Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | DH EAGLE PLBG & HTG INC NYC DOB building permits | 11 | Plumbing · RENOVATION OF EXISTING APARTMENT #26. INSTALL PLUMBING FIXTURES. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION No product keyword matched | 2 | Oct 16, 2026 |
| B | DAVARO CONTRACTING LLC NYC DOB building permits |
| 11 |
Construction Fence · NEW TEMPORARY CONSTRUCTION FENCE IN REAR YARD OF EXISTING 2 STORY BLDG. IN CONJUNCTION WITH APPLICATION # B01358133-I1 No product keyword matched |
| 3 |
| Oct 16, 2026 |
| B | ANTONIO J BOCAS NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION SCOFFOLDING AT BUILDING FACADE AS PER PLAN. No product keyword matched | 1 | Oct 16, 2026 |
| B | B.M.S. REALTY ASSOCIATES, INC. NYC DOB building permits | 11 | Sign · ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 16, 2026 |
| B | NYCBK2PL LLC NYC DOB building permits | 11 | Sprinklers · install new sprinkler system for the 2-family house building No product keyword matched | 3 | Oct 16, 2026 |
| B | NEXT GENERATION RESTORATI NYC DOB building permits | 11 | Mechanical Systems · REPLACEMENT OF EXISTING CARRIER ROOFTOP UNIT WITH NEW AAON UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 16, 2026 |
| B | 684 OWNERS CORP. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 1 | Oct 16, 2026 |
| B | HENRY MYERS PLUMBING & HEATING INC NYC DOB building permits | 11 | Plumbing · HEREBY FILING PLUMBING WORK AT 15TH FLOOR UNIT 15A AS PER PLANS No product keyword matched | 3 | Oct 16, 2026 |
| B | Park Auto Repair LLC NYC DOB building permits | 11 | Plumbing · Installation of (4) vented unit heaters on first floor. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 16, 2026 |
| B | NYCT NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 16, 2026 |
| B | ESAAK MULLAEV MD NYC DOB building permits | 11 | Plumbing · PROPOSED PLUMBING WORK FOR THE CONVERSION OF AN EXISTING 1 FAMILY ( CO 20738-41 ) TO 2 FAMILY DWELLING BY CREATING A NEW BASEMENT APARTMENT INCLUDING A HORIZONTAL ENLARGEMENT AT 1ST FLOOR AND INTEROR RENOVATION AS PER PLANS. No product keyword matched | 2 | Oct 16, 2026 |
| B | CMP CONTRACTING INC NYC DOB building permits | 11 | General Construction · RENOVATE EXISTING STORES, REMOVE NON BEARING PARTITIONS AND COUNTERS No product keyword matched | 2 | Oct 16, 2026 |
| B | NYC PACT PRESERVATION PARTNERS NYC DOB building permits | 11 | Structural · STRUCTURAL WORK TO REPAIR STEEL STAIRS AT PUBLIC HALLS FROM 1ST TO 4TH FLOOR. No product keyword matched | 3 | Oct 16, 2026 |
| B | O&B ASSOCIATES GROUP CORP NYC DOB building permits | 11 | Mechanical Systems · Installation of HVAC system for Unit#3 No change of use, egress or occupancy under this application No product keyword matched | 2 | Oct 16, 2026 |
| B | 710 Macon LLC NYC DOB building permits | 11 | General Construction · On 1st floor, removal of existing deck in rear yard to comply violation #39190983N.. Al las per plans. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 16, 2026 |
| B | ERPM COMPANY NYC DOB building permits | 11 | General Construction · General Construction to perform localized repairs of defective stone and brick masonry, perform localized mortar joint cutting and repointing, at street facades and west return wall as per plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 16, 2026 |
| B | JP HOME CONSTRUCTION CORP NYC DOB building permits | 11 | Mechanical Systems · PROPOSED NEW TWO STORY ONE FAMILY DWELLING. No product keyword matched | 2 | Oct 16, 2026 |
| B | FINE FINISHES CONSTR. LLC NYC DOB building permits | 11 | General Construction · Architectural Interior Renovation of Existing Retail Space on Part of 1st Floor Including Demolition and Installation of Partitions, Doors, Suspended Ceiling, Store Fixtures, Wall & Floor Finishes. No Change to Occupancy, Use or Egress is Proposed No product keyword matched | 1 | Oct 16, 2026 |
| B | HASKELL REAL ESTATE NYC DOB building permits | 11 | General Construction · Propose to renovate units 1b & 4A on the 1st & 4th flrs work to include Kitchen & bathroom only with general carpentry work, No change of use or bulk or egress No product keyword matched | 3 | Oct 16, 2026 |
| B | GRAND CONSTRUCTION & DEVELOPMENT G NYC DOB building permits | 11 | Curb Cut · ONE EXISTING CURB CUT IN CONJUNCTION WITH JOB #Q00479380 No product keyword matched | 1 | Oct 16, 2026 |
| B | Mattress Firm NYC DOB building permits | 11 | Plumbing · CONNECT TO EXISTING GAS PIPING FOR ONE (1) REPLACEMENT PACKAGED HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 16, 2026 |
| B | MAGNOLIA BAKERY NYC DOB building permits | 11 | General Construction · FILED HEREWITH TO REPLACE EXISTING HANDICAP RAMP AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 16, 2026 |
| B | 845 Third Owner LLC NYC DOB building permits | 11 | General Construction · Alt-CO being filed for the conversion of a commercial building to a residential use per Article 1 Chapter 5. No product keyword matched | 5 | Oct 16, 2026 |
| B | 108-114 Wooster Street Corporation NYC DOB building permits | 11 | General Construction · INSTALLATION OF NON-PENETRATING BALLASTED FENCE ON EXISTING ROOF. NO CHANGE TO SQUARE FOOTAGE, BULK, USE OR EGRESS. No product keyword matched | 1 | Oct 16, 2026 |
| B | 101 Homes Realty LLC NYC DOB building permits | 11 | Full Demolition · Full Demolition to a 2 Story Structure No product keyword matched | 4 | Oct 16, 2026 |
| B | Studio Pilates Long Island City NYC DOB building permits | 11 | Mechanical Systems · HVAC SYSTEM AND TOILET EXHAUST INSTALLATION FOR PILATES STUDIO ON 1ST FL AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 1 | Oct 16, 2026 |
| B | RIGHT CHOICE CONSTRUCTION NYC DOB building permits | 11 | General Construction · Interior renovation with brick facade update. No product keyword matched | 3 | Oct 16, 2026 |
| B | BUILDWISE PLUMBING HEATIN NYC DOB building permits | 11 | Plumbing · Removal and replacement of gas piping to existing equipment as shown on plans due to utility company inspection and shutdown. No removal or addition of any gas burning equipment. No product keyword matched | 1 | Oct 16, 2026 |
| B | GERARDS PLUMBING & HEATIN NYC DOB building permits | 11 | Mechanical Systems · FILING HEREWITH DRAWINGS TO INSTALL NEW EXHAUST DUCTS FOR PROPOSED GAS DRYERS. THIS APPLICATION DOES NOT REQUIRE A NEW OR AMENDED CERTIFICATE OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 16, 2026 |
| B | GERARD'S PLBG & HTG CORP NYC DOB building permits | 11 | Plumbing · HEREBY FILING THIS APPLICATION TO PROPOSE A NEW LAUNDRY ROOM LOCATED IN THE CELLAR AS AN ACCESSORY USE TO THE BUILDING AS PER PLANS SUBMITTED. THIS APP DOES NOT REQUIRE A NEW OR AMENDED CERT. OF OCCUPANCY AS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 3 | Oct 16, 2026 |
| B | JMR MECHANICAL INC NYC DOB building permits | 11 | Plumbing · Replace, relocate, or install new plubming fixtures. No change of use, egress, or occupancy under this application No product keyword matched | 2 | Oct 16, 2026 |
| B | MY FRIEND CONSTRUCTION LLC NYC DOB building permits | 11 | Plumbing · replacement and installation of plumbing fixtures in conjunction with apartment renovation as shown on plans. No change to egress, use or occupancy. No product keyword matched | 2 | Oct 16, 2026 |
| B | 737364984 NYC DOB building permits | 11 | Plumbing · INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE FOR FOOD TAKEOUT INCLUDING ONE TWO FIXTURE TOILET INSTALLATION. NO GAS WORK WITH THIS APPLICATION. No product keyword matched | 1 | Oct 16, 2026 |
| B | KAP18 Group Inc NYC DOB building permits | 11 | Mechanical Systems · FILE HEREWITH MECHANICAL WORK FOR EXISTING THREE(3) STORY RESIDENTIAL BUILDING IN CONJUNCTION WITH ALT #B01330755-I1 No product keyword matched | 2 | Oct 16, 2026 |
| B | SPEARS CONDOMINIUM NYC DOB building permits | 11 | Plumbing · Replacement of bathroom, kitchen, laundry fixtures, and boiler. No change of use, egress, or occupancy under this application. No product keyword matched | 4 | Oct 16, 2026 |
| B | Thousand Sunny Inc. NYC DOB building permits | 11 | Plumbing · PLUMBING WORK ASSOCIATED WITH EATING AND DRINKING ESTABLISHMENT AS PER PLANS FILED HEREWITH. NO CHANGE IS USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 16, 2026 |
| B | KoBuild LLC NYC DOB building permits | 11 | Plumbing · New plumbing fixtures cellar, 2nd floor; replace and relocate existing plumbing fixtures cellar, 1st floor 2nd and 3rd floor. No product keyword matched | 3 | Oct 16, 2026 |
| B | Centaur Properties NYC DOB building permits | 11 | Mechanical Systems · Direct replacement of existing rooftop units No product keyword matched | 2 | Oct 16, 2026 |
| B | WEST VILLAGE CONTRACT LLC NYC DOB building permits | 11 | General Construction · Interior Renovation of existing apartment on the 6th Floor. No Change to Use, Egress or Occupancy under this application. No product keyword matched | 2 | Oct 16, 2026 |
| B | c/o Colliers International REMS NYC DOB building permits | 11 | Plumbing · INSTALLATION OF PLUMBIBG FIXTURES AS PER PLANS FILED HERWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 6 | Oct 16, 2026 |
| B | EMPIRE CONSTR ASSOC INC NYC DOB building permits | 11 | Support of Excavation · PROPOSED SOE APPLICATION IN CONJUNCTION WITH NB JOB#: Q01367237-I1. No product keyword matched | 4 | Oct 16, 2026 |
| B | Sophia Sushi of Brooklyn Inc. NYC DOB building permits | 11 | Plumbing · Propose plumbing work of 1st floor commercial space of eating and drink establishment with partition work and finish work as per plan. No change in use, egress, or occupancy. No product keyword matched | 2 | Oct 16, 2026 |
| B | ST. MARGARET'S HOUSE NYC DOB building permits | 11 | General Construction · LOCALIZED EXTERIOR MASONRY REPAIRS, INCLUDING BRICK REBUILDING, MORTAR JOINT REPOINTING, SILL REPLACEMENT,AND CONCRETE SOUND TESTING AND PATCHING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 16, 2026 |
| B | MSquared NYC DOB building permits | 11 | Protection and Mechanical Methods · INSTALLATION OF TEMPORARY CHUTE FILED IN CONJUNCTION WITH INTERIOR DEMO # B00631022 No product keyword matched | 2 | Oct 16, 2026 |
| B | TRI-STAR CONSTRUCTION AND HOME IMPR NYC DOB building permits | 11 | General Construction · CONSTRUCTION OF A TWO STORY MIXED USE BUILDING No product keyword matched | 2 | Oct 16, 2026 |
| B | G. FIORE CONTRACTING LLC NYC DOB building permits | 11 | General Construction · Filed to address SWO, DOB and ECB violations. as listed. Restore existing residence to a single-family use. Mechanical and plumbing filed under subsequent applications. No product keyword matched | 1 | Oct 16, 2026 |
| B | H&B CONSTRUCTION SERVICES, INC NYC DOB building permits | 11 | Plumbing · RESTORE/REMOVE PLUMBING FIXTURE IN THE EXISTING COMMERCIAL SPACE AS PER THE PLAN FILED HEREWITH TO REMOVE ECB VIOLATIONS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 16, 2026 |
| B | 75 Livingston Street NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF 27TH FLOOR APARTMENT (27A), INCLUDING DEMOLITION AND CONSTRUCTION OF INTERIOR PARTITIONS, FINISHES AND CABINETRY. NO CHANGE TO USE, EGRESS OR OCCCUPANCY. No product keyword matched | 2 | Oct 16, 2026 |
| B | BRONX HOUSING INIATIVE LLC NYC DOB building permits | 11 | General Construction · herewith file renovation of existing three stories three dwelling unit apartment building as per plans ( windows and doors) . No change on use, occupancy or egress. No product keyword matched | 1 | Oct 16, 2026 |
| B | Oasis NY Development LLC NYC DOB building permits | 11 | General Construction · ALT-CO FILED TO CHANGE EXISTING PRIOR-TO-1968 CODE, CLASS 3 NFP, HACA DWELLING FROM 5 FAMILIES TO 3 FAMILIES. NEW CERTIFICATE OF OCCUPANCY TO BE OBTAINED. No product keyword matched | 1 | Oct 16, 2026 |