Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/C.A.C. INDUSTRIES, INC
Back to prospects

C.A.C. INDUSTRIES, INC

Manhattan, Brooklyn, BROOKLYN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 10 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
C.A.C. INDUSTRIES, INC
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Sep 11, 2026
Source for Signal date (opens in new tab)
Signal count
20 saved signals, 1 in the last 90 days
Signal summary
General Construction · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection. Install new reinforced concrete footings with new steel post between the cellar slab and first floor wood joist. Repoint joists and repair bricks on facade.
Source for Signal summary (opens in new tab)
Address
54-08 VERNON BLVD
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

20 signals
  • Sep 11, 2026
    Permit
    General Construction · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection. Install new reinforced concrete footings with new steel post between the cellar slab and first floor wood joist. Repoint joists and repair bricks on facade.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 5, 2026
    Permit
    Structural · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening by installing new steel post between cellar and first floor. Facade to be repaired as per plans herewith.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Aug 4, 2026
    Permit
    Structural · SECOND ave SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault rem, rep. of existing entrance with new reinforced concrete walls, & slab for new cellar hatch with vertical ladder. Repair of deteriorated bricks & repointing on facade
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 31, 2026
    Permit
    General Construction · PROPOSE TO ERECT A NEW TWO STORY METAL FRAME BUILDING CONSTRUCTION CLASS IIB TO HOUSE A WATER TREATMENT FACILITY AND ACCESSORY OFFICE ALL AS PER PLANS FILED HEREWITH.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 30, 2026
    Permit
    Foundation · Propose to perform excavation operations and Propose to install foundation all as per plans filed herewith in conjuction with New Building Application B00967968. No change in use egress or occupancy is proposed under this application
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 30, 2026
    Permit
    General Construction · PROPOSE TO ERECT A NEW TWO STORY METAL FRAME BUILDING CONSTRUCTION CLASS IIB TO HOUSE A WATER TREATMENT FACILITY AND ACCESSORY OFFICE ALL AS PER PLANS FILED HEREWITH.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 29, 2026
    Permit
    Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening. Brick repair as per plans herewith.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 24, 2026
    Permit
    Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of minipiles.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 21, 2026
    Permit
    General Construction · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening. Install new sister wood joist spanning from foundation wall to intermediate beam as shown on plans herewith.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 13, 2026
    Permit
    Foundation · Propose perfom concrete work including stair, retaining wall, on site concrete paving and curbs all per plans filed herewith and in conjuction with NB B00967968-I1. No change in use egress or occupancy is proposed under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 13, 2026
    Permit
    General Construction · Propose to perform site improvement per plans filed herewith and in conjuction with NB B00967968-I1. No change in use egress or occupancy is proposed under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 2, 2026
    Permit
    Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 25, 2026
    Permit
    Structural · PROPOSE TO ERECT A NEW TWO STORY METAL FRAME BUILDING CONSTRUCTION CLASS IIB TO HOUSE A WATER TREATMENT FACILITY AND ACCESSORY OFFICE ALL AS PER PLANS FILED HEREWITH.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jun 1, 2026
    Permit
    Construction Fence · FILING FOR TEMPORARY CONSTRUCTION FENCE FOR CONTRUCTION PHASE ONLY. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 6, 2026
    Permit
    Mechanical Systems · Propose to modify mechanical system as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 6, 2026
    Permit
    Structural · Propose to install new floor for equipment above existing 1st floor, stair and non bearing partitions as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 23, 2026
    Permit
    General Construction · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder. Existing vault to be covered.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Feb 11, 2026
    Permit
    Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 20, 2026
    Permit
    Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder. Existing vault to be covered.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jan 15, 2026
    Permit
    General Construction · Propose to install new floor for equipment above existing 1st floor, stair and non bearing partitions as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)