change in use, egress or occupancy. No product keyword matched | 1 | Sep 11, 2026 |
| B | Avenue Capital Group NYC DOB building permits | 10 | Plumbing · Plumbing and Sprinkler work associated with the interior renovation of the apartment as shown on plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 2 | Sep 11, 2026 |
| B | GEOFFREY GREEN NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF A TWO BEDROOM APARTMENT IN A TWO FAMILY HOUSE; WORK INCLUDES A KITCHEN, TWO BATHROOMS, AND TWO BEDROOMS. ALL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 11, 2026 |
| B | Furnival LLC NYC DOB building permits | 10 | Plumbing · Plumbing work filed in conjunction with M01363913-I1. No product keyword matched | 3 | Sep 11, 2026 |
| B | 105-18 Northern Realty LLC NYC DOB building permits | 10 | Sign · INSTALLATION OF NEW BUSINESS ACCESSORY ILLUMINATED WALL SIGN. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Sep 11, 2026 |
| B | JANDR ENTERPRISE CORP NYC DOB building permits | 10 | Structural · HEREWITH FILING FOR VERTICAL AND HORIZONTAL EXTENSION OF EXISTING ONE-FAMILY HOME. NO CHANGE TO USE. No product keyword matched | 1 | Sep 11, 2026 |
| B | GRENADIER REALTY CORP. NYC DOB building permits | 10 | Suspended Scaffold · SUSPENDED SCAFFOLD PLANS FOR FACADE REPAIRS AND INSPECTIONS No product keyword matched | 1 | Sep 11, 2026 |
| B | BOTTOM LINE CONSTRUCTION NYC DOB building permits | 10 | General Construction · Interior renovation of existing dwelling space to include new floors, doors, and partitions. No change of use, access, or egress under this application. No product keyword matched | 1 | Sep 11, 2026 |
| B | SilverLining Development NYC DOB building permits | 10 | Construction Fence · installation of construction fence to protect site during full demolition. No product keyword matched | 2 | Sep 11, 2026 |
| B | HSR CORP. NYC DOB building permits | 10 | Plumbing · INSTALLATION/ MODIFICATION OF PLUMBING FIXTURES GAS KITCHEN EQUIPMENT AND SHUT-OFF GAS VALVE FOR UPGRADE OF FIRE SUPPRESSION SYSTEM IN COMMERCIAL KITCHEN FOR EXISTING RESTAURANT/ NO CHANGE OR EGRESS OCCUPANCY. No product keyword matched | 3 | Sep 11, 2026 |
| B | BRONX PARK EAST HOUSING CO., INC NYC DOB building permits | 10 | General Construction · Facade repairs including brick masonry repairs, water table repair, etc. and to resolve ECB Violation 35717796K No product keyword matched | 2 | Sep 11, 2026 |
| B | 1310 STRATFORD AVE USA LLDC NYC DOB building permits | 10 | General Construction · EXISTING 2 STORY & CELLAR, 4 FAMILY DWELLING: FILING TO ADDRESS VIOLATION AT CELLAR No product keyword matched | 1 | Sep 11, 2026 |
| B | PLATINUM MAINTENANCE SERV NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffold Installation for Facade Restoration and Inspection No product keyword matched | 1 | Sep 11, 2026 |
| B | ONZAG INC NYC DOB building permits | 10 | General Construction · Interior renovation of apartment 6H. No change in use, egress or occupancy. No product keyword matched | 1 | Sep 11, 2026 |
| B | HOTI GROUP CORP NYC DOB building permits | 10 | General Construction · GUT RENOVATION THROUGHOUT EXISTING 5-STORY RESIDENTIAL BUILDING. CHANGE OCCUPANCY FROM THREE-FAMILIES TO ONE-FAMILY. No product keyword matched | 2 | Sep 11, 2026 |
| B | BREEZY PLACE LLC NYC DOB building permits | 10 | General Construction · PAA P3 IS FILED TO AMEND SCHEDULE A TO SHOW PROPORTIONAL AREAS OF APARTMENTS ON EACH FLOOR UPON REQUEST OF THE CO PUBLIC ADVOCATE. NO CHANGES TO PLANS, PW3. No product keyword matched | 1 | Sep 11, 2026 |