Sprinklers · Sprinkler modifications on subcellar, cellar, 1st and 2nd floors, including removal of existing sprinkler heads/piping and installation of new sprinkler heads and branch piping connected to the existing system.
Sprinklers · Sprinkler modifications on subcellar, cellar, 1st and 2nd floors, including removal of existing sprinkler heads/piping and installation of new sprinkler heads and branch piping connected to the existing system.
No product keyword matched · NYC DOB building permits
Mechanical Systems · Mechanical modifications on subcellar, cellar, 1st and 2nd floors, including installation, removal and relocation of fan coil units, exhaust/outdoor-air systems, ductwork, piping, controls and smoke-purge systems.
No product keyword matched · NYC DOB building permits
General Construction · THE SCOPE OF WORK IS LIMITED TO THE SELECTIVE DEMOLITION OF EXISTING INTERIOR NON-BEARING PARTITIONS AND ASSOCIATED FINISHES. NO BUILDING SYSTEMS AREPROPOSED TO BE MODIFIED OR ALTERED AS PART OF THIS WORK.
No product keyword matched · NYC DOB building permits
General Construction · THE SCOPE OF WORK IS LIMITED TO THE SELECTIVE DEMOLITION OF EXISTING INTERIOR NON-BEARING PARTITIONS AND ASSOCIATED FINISHES. NO BUILDING SYSTEMS AREPROPOSED TO BE MODIFIED OR ALTERED AS PART OF THIS WORK.
No product keyword matched · NYC DOB building permits
Suspended Scaffold · INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
No product keyword matched · NYC DOB building permits