Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | LUMOS ELECTRIC LLC NYC DOB electrical permits | 11 | Trouble shoot electrical issue No product keyword matched | 2 | Oct 15, 2026 |
| B | D&D ELECTL CONST CO INC NYC DOB electrical permits | 11 | Apt 18H Lights, Switches and receptacles. |
| 3 |
| Oct 15, 2026 |
| B | PLM ELECTRIC LLC NYC DOB electrical permits | 11 | General wiring in basement , first floor and second floor ( kitchen + one room _) No product keyword matched | 3 | Oct 15, 2026 |
| B | G.S.H. ELECTRIC INC. NYC DOB electrical permits | 11 | Add feeder conductors on roof - This application supersedes permit #B01026391 No product keyword matched | 1 | Oct 15, 2026 |
| B | HABER ELECTRIC CO., INC. NYC DOB electrical permits | 11 | ELECTRICAL HEATERS FOR KITCHEN AREA No product keyword matched | 2 | Oct 15, 2026 |
| B | DF CUSTOM BUILDERS & DEV NYC DOB building permits | 11 | Structural · Structural work in conjunction with alteration #B01255295-I1 No product keyword matched | 4 | Oct 14, 2026 |
| B | YMY ACQUISITIONS LLC NYC DOB building permits | 11 | Boiler Equipment · REPLACE BOILER AND GAS/OIL BURNER. No product keyword matched | 1 | Oct 14, 2026 |
| B | RDG NYC DOB building permits | 11 | Sprinklers · Install fire sprinkler system subsequent to GC (-I1) job. The system is hydraulically calculated. No product keyword matched | 4 | Oct 14, 2026 |
| B | CENTURY MANAGEMENT NYC DOB building permits | 11 | Protection and Mechanical Methods · Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 8 | Oct 14, 2026 |
| B | STONE WORK BUILDERS LLC NYC DOB building permits | 11 | Curb Cut · Curb cut restoration in conjunction with Alt 1 BIS 440640889 No product keyword matched | 1 | Oct 14, 2026 |
| B | ASTORIA STEINWAY LLC NYC DOB building permits | 11 | Curb Cut · NEW CURB CUT INSTALLATION No product keyword matched | 4 | Oct 14, 2026 |
| B | ALF NAMAN DEVELOPMENT NYC DOB building permits | 11 | Plumbing · Installation of new plumbing infrastructure, fixtures and related piping for proposed 5-story multi-family residential building with accessory parking storage. No product keyword matched | 3 | Oct 14, 2026 |
| B | CEL TECH ELECTRIC INC NYC DOB building permits | 11 | Antenna · VERIZON SITE- REPLACE 4 ANTENNAS, INSTALL 2 NEW ANTENNAS, REPLACE 6 EXISTING RRH UNITS, AND REMOVE 1 EXISTING EQUIPMENT CABINET ON ROOF. INSTALL 2 NEW EQUIPMENT CABINETS IN THE CELLAR. No product keyword matched | 1 | Oct 14, 2026 |
| B | MALACHITE REALTY GROUP NYC DOB building permits | 11 | Mechanical Systems · install split heat pump system and ventilation system on cellar, 1st fl, 2nd fl, 3rd fl and roof. No product keyword matched | 1 | Oct 14, 2026 |
| B | HOSPITAL FOR SPECIAL SURGERY NYC DOB building permits | 11 | General Construction · HSS LL Railings: Modification and installation of new railings to accommodate the LL11 filings within the existing hospital building. No change to use, egress, or occupancy. No product keyword matched | 2 | Oct 14, 2026 |
| B | CAULDWELL WINGATE CO LLC NYC DOB building permits | 11 | General Construction · MOUNT SINAI - EMERGENCY DEPARTMENT ADA REMEDIATION - ARCHITECTURAL AND STRUCTURAL WORK ASSOCIATED TO THE EXTERIOR RAMP MODIFICATIONS AS PER PLANS FILED HEREWITH. No product keyword matched | 4 | Oct 14, 2026 |
| B | IUV PHASE 1B OWNER, LLC NYC DOB building permits | 11 | Construction Fence · INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED No product keyword matched | 9 | Oct 14, 2026 |
| B | ACCORD POWER INC NYC DOB building permits | 11 | General Construction · Facade work only. Replace existing curtain wall glass to new. No change in use, egress or occupancy under this application. No product keyword matched | 6 | Oct 14, 2026 |
| B | CANIDO BASONAS CONST SVC NYC DOB building permits | 11 | General Construction · 9th Cycle FISP Repair. No change to use, egress, or occupancy No product keyword matched | 6 | Oct 14, 2026 |
| B | COLONY CLUB NYC DOB building permits | 11 | General Construction · Replace doors with new swings and or hardware. No product keyword matched | 2 | Oct 14, 2026 |
| B | LAFAYETTE GARDENS HOLDINGS LLC NYC DOB building permits | 11 | Plumbing · PLUMBING APPLICATION FILED HEREWITH FOR INTERIOR PLUMBING WORK No product keyword matched | 2 | Oct 14, 2026 |
| B | HART ST APARTMENTS LLC NYC DOB building permits | 11 | Supported Scaffold · 28-105.4.1. EMERGENCY WORK -INSTALLATION OF SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 B.C No product keyword matched | 6 | Oct 14, 2026 |
| B | Malissa Lischin NYC DOB building permits | 11 | Plumbing · PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION AND ENLARGEMENT OF 2-FAMILY RESIDENCE. INSTALL PLUMBING FIXTURES AND ASSOCIATED PIPING. INSTALL STORM DETENTION TANK AT CELLAR. No product keyword matched | 2 | Oct 14, 2026 |
| B | BB EMPIRE CORP. NYC DOB building permits | 11 | Antenna · Modification to existing Verizon site. Remove 9 antennas, 3 dist. boxes & 12 RRH units, replace 3 antennas, relocate 4 GPS units, install 3 sectors (9 antennas), 4 dist. boxes & 16 RRHs and install 1 cabinet on existing platform on roof. No product keyword matched | 4 | Oct 14, 2026 |
| B | KINGSLAND ASSOCIATES, LLC. NYC DOB building permits | 11 | Sign · INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 14, 2026 |
| B | THE BOARD OF MANAGERS OF SOUTH STAR NYC DOB building permits | 11 | General Construction · EXTERIOR REPAIRS TO INCLUDE PARAPET REPLACEMENT & WATERPROOFING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 14, 2026 |
| B | WATERVIEW TOWERS INC. NYC DOB building permits | 11 | General Construction · FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 14, 2026 |
| B | ANTONOPOULOS HOLDINGS LLC NYC DOB building permits | 11 | Plumbing · HEREWITH FILING SUBSEQUENT PLUMBING APPLICATION TO INSTALL PLUMBING FIXTURE ON CELLAR, FIRST FLOOR AND SECOND FLOOR No product keyword matched | 1 | Oct 14, 2026 |
| B | HHI TECH INC NYC DOB building permits | 11 | General Construction · Application herewith submitted for approval of refinishing work to plaster-on-lath ceilings and walls at bathroom, kitchen, and bedroom # 2. There is no removal of partitions, ceilings, or other assemblies under this application. No product keyword matched | 1 | Oct 14, 2026 |
| B | 235 GC LLC NYC DOB building permits | 11 | Structural · THE SCOPE OF WORK FOR THIS APPLICATION INCLUDES JACKING COLUMNS 62 AND 63 TO THE SPECIFIED JACKING HEIGHTS. No product keyword matched | 9 | Oct 14, 2026 |
| B | JRR CONTRACTING INC NYC DOB building permits | 11 | General Construction · PROBES AND PATCHING IN FIRE RATED CONSTRUCTION AS INDICATED AT 6TH FLOOR, APARTMENT 6A/N. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 4 | Oct 14, 2026 |
| B | H & Y DEVELOPING LLC NYC DOB building permits | 11 | Full Demolition · Full demolition to a three story house No product keyword matched | 6 | Oct 14, 2026 |
| B | RINNOVO CONSTRUCTION, LLC NYC DOB building permits | 11 | General Construction · Second Floor Office Fit-Out No product keyword matched | 5 | Oct 14, 2026 |
| B | HUDSON MERIDIAN CONSTRUCTION NYC DOB building permits | 11 | Suspended Scaffold · Suspended Scaffold for Facade Repair as shown on Plans No product keyword matched | 3 | Oct 14, 2026 |
| B | LG ELITE PLUMBING INC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK RELATED TO APARTMENT COMBINATION AND RENOVATION OF APT D602 AND D604 AS PER PLANS FILED HEREWITH. No product keyword matched | 4 | Oct 14, 2026 |
| B | DEMO CUSTOM CABINETS,INC NYC DOB building permits | 11 | General Construction · Interior renovation with minor demolition and new partitions and finishes to combine apartment 23 and 24 as per TPPN 3/97. No change of use, egress or occupancy. No product keyword matched | 1 | Oct 14, 2026 |
| B | Laundry Capital NYC DOB building permits | 11 | Plumbing · DIRECT REPLACE EXISTING WASHERS, DRYERS AND HVAC OUTDOOR UNITS. No product keyword matched | 3 | Oct 14, 2026 |
| B | COBOT PLUMBING AND HEATIN NYC DOB building permits | 11 | Plumbing · PLUMBING WORK FOR POWDER ROOM AT 1ST FLOOR. No product keyword matched | 2 | Oct 14, 2026 |
| B | TURNER CONSIGLI JOINT NYC DOB building permits | 11 | Protection and Mechanical Methods · INSTALLATION AND USE OF SHANTY/CONTRACTOR OFFICE AS PER PLANS. No product keyword matched | 2 | Oct 14, 2026 |
| B | igor elberg NYC DOB building permits | 11 | Construction Fence · PROVIDE AN 8'-0 HIGH TEMPORARY WOOD CONSTRUCTION FENCE TO BE REMOVED ONLY AFTER COMPLETION OF ALL WORK No product keyword matched | 1 | Oct 14, 2026 |
| B | CONSTRUCTORS TRADES & SKI NYC DOB building permits | 11 | General Construction · EXTERIOR FACADE RESTORATION INCLUDING: TERRACOTTA REPAIRS, STONE & BRICK MASONRY RESTORATION AND SEALANT INSTALLATION. NO CHANGE TO OCCUPANCY, USE, EGRESS OR BULK. No product keyword matched | 5 | Oct 14, 2026 |
| B | 2015 NYC DOB building permits | 11 | General Construction · APPLICATION IS FILED TO CONVERT AN EXISTING 1 ST. & CEL. COMMERCIAL BLDG, TO A 1-STORY & CELLAR, ASSEMBLY EATING & DRINKING BUILDING. WORK INCLUDE: INSTALLING NEW PARTITIONS, BATHROOMS, DOORS, KITCHEN FIXTURES, AS PER PLAN. NEW C OF O WILL BE OBTAINED. No product keyword matched | 2 | Oct 14, 2026 |
| B | CN PLUMBING INC NYC DOB building permits | 11 | General Construction · Plans filed to legalize Existing Cellar interior partitions, 3 piece bathroom and laundry used in conjunction with First Floor Dwelling Unit. No product keyword matched | 2 | Oct 14, 2026 |
| B | RAMTOM LLC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF CONSTRUCTIN FENCE AT SIDEWALK AS PER DRAWINGS IN CONNECTION WITH JOB B01175087-I1. No product keyword matched | 4 | Oct 14, 2026 |
| B | AMIRIAN GROUP NYC DOB building permits | 11 | General Construction · Restoration of existing facade & replacement of windows. on the basement and first through fourth floors. No change in occupancy, use or egress. No product keyword matched | 4 | Oct 14, 2026 |
| B | YATES EXTERIOR RESTORATIO NYC DOB building permits | 11 | Sidewalk Shed · Installation of a sidewalk shed No product keyword matched | 16 | Oct 14, 2026 |
| B | CRAFTED INTERIORS DESIGN NYC DOB building permits | 11 | Structural · NEW STAIRCASE FRAMING AND OPENING IN THE EXISTING SLAB. No product keyword matched | 3 | Oct 14, 2026 |
| B | UNDERCONSTRUCTION AKS INC NYC DOB building permits | 11 | Structural · PROPOSED INTERIOR RENOVATION OF AN EXISTING 2-STORY OVER BASEMENT & CELLAR, 2-FAMILY RESIDENTIAL BRICK BUILDING @ PARTIAL CELLAR, FULL 1ST FLOOR & 2ND FLOOR ONLY.WORK INCLUDES INSTALLATION OF NEW AND REPLACEMENT/RELOCATION OF EXISTING FIXTURES, FINISHES, No product keyword matched | 2 | Oct 14, 2026 |
| B | JUN'S CONSTRUCTION INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 14, 2026 |
| B | VIP FIRE SPRINKLER INC NYC DOB building permits | 11 | Sprinklers · To file SP sprinkler work in conjunction with DOB Now Build application job#B01277178. No product keyword matched | 1 | Oct 14, 2026 |