Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | I.S.M. ELECTRIC, INC. NYC DOB electrical permits | 10 | Remove single phase meter, add a 3 phase bypass, a 3 phase panel, and 3 disconnect switches. No product keyword matched | 2 | Oct 1, 2026 |
| B | MDC SECURITY AND ELEC'L NYC DOB electrical permits |
| 10 |
INSTALL SOLAR PV SYSTEM. DISCONNECT SWITCH, ENPHASE COMBINER BOX , GROUND ROD CONNECTIONS AND BONDS , ALL INTEGRAL WIRING AND BREAKERS No product keyword matched |
| 10 |
| Oct 1, 2026 |
| B | ALL BORO ELECTRIC CORP NYC DOB electrical permits | 10 | Install new circuits, lights, switches, and receptacles @ 2nd floor library No product keyword matched | 2 | Oct 1, 2026 |
| B | INTEGRAL ELECL PWR & CNTR NYC DOB electrical permits | 10 | Temporary 300Amp service No product keyword matched | 2 | Oct 1, 2026 |
| B | RNH ELECTRIC COMPANY INC NYC DOB electrical permits | 10 | Electrical No product keyword matched | 5 | Oct 1, 2026 |
| B | DEFALCO ASSOCIATES, LLC./ NYC DOB electrical permits | 10 | Provide and install one (1) three-wire meter pan with 200A disconnect and new 200A riser. Main electrical panel located in Apartment #7C to be provided and installed by others. No product keyword matched | 1 | Oct 1, 2026 |
| B | CORPORATE ELEC'L CONTR IN NYC DOB electrical permits | 10 | Maintenance on existing service switch #2-4000AMP and service switch #3-6000 AMP. Maintenance will consist of cleaning, torging, mega testing and lubrication as per manufactures specs. A need for a Con Edison SHUTDOWN is required. No product keyword matched | 1 | Oct 1, 2026 |
| B | COLUMBIA UNIVERSITY - MANHATTANVILL NYC DOB building permits | 10 | Sprinklers · MINOR MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM AT COMMERCIAL UNIT C AS PER PLAN. SUBSEQUENT FILING WITH JOB#: M01029916-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IN THIS APPLICATION. No product keyword matched | 11 | Sep 30, 2026 |
| B | ROSE ASSOCIATES NYC DOB building permits | 10 | Sprinklers · Removal of sprinklers and installation of Temporary Core Sprinkler Protection No product keyword matched | 6 | Sep 30, 2026 |
| B | LTM CONSTRUCTION LLC NYC DOB building permits | 10 | General Construction · Interior renovation of commercial space No product keyword matched | 4 | Sep 30, 2026 |
| B | The Abyssinian Baptist Church NYC DOB building permits | 10 | Mechanical Systems · FILING FOR MECHANICAL INTERIOR RENOVATION OF 1ST FLOOR, 4TH FLOOR AND ROOF (1,763 SF), INSTALLATION OF COMMERCIAL COOKING AND HOOD DUCT EXHAUST SYSTEM FOR 1ST FLOOR KITCHEN AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY. No product keyword matched | 2 | Sep 30, 2026 |
| B | BEN-JOSEF GROUP HOLDINGS NYC DOB building permits | 10 | Sprinklers · Sprinkler modifications on subcellar, cellar, 1st and 2nd floors, including removal of existing sprinkler heads/piping and installation of new sprinkler heads and branch piping connected to the existing system. No product keyword matched | 2 | Sep 30, 2026 |
| B | OLSHAN PROPERTIES NYC DOB building permits | 10 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 7 | Sep 30, 2026 |
| B | MONADNOCK CONSTRUCTION IN NYC DOB building permits | 10 | Structural · Structural work in conjunction with NB # M01128646 No product keyword matched | 5 | Sep 30, 2026 |
| B | BROOKLYN MECH WORKS CORP NYC DOB building permits | 10 | Plumbing · HEREWITH FILING PLUMBING WORK IN CONJUNCTION WITH APPLICATION # B00516643 No product keyword matched | 3 | Sep 30, 2026 |
| B | 3720 CRESCENT LLC NYC DOB building permits | 10 | Curb Cut · Curb Cut application filed in conjunction with NB GC, job number: Q01149759-I1. No product keyword matched | 3 | Sep 30, 2026 |
| B | RESIDENTIAL MANAGEMENT NY INC NYC DOB building permits | 10 | Suspended Scaffold · INSTALLATION OF OUTRIGGER AND MATERIAL HOIST FOR THE FACADE REPAIR WORK AS PER PLAN SUBMITTED. No product keyword matched | 4 | Sep 30, 2026 |
| B | H INTERIOR DESIGN CONSTRU NYC DOB building permits | 10 | General Construction · Propose change of use on 1st floor from Ambulatory Health Facility to Retail stores (No Work), obtain new C. of O. No product keyword matched | 1 | Sep 30, 2026 |
| B | JOHN PETROCELLI CONSTRUCT NYC DOB building permits | 10 | General Construction · General construction to combine units 2E and 2F into one unit. No product keyword matched | 3 | Sep 30, 2026 |
| B | 605 E 9TH COMMUNITY HOLDINGS LLC NYC DOB building permits | 10 | Structural · Structural work associated with exterior repair and restoration. No product keyword matched | 5 | Sep 30, 2026 |
| B | STRIGA ARCHITECTURE, PLLC NYC DOB building permits | 10 | Plumbing · Associated plumbing work PL with main job X01436444-I1, No product keyword matched | 1 | Sep 30, 2026 |
| B | THE LOVETT GROUP NYC DOB building permits | 10 | General Construction · facade repairs including masonry, lintel replacement and sill replacement as per plans filed. No change in use, egress or occupancy. No product keyword matched | 4 | Sep 30, 2026 |
| B | TEACHERS COLLEGE COLUMBIA UNIVERSIT NYC DOB building permits | 10 | Suspended Scaffold · Installation of suspended scaffold for facade work and/or inspection. Amend #2, added scaffold drops No product keyword matched | 2 | Sep 30, 2026 |
| B | MALACHITE GROUP LTD NYC DOB building permits | 10 | Sign · INSTALL EXTERIOR NON-ILLUMINATED SIGN ON EXISTING SIGN PANEL (CURRENCY EXCHANGE INTERNATIONAL) No product keyword matched | 2 | Sep 30, 2026 |
| B | SF CONSTRUCTION EXPERTS NYC DOB building permits | 10 | Structural · STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION IN APARTMENT J39 AS NOTED ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Sep 30, 2026 |
| B | E. CASTILLO CONSTR. CORP NYC DOB building permits | 10 | Mechanical Systems · TO ENLARGE HORIZONTALLY AND VERTICALLY TO AN EXISTING 1 FAMILY HOUSE (2 and a half stories) PLUMBING AND SPRINKLER FILED UNDER ANOTHER APPLICATION. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 30, 2026 |
| B | CNS CONSTRUCTION INC NYC DOB building permits | 10 | Mechanical Systems · New air cooled VRF heat pump systems on levels 1, 2, and 3. Outdoor condensing units on roof. No product keyword matched | 2 | Sep 30, 2026 |
| B | 13TH STREET ASSOCIATES NYC DOB building permits | 10 | Plumbing · Filing plumbing application in conjunction with the general construction for minor demolition and renovation of existing restaurant at the first floor and cellar. No change in use, egress, or occupancy. No product keyword matched | 4 | Sep 30, 2026 |
| B | RODNEY CORPORATION NYC DOB building permits | 10 | General Construction · Architectural modifications taking place on the 31st floor as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 1 | Sep 30, 2026 |
| B | RENTAL PRO MANAGEMENT CORP. NYC DOB building permits | 10 | General Construction · GENERAL CONSTRUCTION WORK TO RENOVATE 10 EXISTING APARTMENTS WORK INCLUDE REMOVAL OF EXISTING PARTITIONS,EXISTING BATHROOM AND EXISTING KITCHEN IN THE A AND B APARTMENTS ON THE SECOND THRU SIXTH FLOORS TO FACILITATE RECONSTRUCTION OF DAMAGE STRU. PAA No product keyword matched | 3 | Sep 30, 2026 |
| B | HENRY RESTORATION LIMITED NYC DOB building permits | 10 | Suspended Scaffold · FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION No product keyword matched | 8 | Sep 30, 2026 |
| B | DESIGN BY NOVA LLC NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF NEW AIR CONDITIONING SYSTEM IN EXIST. APT 18G NO CHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 3 | Sep 30, 2026 |
| B | SD DESIGN STUDIO LLC NYC DOB building permits | 10 | Construction Fence · SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 30, 2026 |
| B | DINAM DEVELOPMENT CORP NYC DOB building permits | 10 | General Construction · APPLICATION FILED FOR REPLACEMENT OF EXISTING ROOFING MATERIALS ON EXISTING INSULATED BASE NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 4 | Sep 30, 2026 |
| B | TWO CHARLTON OWNERS CORP. NYC DOB building permits | 10 | Boiler Equipment · Heating Plant upgrade. No change in use, egress or occupancy. Associated filings: MH # M01430707-I1 and PL # M01430754-I1. No product keyword matched | 3 | Sep 30, 2026 |
| B | WLP MANAGEMENT LLC NYC DOB building permits | 10 | Mechanical Systems · DIRECT REPLACEMENT OF ONE AIR HANDLER UNIT AND ONE CONDENSING UNIT ON THE ROOF. NO CHANGE TO USE, OCCUPANCY, STRUCTURE OR EGRESS No product keyword matched | 1 | Sep 30, 2026 |
| B | 9424 HOLDING LLC NYC DOB building permits | 10 | Plumbing · INSTALL SITE CONNECTION (DEP: SD1&2) USE ONLY No product keyword matched | 1 | Sep 30, 2026 |
| B | 1708 149ST LLC NYC DOB building permits | 10 | Support of Excavation · FILE SOE IN CONJUNCTION WITH JOB#Q01262005 No product keyword matched | 3 | Sep 30, 2026 |
| B | CADILLAC GROUP LLC NYC DOB building permits | 10 | Construction Fence · TEMPORARY PLYWOOD CONSTRUCTION FENCE. FILED IN CONJUNCTION WITH PROPOSED CHARGING STATION SUBMITTED UNDER SEPARATE APPLICATION # B00582586. No product keyword matched | 2 | Sep 30, 2026 |
| B | Rudd Realty Management Corp. NYC DOB building permits | 10 | Mechanical Systems · Building wide replacement of the dual temperature piping infrastructure per plans. No change in use, egress or occupancy. No product keyword matched | 6 | Sep 30, 2026 |
| B | GNS HOME IMPROVMENT LLC NYC DOB building permits | 10 | General Construction · Proposed renovation of Kitchenette, Bathroom, Foyer & Hall Closet No product keyword matched | 2 | Sep 30, 2026 |
| B | RED OAK RENOVATIONS CORP. NYC DOB building permits | 10 | General Construction · Install fire rated operable lot line windows at rear facade of first floor. No change in use, egress, or occupancy under this application. No product keyword matched | 2 | Sep 30, 2026 |
| B | CENTRAL AIR CONDITIONING NYC DOB building permits | 10 | Mechanical Systems · MECHANICAL WORK CONSISTING OF REMOVAL OF BOILER AND HOW WATER HEATERS. DECOMMISSIONING OF FUEL OIL TANK, INSTALLATION OF SPLIT SYSTEM FOR HEATING & COOLING AND ELECTRIC WATER HEATERS AS PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Sep 30, 2026 |
| B | 651 Inwood realty Corp NYC DOB building permits | 10 | General Construction · INTERIOR DEMOLITION AND BUILDOUT OF HEALTH CARE CENTER AT BASEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Sep 30, 2026 |
| B | PALLADIUM CONSTRUCTION CO NYC DOB building permits | 10 | General Construction · Facade and cellar garage repairs. No change in use, egress, or occupancy. No product keyword matched | 3 | Sep 30, 2026 |
| B | ALBANO TILE SETTERS INC NYC DOB building permits | 10 | General Construction · Interior Renovation of existing apt, updating flooring, new kitchen, updating one bathroom with like for like fixtures and a second with new fixtures. No product keyword matched | 2 | Sep 30, 2026 |
| B | 92 CT, LLC NYC DOB building permits | 10 | Mechanical Systems · INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING No product keyword matched | 1 | Sep 30, 2026 |
| B | RIL USA Inc NYC DOB building permits | 10 | Structural · Modifications to existing structural members including slab removal & installation, replacement of stair & mezzanine; install temp shoring. No change in use, egress or occupancy. No product keyword matched | 6 | Sep 30, 2026 |
| B | THEO MANAGEMENT CORP NYC DOB building permits | 10 | General Construction · FACADE RENOVATION AND REPAIR AS PER PLANS FILED HEREWITH. No product keyword matched | 2 | Sep 30, 2026 |
| B | CARMINE'S MECHANICAL INC NYC DOB building permits | 10 | General Construction · REPAIR EXIST. INTERIOR PORTION OF 1ST. FLOOR DUE TO FIRE DAMAGE, RECONFIGURE INTERIOR EXIT STAIR AND RENOVATE THE EXIST. VET SPACE ON THE 1ST. FLOOR No product keyword matched | 1 | Sep 30, 2026 |