Foundation · Lowering of existing cellar elevation via concrete benching to achieve 90 ceilings. this will also include the removal of the existing masonry archway which will require the installation new framing at the first floor framing elevation
Foundation · Lowering of existing cellar elevation via concrete benching to achieve 90 ceilings. this will also include the removal of the existing masonry archway which will require the installation new framing at the first floor framing elevation
No product keyword matched · NYC DOB building permits
Mechanical Systems · MECHANICAL WORK, NEW SPLIT TYPE HEAT PUMP AC WITH NEW AIR HANDLING UNITS. NEW BATHROOM VENTILATION AND DRYER EXHAUST. INSULATED REFREIGERANT PIPING, SHEETMETAL DUCKWORK , AIR OUTLETS AS PER PLANS.
No product keyword matched · NYC DOB building permits
Structural · Lowering of existing cellar elevation via concrete benching to achieve 90 ceilings. this will also include the removal of the existing masonry archway which will require the installation new framing at the first floor framing elevation
No product keyword matched · NYC DOB building permits
General Construction · GENERAL CONSTRUCTION WORK, INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. NO CHNAGE IN USE, EGRESS OR OCCUPANCY. MECHANICAL AND PLUMBING WORK TO BE FILED AS SUBSEQUENT FILING.
No product keyword matched · NYC DOB building permits