General Construction · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection. Install new reinforced concrete footings with new steel post between the cellar slab and first floor wood joist. Repoint joists and repair bricks on facade.
General Construction · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening/protection. Install new reinforced concrete footings with new steel post between the cellar slab and first floor wood joist. Repoint joists and repair bricks on facade.
No product keyword matched · NYC DOB building permits
Structural · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening by installing new steel post between cellar and first floor. Facade to be repaired as per plans herewith.
No product keyword matched · NYC DOB building permits
Structural · SECOND ave SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration & vault rem, rep. of existing entrance with new reinforced concrete walls, & slab for new cellar hatch with vertical ladder. Repair of deteriorated bricks & repointing on facade
No product keyword matched · NYC DOB building permits
General Construction · PROPOSE TO ERECT A NEW TWO STORY METAL FRAME BUILDING CONSTRUCTION CLASS IIB TO HOUSE A WATER TREATMENT FACILITY AND ACCESSORY OFFICE ALL AS PER PLANS FILED HEREWITH.
No product keyword matched · NYC DOB building permits
Foundation · Propose to perform excavation operations and Propose to install foundation all as per plans filed herewith in conjuction with New Building Application B00967968. No change in use egress or occupancy is proposed under this application
No product keyword matched · NYC DOB building permits
General Construction · PROPOSE TO ERECT A NEW TWO STORY METAL FRAME BUILDING CONSTRUCTION CLASS IIB TO HOUSE A WATER TREATMENT FACILITY AND ACCESSORY OFFICE ALL AS PER PLANS FILED HEREWITH.
No product keyword matched · NYC DOB building permits
Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building underpinning. Repair and strengthen existing foundation walls and columns, with inclusion of minipiles.
No product keyword matched · NYC DOB building permits
General Construction · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo building strengthening. Install new sister wood joist spanning from foundation wall to intermediate beam as shown on plans herewith.
No product keyword matched · NYC DOB building permits
Foundation · Propose perfom concrete work including stair, retaining wall, on site concrete paving and curbs all per plans filed herewith and in conjuction with NB B00967968-I1. No change in use egress or occupancy is proposed under this application.
No product keyword matched · NYC DOB building permits
General Construction · Propose to perform site improvement per plans filed herewith and in conjuction with NB B00967968-I1. No change in use egress or occupancy is proposed under this application.
No product keyword matched · NYC DOB building permits
Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo underpinning work on property. Including but not limited to repair/strengthen of existing foundation walls and columns.
No product keyword matched · NYC DOB building permits
Structural · PROPOSE TO ERECT A NEW TWO STORY METAL FRAME BUILDING CONSTRUCTION CLASS IIB TO HOUSE A WATER TREATMENT FACILITY AND ACCESSORY OFFICE ALL AS PER PLANS FILED HEREWITH.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Propose to modify mechanical system as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
No product keyword matched · NYC DOB building permits
Structural · Propose to install new floor for equipment above existing 1st floor, stair and non bearing partitions as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
No product keyword matched · NYC DOB building permits
General Construction · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder. Existing vault to be covered.
No product keyword matched · NYC DOB building permits
Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder.
No product keyword matched · NYC DOB building permits
Foundation · SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo vault removal & cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder. Existing vault to be covered.
No product keyword matched · NYC DOB building permits
General Construction · Propose to install new floor for equipment above existing 1st floor, stair and non bearing partitions as per plans filed herewith. No change in use egress or occupancy is proposed under this application.
No product keyword matched · NYC DOB building permits