Home
Workspace
Klise
Target
Seer
Signals
Competitors
Contacts
Log in
Seer/Prospects/HUDSON RIVER PARK TRUST
Back to prospects

HUDSON RIVER PARK TRUST

Manhattan, MANHATTAN, NY · Outside service region

AnalysisCompany profileContactsEmail draftSources

Analysis

Overall 10 / 20Tier B
Keyword
Seer chat
0 / 5
No keyword-matching signal in the last 90 days.
Freshness4 / 5Latest signal is within 90 days.
Place5 / 5NY matches the seller’s region.
Target fit1 / 5No target company types set; baseline is 1 star.

Company profile

Company
HUDSON RIVER PARK TRUST
Source for Company (opens in new tab)
Signal source
NYC DOB building permits
Signal date
Sep 25, 2026
Source for Signal date (opens in new tab)
Signal count
8 saved signals, 2 in the last 90 days
Signal summary
General Construction · Install of temp tents, platforms, scenic walls, trussing, no alt to exist structures for annual Eatscon. A TPA is req'd. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event completion
Source for Signal summary (opens in new tab)
Address
250 WEST 103RD STREET, 4C
Source for Address (opens in new tab)
Phone
Not found
Email
Not found
Website
Not found
Decision maker
Not found
DM title
Not found

Contacts

No contact found

Phone: not found · See the source record

Log in to search contacts

Email draft

Add a contact before generating a draft.

Sources

8 signals
  • Sep 25, 2026
    Permit
    General Construction · Install of temp tents, platforms, scenic walls, trussing, no alt to exist structures for annual Eatscon. A TPA is req'd. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event completion
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Sep 17, 2026
    Permit
    General Construction · Installation of temp tents and inflatables, no alt to exist structures for Bike MS NYC. TPA required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 7, 2026
    Permit
    Standpipe · Removal and replacement of existing fire standpipe system throughout the Pier 40 building. Provide a class I automatic standpipe system throughout the building interior in accordance with NFPA-14 (2016). All as per plans filed herewith.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Jul 6, 2026
    Permit
    Structural · Concrete, masonry and steel repair on levels 1 and 2 of Pier 40.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • May 21, 2026
    Permit
    General Construction · Install of temp tents, platforms, trussing, no alt to exist structures for Annual Hyrox. A TPA is required. Producer is responsible to monitor site safety & implement HWAP. All prod equipment removed upon event completion
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Mar 31, 2026
    Permit
    General Construction · Installation of temp tents and inflatable structures, no alt to exist structures for Annual Walk MS. TPA permit required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Dec 11, 2025
    Permit
    Sprinklers · HRPT Pier 40: upgrades to 1.1 million sf facility sprinkler system full dry replacement and select wet system replacement (branch lines). All sprinkler heads to be replaced. All as per plans filed herewith.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)
  • Nov 14, 2025
    Permit
    Structural · Concrete, masonry and steel repair on levels 1 and 2 of Pier 40.
    No product keyword matched · NYC DOB building permits
    Source record (opens in new tab)