Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | KAPNAG HEATING & PLBG COR NYC DOB building permits | 10 | Sprinklers · INSTALL NEW SPRINKLER HEADS AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Sep 28, 2026 |
| B | THE EPISCOPAL CHURCH OF GRACE AND R NYC DOB building permits |
| 10 |
General Construction · Construct an ADA ramp from the sidewalk to the cellar in the Open Space No product keyword matched |
| 1 |
| Sep 28, 2026 |
| B | OBCM, LLC NYC DOB building permits | 10 | Suspended Scaffold · Suspended Scaffold outrigger installation for Facade restoration and inspections No product keyword matched | 1 | Sep 28, 2026 |
| B | Los Platanitos Grocery Deli Corp NYC DOB building permits | 10 | Mechanical Systems · APPLICATION FILED TO INSTALL KITCHEN EXHAUST SYSTEM (HOOD,DUCTWORK, AND EXHAUST FAN) FOR KITCHEN SPACE IN THE FIRST FLOORAS PER PLANS. FIRE SUPPRESSION SYSTEM FILED SEPARATELY WITH THEFDNY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY No product keyword matched | 1 | Sep 28, 2026 |
| B | FOREVIEW MEP SERVICE LLC NYC DOB building permits | 10 | Sprinklers · FILING PLUMBING MODIFICATIONS AS PER PLANS. INSTALLATIN OF NEW SPRINKLER SYSTEM. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 28, 2026 |
| B | SIONY NYC DOB building permits | 10 | Mechanical Systems · FILING FOR THE EXISTING TYPE 1 COMMERCIAL KITCHEN HOOD, EXHAUST FAN AND ASSOCIATED DUCT WORK AS PER PLAN SHOWS. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 28, 2026 |
| B | HALCYON CONSTRUCTION MGM NYC DOB building permits | 10 | Construction Fence · Proposed fence at 253 E 61 Street No product keyword matched | 1 | Sep 28, 2026 |
| B | R.E.W., LLC NYC DOB building permits | 10 | General Construction · Interior removal of nonload bearing paritions, finishes and store fixtures at cellar and first floor, firestopping and egress to be maintained. No change to the use egress or occupancy under this applicaiton. No product keyword matched | 1 | Sep 28, 2026 |
| B | Big Apple Contracting Corp NYC DOB building permits | 10 | Solar · INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Sep 28, 2026 |
| B | RENNOVA CONSTRUCTION INC NYC DOB building permits | 10 | General Construction · CONVERT ONE-FAMILY HOUSE INTO TWO-FAMILY HOUSE. NO ENLARGEMENT IS PROPOSED. ASSOCIATED PLUMBING WORK IS FILED AS JOB B00600518. No product keyword matched | 1 | Sep 28, 2026 |
| B | KING CONSTRUCTION & RESTORATION, IN NYC DOB building permits | 10 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 28, 2026 |
| B | TECHLINE CONSTRUCTION LLC NYC DOB building permits | 10 | Plumbing · plumbing No product keyword matched | 1 | Sep 28, 2026 |
| B | GIA ELECTRICAL CORP NYC DOB electrical permits | 10 | Residential Building: From 1st to 7th floors -remove 36 Federal Pacific electrical panels and install 36 new panels at existing location. Reconnect the existing electrical circuits to the new panels. No product keyword matched | 2 | Sep 28, 2026 |
| B | METRO TECH ELECTRICAL COR NYC DOB electrical permits | 10 | General Wiring Throughout new extension. Service work/Notify Utility company Conversion from 1 to 2 family No product keyword matched | 1 | Sep 28, 2026 |
| B | JRD ELECTRIC CORP. NYC DOB electrical permits | 10 | 20 and 21st Floor Build Out No product keyword matched | 1 | Sep 28, 2026 |
| B | RELLA ELECTRIC LLC NYC DOB electrical permits | 10 | upgrade panel 200 amp service includes new cables, meter pan & utility disconnect No product keyword matched | 2 | Sep 28, 2026 |
| B | DELTA GREEN ELECTRIC INC NYC DOB electrical permits | 10 | install 3 new meters outside with new panels No product keyword matched | 2 | Sep 28, 2026 |
| B | E.T. ELEC'L CONTR CO INC NYC DOB electrical permits | 10 | This permit is being filed to cure OATH/ECB Violation #39184728P. Disconnect and safely remove 2 Countertop Receptacle Outlets back to Panel located in the Kitchen area on the 1st Floor. Installation of 3 new Receptacle Outlets from existing general circuit, 1 new Light Fixture, and 1 new Light Switch on the 1st Floor. No product keyword matched | 6 | Sep 28, 2026 |
| B | PHONG ELECTRIC INC. NYC DOB electrical permits | 10 | Subsequent filing to elevator disconnect wiring. No product keyword matched | 1 | Sep 28, 2026 |
| B | A.M.J ELECTRIC CORP NYC DOB electrical permits | 10 | Install Receptacles No product keyword matched | 2 | Sep 28, 2026 |
| B | PEAK ELECTRIC LLC NYC DOB electrical permits, Seattle electrical permits | 10 | REMOVE KNOB & TUB IN OPEN AREAS, SERVICE PANEL UPGRADE, ADD OUTLETS AND SWITCHES, FLOOR HEAT CURCUIT, INSTALL 8 NEW CIRCUITS · Electrical No product keyword matched | 3 | Sep 28, 2026 |
| B | MANHATTAN SUFFOLK ELECT NYC DOB electrical permits | 10 | This permit is to clear abandoned permit # M012222 No product keyword matched | 2 | Sep 28, 2026 |
| B | POWER UP NYC ELECTRIC COR NYC DOB electrical permits | 10 | Relocate 2 existing light poles No product keyword matched | 2 | Sep 28, 2026 |
| B | CORNELL UNIVERSITY NYC DOB electrical permits | 10 | Basement service work -installed disconnect switch for telecom equipment No product keyword matched | 4 | Sep 28, 2026 |
| B | C&C ELECTRICAL SERVICES I NYC DOB electrical permits | 10 | Install power for new HVAC equipment. First floor, second floor, roof No product keyword matched | 1 | Sep 28, 2026 |
| B | R.A. PHILLIPS ELEC'L CONT NYC DOB electrical permits | 10 | General wiring relocated 3 Panels on the first floor No product keyword matched | 4 | Sep 27, 2026 |
| B | JOHN PASTORE NYC DOB electrical permits | 10 | change existing fuse panel to circuit breakers No product keyword matched | 2 | Sep 26, 2026 |
| B | SABET DEVELOPMENT CORP NYC DOB building permits | 10 | Plumbing · PLUMBING WORKS @ PARTIAL 1ST.2ND., & 4TH. FLOOR (APTS.#1C,2F,4B&4G) IN AN EXISTING 6 STORY W/ CELLAR BUILDING. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 2 | Sep 25, 2026 |
| B | WALI CONSTRUCTION INC NYC DOB building permits | 10 | Mechanical Systems · FILED HEREWITH FOR MECHANICAL WORK TYPE FOR EXISTING GONGCHA REMODEL IN CONJUNCTION TO M01401259-I1. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Sep 25, 2026 |
| B | 1298 INWOOD DEVELOPERS NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF SIDEWALK SHED AND CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 1 | Sep 25, 2026 |
| B | GREEN CITY BOX TRANS INC NYC DOB building permits | 10 | General Construction · APPLICATION IS FILED FOR INTERIOR ALTERATION TO EXISTING APARTMENT ON THE 4TH FLOOR. WORK INCLUDES REMOVAL AND REPLACEMENT OF INTERIOR FINISHES AND PARTITIONS ALTERATION OF BATHROOM FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Sep 25, 2026 |
| B | TRINITY HUDSON HOLDINGS NYC DOB building permits | 10 | Structural · MINOR STRUCTURAL WORK AS PER PLANS No product keyword matched | 6 | Sep 25, 2026 |
| B | UDR, INC. NYC DOB building permits | 10 | General Construction · EXTERIOR FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Sep 25, 2026 |
| B | ALLTECH PLUMBING LLC NYC DOB building permits | 10 | Plumbing · PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 3 | Sep 25, 2026 |
| B | HUDSON RIVER PARK TRUST NYC DOB building permits | 10 | General Construction · Install of temp tents, platforms, scenic walls, trussing, no alt to exist structures for annual Eatscon. A TPA is req'd. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event completion No product keyword matched | 2 | Sep 25, 2026 |
| B | VERNON CONSTR & DEV LLC NYC DOB building permits | 10 | Mechanical Systems · KINGS COUNTY HOSPITAL CENTER - ED EXPANSION - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Sep 25, 2026 |
| B | OAC 550 OWNER LLC NYC DOB building permits | 10 | General Construction · Interior renovations as per plans filed herewith. No change to use, egress or occupancy. No product keyword matched | 2 | Sep 25, 2026 |
| B | ACCRETE CONSTRUCTION GROU NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01171197-I1 No product keyword matched | 2 | Sep 25, 2026 |
| B | JEFFREY MGMT CORP NYC DOB building permits | 10 | Structural · Structural work as shown on plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 7 | Sep 25, 2026 |
| B | ERLAND CONTRACTING, LLC NYC DOB building permits | 10 | General Construction · Existing 4-story and cellar 3-family residential building to be converted to a 1-family dwelling. Work includes scope of work filed under BIS#'s: 340403155 & 340520127 to remove stop work order 3656298 & 3656299. No product keyword matched | 1 | Sep 25, 2026 |
| B | JOSEPH MOEHLENHOFF P&H IN NYC DOB building permits | 10 | Plumbing · herewith filing plumbing work No product keyword matched | 1 | Sep 25, 2026 |
| B | BREEZE NATIONAL INC NYC DOB building permits | 10 | General Construction · Partial Demolition for Chute, runback Platform and Hoist No product keyword matched | 4 | Sep 25, 2026 |
| B | THE HEIGHTS REAL ESTATE COMPANY NYC DOB building permits | 10 | General Construction · FACADE REPAIRS INCLUDING BRICK MASONRY RE-POINTINT/RE-STITCHING, WINDOW LINTEL/SILL REPLACEMENT, PARAPET AND ROOF MEMBRANE REPLACEMENT, AND RESOLVE ECB VIOLATIONS 39194033H, 39194031Y, 35728147Y, ETC. NO CHANGE IN OCCUPANCY, USE OR EGRESS No product keyword matched | 2 | Sep 25, 2026 |
| B | DWIP CORP NYC DOB building permits | 10 | Structural · INTERIOR BATHROOM RENOVATION AND REPAIR BATHROOM FLOOR OF UNIT 1R. NO CHANGES TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Sep 25, 2026 |
| B | CHURCH OF ST LUKE AND ST MATTHEW NYC DOB building permits | 10 | Structural · NEW SPREAD FOOTING, SHEATHING AND BEAMS INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Sep 25, 2026 |
| B | SUPREME GEN.CONTR INC NYC DOB building permits | 10 | Structural · STRUCTURAL WORK FILED IN CONJUNCTION WITH RENOVATION TO EX. ONE-FAMILY. DEMOLISH INTERIOR WALL AT AND PROVIDE REINFORCEMENT IN BASEMENT AND INSTALL NEW BEARING WALL AT FIRST FLOOR. No product keyword matched | 4 | Sep 25, 2026 |
| B | L&Y DEVELOPMENT GROUP INC NYC DOB building permits | 10 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 5 | Sep 25, 2026 |
| B | BROOKLYN GRID NYC DOB building permits | 10 | Structural · PROPOSE STRUCTURAL WROK IN CONJUCTINO WITH NB JOB# X01071030-I1 No product keyword matched | 1 | Sep 25, 2026 |
| B | 1440 OWNER LLC NYC DOB building permits | 10 | General Construction · General construction associated with City Fresh market tenant fit out on a new building. No structural work under this application. No change in occupancy, use or egress under this application. No product keyword matched | 1 | Sep 25, 2026 |
| B | TOTAL BUILDER CONSTRUCTIO NYC DOB building permits | 10 | General Construction · CHANGE OF USE OF ATTIC TO HABITABLE SPACE, RENOVATION OF ATTIC, ADDITION OF DORMERS. No product keyword matched | 3 | Sep 25, 2026 |