Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | MIDNIGHT EXPRESS MECH CRP NYC DOB building permits | 10 | Sprinklers · Sprinkler modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy No product keyword matched | 1 | Sep 16, 2026 |
| B | ALL-BORO REHAB CONST CORP NYC DOB building permits |
| 10 |
Plumbing · Installation of sprinkler system in conjunction with application Q00959096. No product keyword matched |
| 1 |
| Sep 16, 2026 |
| B | 812-816 Broadway, LLC NYC DOB building permits | 10 | Mechanical Systems · Installation of Kitchen Exhaust Fan, Kitchen Exhaust Hood and associated ductwork as required. No product keyword matched | 1 | Sep 16, 2026 |
| B | FIVE STAR AWNINGS INC NYC DOB building permits | 10 | General Construction · THREE NON-ILLUMINATED NON-ADVERTISING ACCESSORY RETRACTABLE AWNINGS APPROVED BY NYC LANDMARK PRESERVATION COMMISSION APPROVAL MISC-27-01857 - PIES -N- THIGHS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 16, 2026 |
| B | 152 MESEROLE AVE LLC NYC DOB building permits | 10 | Mechanical Systems · FILING FOR MECHANICAL SYSTEM IN CONJUNCTION WITH NEW BUILDING. AT 152 MESEROLE AVENUE. No product keyword matched | 2 | Sep 16, 2026 |
| B | NACCARATO CONTRACTING INC NYC DOB building permits | 10 | Structural · ADDRESS VIOLATION 39178440P No product keyword matched | 1 | Sep 16, 2026 |
| B | PRO-H DEVELOPMENT INC NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 3 | Sep 16, 2026 |
| B | ACAN Development LLC NYC DOB building permits | 10 | Sidewalk Shed · This filing is for the installation of temporary sidewalk shed No product keyword matched | 1 | Sep 16, 2026 |
| B | URBAN STANDARD GENERAL CO NYC DOB building permits | 10 | General Construction · MINOR INTERIOR PARTITION REMOVALS AND CONSTRUCTION IN CONJUNCTION WITH RENOVATION OF APR #5. RENOVATE BATHROON + KITC HEN AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Sep 16, 2026 |
| B | 5 BORO BOARDING INC NYC DOB building permits | 10 | General Construction · APPLICATION IS FILED FOR THE INTERIOR RESTORATION OF AN EXISTING FOUR-STORY RESIDENTIAL BUILDING (UNIT 4B) DUE TO FIRE DAMAGE. ALL WORK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION. NO NEW CO. No product keyword matched | 5 | Sep 16, 2026 |
| B | 120 WOOSTER LLC NYC DOB building permits | 10 | General Construction · INTERIOR RENOVATION FOR OFFICE FIT-OUT No product keyword matched | 1 | Sep 16, 2026 |
| B | STRATEGIC HOTELS AND RESORTS NYC DOB building permits | 10 | Sprinklers · Sprinkler work as shown on plans for three specialty Hotel suites on 15th, 25th and 31st construction floors (Marketing floors 16th, 26th and 32nd floor) No product keyword matched | 2 | Sep 16, 2026 |
| B | EGNATIA CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · APARTMENT RENOVATION TO INCLUDE: REMOVAL OF EXISTING PARTITIONS, NEW PARTITIONS, RENOVATION OF EXIST. KITCHEN.NEW WASHER AND DRYER MACHINE. No product keyword matched | 1 | Sep 16, 2026 |
| B | U S STAR CONSTRUCTION NY CORP NYC DOB building permits | 10 | General Construction · 1. REPLACE THE EXIS BRICK AT EXPOSURE# 2=100PCS 2. REPAIR THE EXIS WINDOW LINTEL=5 PCS3. REPLACE THE EXIIST CRACK CONCRETE SILL= 1 PCS 4. REP THE EXIS CAMELBACK COPING=1PC 5. BRICK RE-POINTING=200 SF 6.DOOR LINTEL REPAIR=01 PC.7.ADDRESS ECB VIO#39191790L No product keyword matched | 2 | Sep 16, 2026 |
| B | CHURCH NYC DOB building permits | 10 | General Construction · FILING TO REMOVE WOOD FRAMED REAR ENLARGEMENT AT FIRST FLOOR REAR AND RESTORE TO PRIOR CONDITION AND TO RESOLVE ECB VIOLATION #039172300X No product keyword matched | 1 | Sep 16, 2026 |
| B | TENEMENT MUSEUM NYC DOB building permits | 10 | Mechanical Systems · Herewith filing installation of mechanical equipment as per plans submitted. No change to use, egress or occupancy under this application. No product keyword matched | 1 | Sep 16, 2026 |
| B | METROPOLITAN COMMUNITY UNITED METHO NYC DOB building permits | 10 | Protection and Mechanical Methods · Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 2 | Sep 16, 2026 |
| B | ACUSPI NO.1 LTD NYC DOB building permits | 10 | General Construction · Interior Renovation of the 4th floor of an existing two family home. No change to use, occupancy or egress. No product keyword matched | 1 | Sep 16, 2026 |
| B | QPR LLC NYC DOB building permits | 10 | Foundation · Lowering of existing cellar elevation via concrete benching to achieve 90 ceilings. this will also include the removal of the existing masonry archway which will require the installation new framing at the first floor framing elevation No product keyword matched | 1 | Sep 16, 2026 |
| B | Cakao Food Corp NYC DOB building permits | 10 | Mechanical Systems · Renovation of existing commercial space to install hood system and ductwork system, etc. No change of use, egress or occupancy. No product keyword matched | 1 | Sep 16, 2026 |
| B | WMC ASSOCIATES LLC NYC DOB building permits | 10 | General Construction · Parapet replacement as per plans filed herewith. No change to use, egress or occupancy No product keyword matched | 2 | Sep 16, 2026 |
| B | CNB CONTRACTING CORP NYC DOB building permits | 10 | General Construction · Installation of electric vehicle charging stations with related supercharger cabinets, bollards, concrete pads and light poles on grade as per plans. No change to occupancy, use, or egress. No product keyword matched | 1 | Sep 16, 2026 |
| B | BAROLLI PLMNG AND HTG INC NYC DOB building permits | 10 | Plumbing · New boiler and hot water heater, gas stove and gas stove removal, gas piping. Temporary HWH. No product keyword matched | 2 | Sep 16, 2026 |
| B | Miro Real Estate NYC DOB building permits | 10 | Sidewalk Shed · HEAVY DUTY SIDEWALK SHED DURING FACADE REPAIRS FILED UNDER APPLICATION # M01357004. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 16, 2026 |
| B | ENTERPRISE ASSET MANAGEMENT, INC NYC DOB building permits | 10 | Plumbing · M834-High School for Environmental Studies: Interior conversion of an existing classroom with two closets to a culinary arts classroom with two storage rooms. No product keyword matched | 2 | Sep 16, 2026 |
| B | AL&I 1944 LLC NYC DOB building permits | 10 | Plumbing · plumbing work No product keyword matched | 1 | Sep 16, 2026 |
| B | MHS CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · wall repair for accessory shed as shown on plans No product keyword matched | 2 | Sep 16, 2026 |
| B | S & S GENERAL CONSTR INC NYC DOB building permits | 10 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 16, 2026 |
| B | CONCEPT FINE INTERIOR INC NYC DOB building permits | 10 | General Construction · Filing for renovation of second floor space only, including some gypsum board work for new partitions and new finishes for bathrooms. MS work for bathroom exhausts. Pl under subsequent filing. No change to use,egress or occupancy. No product keyword matched | 1 | Sep 16, 2026 |
| B | AZI CONSTRUCTION CORP NYC DOB building permits | 10 | General Construction · FACADE RESTORATION TO ADDRESS DOB AND ECB VIOLATIONS, NO CHANGE IN BULK UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 16, 2026 |
| B | SAKAB DESIGN INC NYC DOB building permits | 10 | General Construction · FILING FOR HORIZONTAL EXTENSION AT THE REAR OF AN EXISTING STRUCTURE ON ENLARGED LOT No product keyword matched | 2 | Sep 16, 2026 |
| B | GREEN NYC DOB building permits | 10 | Structural · Complete renovation of an existing two-car masonry garage, including structural upgrades, new doors and windows, flooring, and interior finishes. This work addresses DOB violations #39167334H, #39167333X, #39069426X, and #39069425Y No product keyword matched | 1 | Sep 16, 2026 |
| B | 3rd & 87 LP NYC DOB building permits | 10 | General Construction · Filing to remove exterior masonry to create opening, install new lintel and louver in new opening, Install new window in existing opening. No change to occupancy, use or egress. No product keyword matched | 2 | Sep 16, 2026 |
| B | RANCO MANAGEMENT LLC NYC DOB building permits | 10 | General Construction · INSTALL STOREFRONT AWNING WITH NON-ILLUMINATED COPY READING AFTERGLOW. COPY NOT TO EXCEED 12 SQ FT TOTAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 3 | Sep 16, 2026 |
| B | 25-30 COLUMBIA HEIGHTS (BROOKLYN), NYC DOB building permits | 10 | General Construction · Interior demolition, construction of interior partitions and installation of doors and frames as shown. No change to use, egress, or occupancy No product keyword matched | 1 | Sep 16, 2026 |
| B | ST. LUKE IN THE FIELDS NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 16, 2026 |
| B | M.M CONSTRUCTION & BUILDE NYC DOB building permits | 10 | General Construction · APPLICATION FILE TO EXTERIOR BROWNSTONE STOOP REPAIR AS PER PLAN. NO CHAGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 16, 2026 |
| B | MAXIM DESIGN BUILD LLC NYC DOB building permits | 10 | General Construction · HEREBY FILING FOR THE RENOVATION OF UNIT 10H. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 16, 2026 |
| B | CITY/SUBURBAN PLBG CORP NYC DOB building permits | 10 | Plumbing · This alteration is being filed for the plumbing work at the subject premises as per plans submitted herewith. There are no change in use, egress or occupancy. No product keyword matched | 1 | Sep 16, 2026 |
| B | 205 East Property Manager LLC NYC DOB building permits | 10 | Supported Scaffold · PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 16, 2026 |
| B | EBDB Holding LLC NYC DOB building permits | 10 | Foundation · FOUNDATION WORK FOR THE PROPOSED VERTICAL AND HORIZONTAL EXTENSION. No product keyword matched | 2 | Sep 16, 2026 |
| B | TRICE CONSTRUCTION INC NYC DOB building permits | 10 | Supported Scaffold · INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. No product keyword matched | 1 | Sep 16, 2026 |
| B | URBAN REALTY PARTNERS LLC NYC DOB building permits | 10 | Construction Fence · INSTALL TEMPORARY 8' HIGH CONSTRUCTION FENCE No product keyword matched | 1 | Sep 16, 2026 |
| B | NATIONAL RESTAURANTS MANAGEMENT INC NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION AND STOREFRONT WORK IN EXISTING EATING OR DRINKING EST WITH COMMERCIAL KITCHEN AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. M01196627 (FN), M01196632 (MS), M01196633 (PL), M01196634 (SP), & FDNY ANSUL SYSTEM FILED SEPARATELY. No product keyword matched | 2 | Sep 16, 2026 |
| B | HD MANAGEMENT LLC NYC DOB building permits | 10 | General Construction · FILED HEREWITH ALT I FOR CHANGE OF USE AND INTERIOR BUILD OUT OF NEW DAYCARE FACILITY ON THE FIRST FLOOR. No product keyword matched | 2 | Sep 16, 2026 |
| B | DELPHI CONSTRUCTION CORP NYC DOB building permits | 10 | Mechanical Systems · Replacement of existing HVAC Unit for ground floor commercial space. No change to use egress or occupancy under this application. No product keyword matched | 2 | Sep 16, 2026 |
| B | Arkadum-98 Enterprises Corp NYC DOB building permits | 10 | Plumbing · GAS RE-CONNECTION FOR DIRECT REPLACEMENT OF PACKAGE ROOFTOP UNIT. No product keyword matched | 3 | Sep 16, 2026 |
| B | Stonecrest NYC DOB building permits | 10 | Construction Fence · FILING FOR FENCE APPLICATION, INSTALLATION OF 8'-0 PLYWOOD CONSTRUCTION FENCE No product keyword matched | 2 | Sep 16, 2026 |
| B | PROFESSIONAL INTERIOR CON NYC DOB building permits | 10 | General Construction · Full reno of ex apt, including kitchen, laundry, bedrooms, bathrooms, and interior finishes. Removal and replacement of partitions, doors, cabinetry, fixtures, and finishes as part of apartment reconfiguration. No change in use, egress, or occupancy. No product keyword matched | 3 | Sep 16, 2026 |
| B | 419-421 WEST BROADWAY REALTY CORP/A NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection No product keyword matched | 3 | Sep 16, 2026 |