Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 54SAA LLC NYC DOB building permits | 10 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 2 | Sep 15, 2026 |
| B | 136-76 39 AVE LLC |
| 10 |
Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched |
| 1 |
| Sep 15, 2026 |
| B | AMN PLUMBING CORP NYC DOB building permits | 10 | Plumbing · Add cafe bar sinknand dishwasher and faucet. No product keyword matched | 2 | Sep 15, 2026 |
| B | SEDGWICK AVENUE HOLDING LLC NYC DOB building permits | 10 | General Construction · Application filed to erect a 3-story single dwelling building. Please assign same examiner to 3111, 3113, 3115, 3117, 3119, 3121 and 3123 Henry Hudson Parkway West. X01173147-I1, X01173155-I1, X01173166-I1, X01173176-I1, X01173179-I1, X01173188-I1 No product keyword matched | 21 | Sep 15, 2026 |
| B | AIRCON HTNG & COOLING COR NYC DOB building permits | 10 | Mechanical Systems · FILING HEREWITH MECHANICAL WORK FOR APARTMENT RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Sep 15, 2026 |
| B | ERGO DEVELOPMENT & MGMN'T NYC DOB building permits | 10 | General Construction · Interior renovation of existing UG-6 Eating and Drinking Establishment. No change to use egress or occupancy. No product keyword matched | 1 | Sep 15, 2026 |
| B | WZ CONSULTING CORP NYC DOB building permits | 10 | Mechanical Systems · Installation of new HVAc split system No product keyword matched | 5 | Sep 15, 2026 |
| B | AMCON CONTRACTING CORP NYC DOB building permits | 10 | Structural · Propose Structural Work in conjunction with NB # 420667059. No product keyword matched | 2 | Sep 15, 2026 |
| B | SUNNY BAY LLC NYC DOB building permits | 10 | General Construction · THREE STORY HORIZONTAL REAR EXTENSION. ADDITION OF 4TH FLOOR ROOFTOP & BULKHEAD. INTERIOR RENO OF ENTIRE BUILDING. CHANGE OF USE APPLICATION. REQUESTING NEW CO. No product keyword matched | 2 | Sep 15, 2026 |
| B | CONSTRUCTION GURU CORP NYC DOB building permits | 10 | General Construction · In Unit 16A on Floor 16, removal and installation of non-load bearing partitions as shown on plans. all plumbing work filed under separate LAA application. no change to egress, use or occupancy. No product keyword matched | 1 | Sep 15, 2026 |
| B | QUINTUNA SERVICE CORP NYC DOB building permits | 10 | General Construction · ALTERATIONS TO SPLIT APARTMENT #C3. SCOPE INCLUDES MINOR DEMOLITION WORK TO NON-LOAD BEARING PARTITIONS, NEW NON-LOAD BEARING PARTITIONS, NEW FINISHES, & FIRE ESCAPE EXTENSION. OBTAIN NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Sep 15, 2026 |
| B | DEM Realty LLC NYC DOB building permits | 10 | General Construction · Int. and ext. renovation of exist. two family residence in cellar, basement, first, second, roof and exterior. Remove and replace existing stair inkind with new. Renovate facade, new windows, doors, int. partitions and finishes. No change in bulk or use No product keyword matched | 2 | Sep 15, 2026 |
| B | ICL NYC DOB building permits | 10 | Sprinklers · Sprinkler/standpipe work in conjunction with NB #321592763. No product keyword matched | 2 | Sep 15, 2026 |
| B | RED ROCK OUTDOOR NYC DOB building permits | 10 | Structural · STRUCTURAL WORK APPLICATION FOR PROPOSED ADVERTISING ROOFTOP SIGN (20' x 20'). No product keyword matched | 8 | Sep 15, 2026 |
| B | MOTT CENTER LLC NYC DOB building permits | 10 | Plumbing · File plumbing PAA application to reflect the site as-built condition. No product keyword matched | 1 | Sep 15, 2026 |
| B | EURO T.I. INC NYC DOB building permits | 10 | General Construction · PROPOSED RENOVATION OF EXISTING BATHROOM AND KITCHEN. REPLACEMENT OF KITCHEN CABINETS AND FINISHES IN BATHROOM IN UNITS 2R AND 2F ON SECOND FLOOR.PLUMBING WORK TO BE FILED UNDER LAA No product keyword matched | 1 | Sep 15, 2026 |
| B | MAGIC MECHANICAL INC Austin issued construction permits, NYC DOB building permits | 10 | Plumbing Permit · retroactive permit application for the emergency replacement of two (2) existing 100-gallon commercial water heaters serving the apartment building.
At the time of the original service call the existing water heaters were actively leaking and the building had been without hot water for approximately seven business days. Due to the active leaks and lack of domestic hot water to the building the condition was classified as an emergency and replacement work proceeded immediately.
Magic Plumbing ATX sourced and replaced both existing 100-gallon water heaters and replaced/repaired associated damaged piping and components within the mechanical room as required to complete the installation and restore hot water service.
During the work extremely heavy scale/mineral buildup was observed on the hot-water side of the existing system and piping.
This application is being submitted retroactively to permit and inspect the completed emergency water-heater replacement work. No product keyword matched | 1 | Sep 15, 2026 |
| B | 801 REALTY LLC NYC DOB building permits | 10 | Plumbing · PLUMBING WORK AT CELLAR , FIRST, AND SECOND FLOORS OF AN EXISTING 4 STORY WITH CELLAR BUILDING No product keyword matched | 1 | Sep 15, 2026 |
| B | TURF COMPANY NYC DOB building permits | 10 | Suspended Scaffold · INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS. No product keyword matched | 2 | Sep 15, 2026 |
| B | Nouveau Property Management Corp. NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Sep 15, 2026 |
| B | NYC DEPARTMENT OF DESIGN + CONSTRUC NYC DOB building permits | 10 | Full Demolition · NYC DDC/DOT project for full demos of 6 existing structures. No product keyword matched | 1 | Sep 15, 2026 |
| B | 1659 RICHMOND AVE LLLC NYC DOB building permits | 10 | Plumbing · PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FOR ADDITION OF NEW BATHROOMS, ADD POINT OF USE WH, REMOVE 1/2 BATHROOM & SINKS. No product keyword matched | 1 | Sep 15, 2026 |
| B | KNOCKOUT RENOVATIONS SVCS NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF EXISTING KITCHENS PER PLANS FOR APT. THA. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 15, 2026 |
| B | Union Street Property Owner NYC DOB building permits | 10 | General Construction · INTERIOR REMOVAL OF CEILING TO BE REPLACED IN KIND No product keyword matched | 12 | Sep 15, 2026 |
| B | LIBERTY MECHANICAL CONT NYC DOB building permits | 10 | General Construction · Install open framed pallet racking into existing warehouse No product keyword matched | 1 | Sep 15, 2026 |
| B | 4331 161 ST LLC NYC DOB building permits | 10 | General Construction · RENOVATION OF EXISTING GARAGE AT REAR YARD. NO CHANGE IN USE, OCCUPANCY OR EGRESS No product keyword matched | 2 | Sep 15, 2026 |
| B | CATHAY BANK NYC DOB building permits | 10 | Plumbing · Replacing condensate piping, adding new standpipe connection for condensate discarge from HVAC unit(s). No product keyword matched | 1 | Sep 15, 2026 |
| B | A-MAC OF NEW YORK CONSTRU NYC DOB building permits | 10 | General Construction · APPLICATION FILED TO OBTAIN SIGN-OFF FOR ALL WORK SUPERSEDES ALL WORK FILED UNDER ALT-2 PERMITTED APPLICATION 320518016 No product keyword matched | 1 | Sep 15, 2026 |
| B | FLOW-RIGHT PLUMBING & HEATING CORP. NYC DOB building permits | 10 | General Construction · LEGALIZATION OF THE PREVIOUSLY REMOVED BUILDING SIGNS LOCATED ON 17-19 CORSON AVENUE AND 237 DANIEL LOW TERRACE. No product keyword matched | 1 | Sep 15, 2026 |
| B | GLOBAL MC INC NYC DOB building permits | 10 | Sprinklers · INSTALLATION OF SPRINKLER SYSTEM AS PER NFPA13R-2016(APPX.Q). No product keyword matched | 3 | Sep 15, 2026 |
| B | BNYDC NYC DOB building permits | 10 | Sprinklers · SPRINKLER WORK FILED IN CONJUCTION WITH RENOVATION OF 2-FAMILY RESIDENCE. FULLY SPRINKLER THE BUILDING. INSTALL PL-SPRINKLER WATER SERVICE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 15, 2026 |
| B | BON PROFIT HOLDINGS LLC NYC DOB building permits | 10 | Sidewalk Shed · Installation of sidewalk shed as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupancy. No product keyword matched | 1 | Sep 15, 2026 |
| B | Sapphire Investors LLC NYC DOB building permits | 10 | General Construction · PROPOSED FOUR (4) STORY RESIDENTIAL BUILDING. No product keyword matched | 1 | Sep 15, 2026 |
| B | MM NYC DOB building permits | 10 | Antenna · Modification of existing Verizon site. Install 3 new antennas, replace 3 antennas and replace 6 RRH units on the roof. No product keyword matched | 2 | Sep 15, 2026 |
| B | BARR & BARR, INC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF PLYWOOD CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 1 | Sep 15, 2026 |
| B | TJS NY INC NYC DOB building permits | 10 | Structural · ALT-1 FILED FOR THE CONVERSION OF AN AUTO REPAIR SHOP TO A CONVENIENCE STORE (C-STORE) WITH INTERIOR RENOVATION AND NEW FRONT DOOR AND WINDOW, INCLUDING RENEWAL OF BSA TERMS AND ISSUANCE OF A NEW CERTIFICATE OF OCCUPANCY. No product keyword matched | 2 | Sep 15, 2026 |
| B | NIKA CONTRACTING GROUP CO NYC DOB building permits | 10 | General Construction · Interior renovation of existing apt#2c on the 2nd Floor, Architectural/ construction work only. No product keyword matched | 1 | Sep 15, 2026 |
| B | Circa Domini International NYC DOB building permits | 10 | General Construction · Existing retail store to new restaurant. No product keyword matched | 1 | Sep 15, 2026 |
| B | J.F. HUGHES BUILDERS INC NYC DOB building permits | 10 | General Construction · Renovation of existing apartment No product keyword matched | 2 | Sep 15, 2026 |
| B | SUMMIT INTERIORS, INC NYC DOB building permits | 10 | Mechanical Systems · Mechanical work as shown on plans filed herewith. No product keyword matched | 3 | Sep 15, 2026 |
| B | BEN'S HOME IMPROVEMENT IN NYC DOB building permits | 10 | Construction Fence · Herewith filed to erect temporary construction plywood fence no change to use, occupancy or egress. No product keyword matched | 2 | Sep 15, 2026 |
| B | Park Avenue Synagogue NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 2 | Sep 15, 2026 |
| B | NYC DEPARTMENT OF CORRECTION NYC DOB building permits | 10 | General Construction · General construction alterations on the 1st floor & roof for proposed renovation of Dormitory 4A; related work as per plans. No proposed change in building use, egress, or occupancy. No product keyword matched | 1 | Sep 15, 2026 |
| B | MINNIS SHABU SHABU INC NYC DOB building permits | 10 | Supported Scaffold · INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 15, 2026 |
| B | RAPOPORT CONSTRUCTION CORP. NYC DOB building permits | 10 | Antenna · Modification to existing T-Mobile site. Replace 6 antennas and remove 3 antennas and install 3 RRU'S on the roof. Remove 1 existing steel platform and 3 cabinets. Install 1 new steel platform and 2 cabinets on roof. No product keyword matched | 1 | Sep 15, 2026 |
| B | 33 RECTOR STREET CONDOMINIUM NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION OF COMMERCIAL OFFICE ON THE 14TH FLOOR. REMOVE PARTITIONS, PATCH AND REPAIR WALLS, FLOORS AND CEILING. REMOVE AND REPAIR HVAC BRANCH DUCT WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Sep 15, 2026 |
| B | ALLCAN CORP NYC DOB building permits | 10 | General Construction · Interior renovation. No change to use, egress or occupancy. No product keyword matched | 1 | Sep 15, 2026 |
| B | TORRES & BUILDERS GROUP NYC DOB building permits | 10 | General Construction · THIS IS AN ADMINISTRATIVE-ONLY FILING, TO SUPERSEDE PREVIOUSLY-PERMITTED WORK UNDER APPL. #320755937 FROM 2013, WHICH WAS NEVER SIGNED OFF. WORK IN UNIT 2, 1ST AND 2ND FLOORS, NO CHANGE TO EGRESS, USE, OR OCC. No product keyword matched | 1 | Sep 15, 2026 |
| B | Year NYC DOB building permits | 10 | Solar · ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Sep 15, 2026 |
| B | Baitong Corp NYC DOB building permits | 10 | Construction Fence · THIS JOB IS FILED FOR CONSTRUCTION FENCE FOR CONSTRUCTION WORK AT 456 9 AVE, MANHATTAN, NY 10018. DOB JOB#M01414230-I1 No product keyword matched | 1 | Sep 15, 2026 |