Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | CONSTRUCTORS TRADES & SKILLS CORP NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TMEPORARY SIDEWALK SHED AN SUPPORTED SCAFFOLD AS SHOWN ON PLANS No product keyword matched | 1 | Oct 15, 2026 |
| B | KECHEK REALTY NYC DOB building permits |
| 11 |
General Construction · CONVERSION OF AN EXIST. COMMERCIAL FLOOR( 15TH. FLOOR) TO RESIDENTIAL USE AS PER ARTICLE 7B OF MDL. No product keyword matched |
| 3 |
| Oct 15, 2026 |
| B | GLOBAL MANAGEMENT LLC NYC DOB building permits | 11 | Construction Fence · PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 15, 2026 |
| B | DACI CONSTRUCTION CORP NYC DOB building permits | 11 | General Construction · MINOR INTERIOR ALTERATIONS TO APT 812 CLOSET TO INCLUDE REMOVAL AND INSTALLATION OF 1 PARTITION. NO CHANGE TO USE, OCCUPANCY OR EGRESS No product keyword matched | 1 | Oct 15, 2026 |
| B | A&P REMODELING CO INC NYC DOB building permits | 11 | Sprinklers · Modification of sprinkler system in conjunction with construction work as shown on submitted plans. No change in occupancy, use or egress. No product keyword matched | 1 | Oct 15, 2026 |
| B | RED GROUP MANAGEMENT NYC DOB building permits | 11 | Sprinklers · Existing sprinkler modifications and additions based new layout. No product keyword matched | 2 | Oct 15, 2026 |
| B | ZOOM CONTRACTING INC NYC DOB building permits | 11 | General Construction · Installation of a private roof terrace for use by tenants of apartment 6G. No change to use, egress or occupancy No product keyword matched | 1 | Oct 15, 2026 |
| B | ROCK FACE CONSTR INC NYC DOB building permits | 11 | Structural · PROPOSED REPLACEMENT OF THE BEAM HOLDING 1ST FLOOR AND NEW COLUMNS WITH SUPPORTING FOUNDATION BELOW AS PER PLANS FILED HEREWITH AND IN CONJUNCTION WITH JOB#322010523. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | THE RENOVATED HOME 1 LTD NYC DOB building permits | 11 | General Construction · INTERIOR ALTERATIONS:NEW PARTITIONS,NEW MILLWORK&ENCLOSURES, NEW MOLDING /TRIM,NEW DOORS, TRIMS&CASINGS;RENOVE BATHROOMS,NEW KITCHEN LAYOUT/ APPLIANCES. S1 DOC FILED FOR PLUMBING. No product keyword matched | 1 | Oct 15, 2026 |
| B | FRERES, INC. NYC DOB building permits | 11 | General Construction · PROPOSED NEW MIXED BUILDING RETAIL + MULTIFAMILY 6 STORIES WITH CELLAR No product keyword matched | 1 | Oct 15, 2026 |
| B | BLUESTONE CONSTRUCTION AN NYC DOB building permits | 11 | Mechanical Systems · Renovation of Apt. 1H on first floor, partition work per plans. Installation of a new electric HVAC system with ductwork in Apt. 1H and a condensing unit inside exterior wall. No change in use, egress or occupancy. PL work will be filed subsequently. No product keyword matched | 1 | Oct 15, 2026 |
| B | M SQUARED CONTRACTORS LLC NYC DOB building permits | 11 | Mechanical Systems · INSTALL 6 NEW UNDER THE WINDOW AND 1 DUCTED PACKAGE HEAT PUMP UNITS FOR APT 7A. INSTALL KITCHEN HOOD AND BATHROOM VENTILATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 15, 2026 |
| B | LANTERN ORGANIZATION NYC DOB building permits | 11 | Sprinklers · Sprinkler in conjunction with Architectural # X01165180-S3 No product keyword matched | 3 | Oct 15, 2026 |
| B | NOCRALA SIGN MANAGEMENT LLC NYC DOB building permits | 11 | Sign · INDIRECTLY ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN APPROVED BY NYC LANDMARK PRESERVATION COMMISSION PERMIT# CNE-26-11028 - ACNE STUDIOS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | Resilient Homes HDFC, Inc. NYC DOB building permits | 11 | Foundation · Proposed (FO) foundation work to prepare for the new foundation of a pre-fabricated modular residence. The residence will be supported on reinforced concrete piers with reinforced concrete grade beams and helical piers. No product keyword matched | 2 | Oct 15, 2026 |
| B | STATUS PROJECT MGMT CORP NYC DOB building permits | 11 | General Construction · PROPOSED CHANGE OF BUILDING'S USE FROM THE EXISTING TWO DWELING UNITS AND ONE COMMERCIAL UNIT TO THE PROPOSED ONE DWELLING UNIT AND ONE COMMERCIAL UNIT. WORK INVOLVES NEW INTERIOR PARTITIONS. A NEW CERTIFICATE OF OCCUPANCY IS REQ'D. No product keyword matched | 2 | Oct 15, 2026 |
| B | CARY P O'BRIEN DESIGN LLC NYC DOB building permits | 11 | Structural · Replacement of damaged portion of an existing wood girder at cellar level No product keyword matched | 2 | Oct 15, 2026 |
| B | UP CONSTRUCTION AND RESTO NYC DOB building permits | 11 | Mechanical Systems · MECHANICAL WORK IN CONJUNCTION WITH INTERIOR ALTERATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Oct 15, 2026 |
| B | SCIAME HOMES NY LLC NYC DOB building permits | 11 | General Construction · Alt. CO addition to existing apt. unit to include GC, demo to interior and exterior partitions with installation of new structural steel, non load bearing partitions, windows, doors, flooring, millwork and finishes. no change to use, egress and occupancy. No product keyword matched | 1 | Oct 15, 2026 |
| B | NY DEVELOPERS & MANAGEMEN NYC DOB building permits | 11 | Construction Fence · Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 15, 2026 |
| B | 1890 Bergen estates LLC NYC DOB building permits | 11 | General Construction · Renovation of existing two-family building, rearrange existing units with general constructions as per plan. Amend C of O. No product keyword matched | 3 | Oct 15, 2026 |
| B | ENS REALTY CORP NYC DOB building permits | 11 | Plumbing · Install sprinkler system extension for new laundry room. There is no change in use occupancy or egress. No product keyword matched | 2 | Oct 15, 2026 |
| B | CREH70 LLC NYC DOB building permits | 11 | Construction Fence · Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 2 | Oct 15, 2026 |
| B | 20 RSW, LLC NYC DOB building permits | 11 | General Construction · 1ST FLOOR EXISTING RETAIL SPACE INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 15, 2026 |
| B | ADVANCED REMODELING SOLU NYC DOB building permits | 11 | General Construction · Existing 2 family, GC reno consisting of removal of non-load bearing partitions and new interior layout @ Bas, 1st & 2nd fl, add new window at back facade, limited facade work & door replacements. No change to use, egress, occupancy, or bulk. No product keyword matched | 1 | Oct 15, 2026 |
| B | SETANTA INC NYC DOB building permits | 11 | Construction Fence · INSTALLATION AND USE OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 15, 2026 |
| B | CHAZCO CONSTRUCTION INC NYC DOB building permits | 11 | Mechanical Systems · Replacement of 2 hvac units on roof over Cross County Savings Bank No product keyword matched | 1 | Oct 15, 2026 |
| B | KAPLON-BELO REAL ESTATE LLC NYC DOB building permits | 11 | General Construction · Removal of non-load bearing interior partitions and renovation of existing bathroom. No product keyword matched | 1 | Oct 15, 2026 |
| B | UNIVERSAL SUPERIOR GROUP* NYC DOB building permits | 11 | General Construction · TENANT ALTERATIONS TO COMMERCIAL INTERIOR ON 1ST, 2ND, 3RD & 4TH FLOORS ONLY. SCOPE INCL THE REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS AND RELATED FINISHES FILED HERE WITH NO ALTERATIONS TO THE EXISTING BUILDING ENVELOPE.THERE IS NO CHANGE TO USE. No product keyword matched | 3 | Oct 15, 2026 |
| B | TEMPERINI MECHANICAL INC NYC DOB building permits | 11 | Plumbing · TO ALTER THE EXISTING FIRST-FLOOR TOILET ROOM TO COMPLY WITH ADA REQUIREMENTS AND TO ADD ONE NEW TOILET ROOM, AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 15, 2026 |
| B | MERCURY FIRE SUPP INC NYC DOB building permits | 11 | Sprinklers · To install a new Automatic sprinkler system at cellar ,1,&2nd floor as per plan No product keyword matched | 2 | Oct 15, 2026 |
| B | Independence Plaza Realty LLC NYC DOB building permits | 11 | Construction Fence · proposed temporary fence for demolition Q01209807-I1 and to build new structure after. No change to use egress or occupancy under this application. No product keyword matched | 2 | Oct 15, 2026 |
| B | ARISA REALTY LLC NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS.SIDEWALK SHED LIVE LOAD WILL BE 300 PSF, ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | MR. GREEN CONTRACTORS LLC NYC DOB building permits | 11 | General Construction · DIVIDE EXISTING CELLAR RECREATION INTO TWO SPACES IN EXISTING APARTMENT 1C PER PLANS SUBMITTED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 15, 2026 |
| B | DEFINE CONTRACTING INC NYC DOB building permits | 11 | Plumbing · Application filing plumbing work in connection with job#B01446906-I1 and B01408771-I1 as per plan. No change of use, egress and occupancy under this application. No product keyword matched | 1 | Oct 15, 2026 |
| B | STUDIO NYANDAK CONSTRUCTI NYC DOB building permits | 11 | Mechanical Systems · Install Split air-cooled AC units. No change of use, egress or occupancy. No product keyword matched | 3 | Oct 15, 2026 |
| B | BRIGHTON TERRACE LLC. NYC DOB building permits | 11 | Plumbing · relocate and new plumbing fixtures on the 1st flr. No change to use , egress or occupancy No product keyword matched | 3 | Oct 15, 2026 |
| B | BRICOLAGEDESIGNS NYC DOB building permits | 11 | Plumbing · INSTALL PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS No product keyword matched | 1 | Oct 15, 2026 |
| B | ABACUS REAL ESTATE HOLDINGS CORP. NYC DOB building permits | 11 | General Construction · AMEND 2ND FLOOR FROM OFFICES TO TEMPORARY SCHOOL. MINOR RENOVATION TO CREATE CLASSROOMS. No product keyword matched | 1 | Oct 15, 2026 |
| B | J&J Design NY LLC NYC DOB building permits | 11 | General Construction · proposed vertical and horizontal extension with 4 dwelling unit on existing 3 story building No product keyword matched | 5 | Oct 15, 2026 |
| B | STATEN ISLAND MECH LLC NYC DOB building permits | 11 | Plumbing · plumbing work in conjunction with renovation of single family home and resolving violation 39189315J No product keyword matched | 1 | Oct 15, 2026 |
| B | DART RESTORATION CORP NYC DOB building permits | 11 | General Construction · Interior renovation of existing 1 story 1 family house. No change in use, occupancy or egress. No product keyword matched | 1 | Oct 15, 2026 |
| B | NEW AMSTERDAM BUILDERS LL NYC DOB building permits | 11 | Mechanical Systems · Replace two existing PTAC units in existing location. Install new PTAC unit, new kitchen and dryer exhaust as shown on plans. No product keyword matched | 3 | Oct 15, 2026 |
| B | Town House Management LLC NYC DOB building permits | 11 | General Construction · garage repair No product keyword matched | 3 | Oct 15, 2026 |
| B | Arian Construction Inc NYC DOB building permits | 11 | Suspended Scaffold · Suspended scaffold in order to perform close-up inspections and facade repairs. No change in use, occupancy or egress under this application. No product keyword matched | 2 | Oct 15, 2026 |
| B | N Y BUILDERS MILLENNIUM NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 2 | Oct 15, 2026 |
| B | ELIO REALTY GROUP NYC DOB building permits | 11 | General Construction · General construction related to the renovation of an existing 2-family residence. No product keyword matched | 1 | Oct 15, 2026 |
| B | METRO LANDMARK REALTY INC NYC DOB building permits | 11 | Antenna · Modification of existing T-Mobile site. Remove 9 antennas & install 9 additional antennas. No product keyword matched | 1 | Oct 15, 2026 |
| B | GEORGE ARYEH NYC DOB building permits | 11 | Plumbing · PLUMBING WORK AT 1ST FLOOR, APTS 1L, 1R, AS PER PLANS FILED HEREWITH No product keyword matched | 4 | Oct 15, 2026 |
| B | CLASSIC REALTY LLC NYC DOB building permits | 11 | General Construction · PLANS FILED TO RENOVATE PH-C (12 FL),,NEW PARTITIONS, DOORS, AND DECORATIVE FIXTURES AS PER PLANS, TOTAL APT SF IS 1180 SF AREAS OF WORK IS 557 SF (MS WORK TYPE TO BE FILED SEPARATELY UNDER ITS OWN APPLICATION #, PL TO BE FILED UNDER AN LAA) No product keyword matched | 2 | Oct 15, 2026 |