Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | Bravon Capital LLC NYC DOB building permits | 11 | Sprinklers · SUBSEQUENT SPRINKLER APPLICATION FILED HEREWITH. No product keyword matched | 10 | Oct 15, 2026 |
| B | REVCON MANAGEMENT LLC NYC DOB building permits | 11 |
| 2 |
| Oct 15, 2026 |
| B | CONTOWERS ASSOCIATES LP NYC DOB building permits | 11 | Structural · FILING FOR STAIR OPENING CLOSURE & CELLAR SLAB REPAIRPROPOSED WHOLE FOODS STORE, NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 15, 2026 |
| B | BD CONSTRUCTION & BUILDER NYC DOB building permits | 11 | Structural · APPLICATION FILED HEREWITH FOR A RECONSTRUCTED ONE CAR GARAGE. No product keyword matched | 1 | Oct 15, 2026 |
| B | G N CONSTRUCTION INC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 3 | Oct 15, 2026 |
| B | BUILDTEK LLC NYC DOB building permits | 11 | General Construction · interior renovation work No product keyword matched | 7 | Oct 15, 2026 |
| B | SIDAHAR CORP NYC DOB building permits | 11 | General Construction · Facade repair work as per plan. No change in use, egress or occupancy. No product keyword matched | 4 | Oct 15, 2026 |
| B | SAINT JOSEPH'S MEDICAL CENTER NYC DOB building permits | 11 | Mechanical Systems · FILING HEREWITH FOR MECBANICAL WORK IN CINJUNCTION WITH INTERIOR RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 15, 2026 |
| B | VIKING NYC DOB building permits | 11 | Plumbing · PROPOSED REPLACE PLUMBING FIXTURES ON 2ND FLOOR APT. #6 AND 3RD FLOOR APT#12. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 15, 2026 |
| B | EKKO NYC DOB building permits | 11 | Full Demolition · HAND DEMO OF EXISTING WOOD FRAMED GARAGE No product keyword matched | 3 | Oct 15, 2026 |
| B | Menora Properties NYC DOB building permits | 11 | Full Demolition · This is a full demolition, exempt from plan No product keyword matched | 2 | Oct 15, 2026 |
| B | GRAVITY STUDIO INC NYC DOB building permits | 11 | General Construction · RENOVATION ON CELLAR, PARTIAL OF 1ST FLOOR AND 3RD FLOOR AS SHOWN ON PLAN. NO CHANGE IN OCCUPANCY, USE OR EGRESS. No product keyword matched | 2 | Oct 15, 2026 |
| B | Stryker Law LLC NYC DOB building permits | 11 | General Construction · RENOVATE UNIT #3R ON 3rd FLOOR, INCLUDING INSTALLING NEW INTERIOR NON-LOAD BEARING PARTITIONS, LIGHTING AND FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 15, 2026 |
| B | MAESTRO WEST CHELSEA SPE LLC NYC DOB building permits | 11 | Support of Excavation · Support of excavation in conjunction with construction of New Building. No product keyword matched | 2 | Oct 15, 2026 |
| B | 1304 POLITE REALTY LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION FOR 1ST FLOOR APT. B, 2ND FLOOR APT. 1B, 3RDFLOOR APT. 2B, 4TH FLOOR APT. 3B, 5TH FLOOR APT. 4B, 6TH FLOOR APT.5B AS PER PLAN. FILING TO ADDRESS HPD VACATE ORDERS UNDER 261109 AND 261069. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | SINO-AMERICAN BUDDHIST ASSOCIATION NYC DOB building permits | 11 | General Construction · PROPOSE STOREFRONT AND INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT CEL. & 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | KAKATUA AGENCY NYC DOB building permits | 11 | Plumbing · Cellar propose new 3 pc bathroom, 2 floor drain, relocate existing kitchen in first floor, propose new bathrooms in first and second floor. Propose laundry are in second floor (washing machine, gas dryer, slop sink) Propose 1 gas furnace in cell and attic No product keyword matched | 1 | Oct 15, 2026 |
| B | FOREST PLAZA LLC NYC DOB building permits | 11 | Mechanical Systems · DIRECT REPLACEMENT OF TWO (2) ROOF TOP UNITS ONTO EXISTING ROOF CURB No product keyword matched | 1 | Oct 15, 2026 |
| B | OLYMPIA HOUSE LP NYC DOB building permits | 11 | Boiler Equipment · CHANGE GRADE OF OIL FROM #2 TO TRUBURN. No product keyword matched | 1 | Oct 15, 2026 |
| B | WINFIELD TOWER NYC DOB building permits | 11 | General Construction · Existing building facade repairs. Rebuild the parapet wall, repair the deteriorated cracks, and replace the lintels and sill with cracks. No product keyword matched | 1 | Oct 15, 2026 |
| B | NASSAU MEAT MARKET NYC DOB building permits | 11 | Plumbing · PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS AND OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | LEDI ENTERPRISES CORP NYC DOB building permits | 11 | General Construction · INTERIOR ALTERATION TO APARTMENT 2 ON THE 2ND FLOOR. WORK INCLUDES KITCHEN AND BATHROOM REMODEL, NEW LIGHTING, AND NEW HEAT-PUMP MINI-SPLIT SYSTEM. NO CHANGE TO OCCUPANCY, USE, OR EGRESS. No product keyword matched | 2 | Oct 15, 2026 |
| B | LOUIS L BUTTERMARK&SONS I NYC DOB building permits | 11 | Plumbing · RELOCATE BATH, KITCHEN AND LAUNDRY FACILITIES ON FIRST FLOOR No product keyword matched | 1 | Oct 15, 2026 |
| B | Wolf Lake Reality NYC DOB building permits | 11 | Solar · Installation of solar panels, rootop, grid tied, railed, 9 modules, 3.69 KW No product keyword matched | 1 | Oct 15, 2026 |
| B | SADIO HOUSE LLC NYC DOB building permits | 11 | Plumbing · TO PROPOSE NEW PLUMBING FIXTURES FOR COMMERCIAL RESTAURANT ON CELLAR AND 001 FLOOR WITH PLUMBING WORK TYPE AS PER PLAN FILED HEREWITH; NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | 410 ATLANTIC LLC NYC DOB building permits | 11 | Plumbing · REPLACEMENT OF GAS STOVE/DRYER WITH ELECTRIC ON SECOND FLOOR AND REPLACEMENT OF BOILER IN CELLAR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS No product keyword matched | 1 | Oct 15, 2026 |
| B | BENYETTA 148 LLC NYC DOB building permits | 11 | Plumbing · Repair and replace gas piping/ riser from Cellar to 1st floor roof. No product keyword matched | 1 | Oct 15, 2026 |
| B | ASP HILLSIDE NYC DOB building permits | 11 | Plumbing · Install plumbing fixtures in new constructed toilets. No product keyword matched | 1 | Oct 15, 2026 |
| B | NEXUS PLUMBING & HEATING NYC DOB building permits | 11 | Sprinklers · SUBSEQUENT FILING OF PLUMBING & SPRINKLER OWRK IN CONJUNCTION WITH DOB#B01465643-I1(GC: NAIL SHOP). WORK INCLUDES INSTALLATION OF PL FIXTURES (PEDICURE SINKS) AND MODIFICATION OF SPRINKLER HEADS AS PER THE PLANS HEREWITH. No product keyword matched | 1 | Oct 15, 2026 |
| B | MOXADO, INC. NYC DOB building permits | 11 | General Construction · HEREWITH IS A FILING TO ADD THE TR1 AND TR8 ITEMS LIST, TO REMOVE SITE SAFETY REQUIREMENTS. No product keyword matched | 1 | Oct 15, 2026 |
| B | HOUSING IS A HUMAN RIGHT LLC NYC DOB building permits | 11 | Boiler Equipment · Boiler filing as per plans filed for second Boiler.. No product keyword matched | 1 | Oct 15, 2026 |
| B | DOMS AUTO BODY NYC DOB building permits | 11 | General Construction · INSTALLATION OF SPRAY BOOTH AND PAINT MIXING ROOM No product keyword matched | 1 | Oct 15, 2026 |
| B | DEEP CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · FILING TO CORRECT VIOLATION 39172804J. WORK LIMITED TO REMOVAL OF UNPERMITTED WORK AT THE FRONT BSMT LEVEL & RESTORATION OF GARAGE DOOR OPNG. WORK INCLUDES DEMO OF NON-LOAD BEARING EXT. INFILL WALL & INST OF A NEW OVERHEAD GARAGE DOOR AT ORIGINAL LOCATION No product keyword matched | 1 | Oct 15, 2026 |
| B | NYB BUILDERS INC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF 50 PSF MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. FILING TO ADDRESS ECB VIO #: 39556999L. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | DESIGN TECH CONTRACTING C NYC DOB building permits | 11 | General Construction · Fire Repair of 1st and 2nd floor in rear No product keyword matched | 1 | Oct 15, 2026 |
| B | A. RANDOLPH HAIG DAY CARE CENTER, I NYC DOB building permits | 11 | Sprinklers · Propose sprinkler modification to install new automatic wet sprinkler system throughout cellar, 001, Mezz, 002 floors all as per plans herewith filed. no change in use, egress or occupancy filed under this application. No product keyword matched | 1 | Oct 15, 2026 |
| B | CENTRO PAZ CONSTRUCTION C NYC DOB building permits | 11 | Construction Fence · Filing for fence application, installation of 8'-0 plywood construction fence in conjunction to application B01273633-I1. No product keyword matched | 1 | Oct 15, 2026 |
| B | 122 2 STREET, LLC NYC DOB building permits | 11 | Structural · PROPOSED TEMPORARY SHORING WALL ON CELLAR ONLY. APPLICATION FILED TO REMOVE VIOLATIONS #39132173X, 39144404M, & 39132174H. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | RNB HOLDING, LLC NYC DOB building permits | 11 | Plumbing · PLUMBING & SPRINKLER WORK IN CONJUCTION WITH ALT 1 121207274 No product keyword matched | 1 | Oct 15, 2026 |
| B | ESSENTIAL PLUMBING & HEATING, LLC NYC DOB building permits | 11 | Plumbing · Legalization of 1st floor bathroom fixtures for unit 1A. No change of use, egress or occupancy under this application. No product keyword matched | 1 | Oct 15, 2026 |
| B | REGIONAL ELEC'L VOICE & NYC DOB electrical permits | 11 | Furnish and Install new Exit lights, Emergency 2 Head lighting and Vandal Guards in public corridors. form the Basement, 1st Fl, 2nd Fl, 3rd Fl. No product keyword matched | 1 | Oct 15, 2026 |
| B | CPL ELECTRICAL SERVICES NYC DOB electrical permits | 11 | Install electrical distribution for mechanical equipment, general use receptacles and lighting. Install new Fire Alarm System. No product keyword matched | 2 | Oct 15, 2026 |
| B | INTAKE ELECT CONT CORP NYC DOB electrical permits | 11 | general wiring 5th and 6th floor only No product keyword matched | 7 | Oct 15, 2026 |
| B | NEWGRANGE ELECTRIC, INC NYC DOB electrical permits | 11 | Extend existing rooftop solar system. Install one new inverter to serve an additional 26 kW solar array consisting of 56 solar panels. No product keyword matched | 3 | Oct 15, 2026 |
| B | PROJECT ONE ELECTRIC INC NYC DOB electrical permits | 11 | General wiring from existing electrical panel for Cellar 1st floor and 2nd floor restaurant. No product keyword matched | 9 | Oct 15, 2026 |
| B | TECHNO-VOLT ELEC, INC NYC DOB electrical permits | 11 | Gut Rehab 17 Apts and BSMT Not Touching Service Work No product keyword matched | 1 | Oct 15, 2026 |
| B | LTC ELECTRIC INC. NYC DOB electrical permits | 11 | Replacement of panel as per insurance requirements No product keyword matched | 4 | Oct 15, 2026 |
| B | RIGID ELECTRIC, INC. NYC DOB electrical permits | 11 | Installation of tv boxes throughout kellen tower offices No product keyword matched | 11 | Oct 15, 2026 |
| B | GANLY ELECTRICAL CORP NYC DOB electrical permits | 11 | General Wiring in Apartment# 6D No product keyword matched | 4 | Oct 15, 2026 |
| B | METRO ELEC'L CONTRS, INC NYC DOB electrical permits | 11 | General Wiring 2nd floor No product keyword matched | 1 | Oct 15, 2026 |