Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| C | Rainier Electricomm Seattle electrical permits | 4 | We are replacing a UPS for the emergency panel in Building D Basement. · Electrical No product keyword matched | 0 | Jun 22, 2026 |
| C | Canyon Creek Wiring Co Seattle electrical permits | 4 |
Inspect wiring DONE BY OTHERS · Electrical No product keyword matched |
| 0 |
| Jun 22, 2026 |
| C | Done Electric Seattle electrical permits | 4 | Disconnecting a subfeeder from "2011A "DADU panel to ":2011B" garage subpanel, adding a direct feder from meter pack to garage panel. · Electrical No product keyword matched | 0 | Jun 22, 2026 |
| C | RODDAN INDUSTRIAL LLC Seattle electrical permits | 4 | Complete controls retrofit of a Jack Tester. · Electrical No product keyword matched | 0 | Jun 22, 2026 |
| C | Nakon electric Seattle electrical permits | 4 | I installed a 9.24kw solar array. · Electrical No product keyword matched | 0 | Jun 22, 2026 |
| C | Silvios Plumbing Austin issued construction permits | 4 | Plumbing Permit · Interiors finish out for restaurant No product keyword matched | 0 | Jun 19, 2026 |
| C | Flow Plumbing Services, LLC Austin issued construction permits | 4 | Plumbing Permit · This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact.
Phase 3 - Demolition and renovation of new parlor area. No product keyword matched | 0 | Jun 19, 2026 |
| C | Empowering Electrical Solutions Seattle electrical permits | 4 | Extend existing circuits to add new lighting and outlets for commercial space. · Electrical No product keyword matched | 0 | Jun 19, 2026 |
| C | Prostat Services LLC Seattle electrical permits | 4 | 16 solar panels on roof of residence and 30KWH of battery storage. · Electrical No product keyword matched | 0 | Jun 19, 2026 |
| C | Level Up Commercial, LLC Austin issued construction permits | 4 | Building Permit · Finish out to existing mixed use bldg-suite 101 is an existing shell. Proposed bookstore with accessory coffee shop GIIVR requested. NO access control. No mechanical scope. No product keyword matched | 0 | Jun 18, 2026 |
| C | North Gable Contractors Austin issued construction permits | 4 | Building Permit · Reroof replacing like for like asphalt shingles. No product keyword matched | 0 | Jun 18, 2026 |
| C | Key Lime Construction Austin issued construction permits | 4 | Building Permit · Drywall kitchen bathrooms flooring & painting due to Fire/Water Damage for 5 Units
Unit 301 No product keyword matched | 0 | Jun 18, 2026 |
| C | PerezCruz Design and Con Austin issued construction permits | 4 | Building Permit · Demolition of an existing metal warehouse structure approximately 2499 square feet originally constructed circa 1955.
2026 022559 DA - Approved No product keyword matched | 0 | Jun 18, 2026 |
| C | NZP Construction LLC Austin issued construction permits | 4 | Building Permit · Condominium renovation includes kitchen bathrooms and bedrooms for Unit 2007 No product keyword matched | 0 | Jun 18, 2026 |
| C | Mend Electric Austin issued construction permits | 4 | Electrical Permit · Remodel for existing McDonalds.
Address is plain 2300 No Unit. No product keyword matched | 0 | Jun 18, 2026 |
| C | Less Equals More Inc Austin issued construction permits | 4 | Building Permit · ePlan: Commercial Expedited Review - Shell for Future Use (878 SF). No product keyword matched | 0 | Jun 18, 2026 |
| C | Orbital Plumbing LLC Austin issued construction permits | 4 | Plumbing Permit · Demolition of interior cmu walls hvac metal roof panel and aluminum storefront. New interior cmu wall hvac roof insulation TPO roof and aluminum storefront. No product keyword matched | 0 | Jun 18, 2026 |
| C | Perez-Cruz Construction Austin issued construction permits | 4 | Building Permit · Interior Non Structural Demolition No product keyword matched | 0 | Jun 18, 2026 |
| C | Building Abatement Demolition Co, Inc Austin issued construction permits | 4 | Building Permit · Demolition of Structures approx. 1400 sq ft Circa No product keyword matched | 0 | Jun 18, 2026 |
| C | JBG Plumbing Austin issued construction permits | 4 | Plumbing Permit · Plan: Commercial Expedited Review - [APPROVED] Interior Finish out of Shell Building to Create Restaurant (2162SF). No product keyword matched | 0 | Jun 18, 2026 |
| C | FIREPOWER INCORPORATED Seattle electrical permits | 4 | Adding 10 CCTV Cameras in hallways · Electrical No product keyword matched | 0 | Jun 18, 2026 |
| C | Ricci Residential Electrical LLC Seattle electrical permits | 4 | Complete Rewire of existing home 2700Sqft. New 200A overhead service and 40 space panel. · Electrical No product keyword matched | 0 | Jun 18, 2026 |
| C | Integrated Living Solutions Seattle electrical permits | 4 | Motorized Shades, Audio and Ethernet Network · Electrical No product keyword matched | 0 | Jun 18, 2026 |
| C | Seres Solutions, LLC Austin issued construction permits | 4 | Building Permit · 7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage.
(2nd floor building C) No product keyword matched | 0 | Jun 17, 2026 |
| C | UNBELIEVABLE AIR Austin issued construction permits | 4 | Mechanical Permit · Renovation of an entrance and lobby space within an existing office No product keyword matched | 0 | Jun 17, 2026 |
| C | Air Tech Solutions Austin issued construction permits | 4 | Mechanical Permit · Interior finish out of existing 2450 SF shell space to create business office use No product keyword matched | 0 | Jun 17, 2026 |
| C | BAE Electric, LLC Austin issued construction permits | 4 | Electrical Permit · Upgrading power to whole building to 800B No product keyword matched | 0 | Jun 17, 2026 |
| C | Omar Zavala Contractor Austin issued construction permits | 4 | Building Permit · Repair for exterior stairs at existing MF building. No product keyword matched | 0 | Jun 17, 2026 |
| C | All Masters Plumbing Austin issued construction permits | 4 | Mechanical Permit · Interior remodel No product keyword matched | 0 | Jun 17, 2026 |
| C | PreFix, Inc Austin issued construction permits | 4 | Mechanical Permit · Replacement of complete existing central heat and air system with or without duct work HVAC system replacement for 745 E Oltorf St (Mitzi Macomber) No product keyword matched | 0 | Jun 17, 2026 |
| C | Right Way Facility Services of Texas LLC Austin issued construction permits | 4 | Building Permit · Tenant finish out of an existing lease space for a restaurant. No product keyword matched | 0 | Jun 17, 2026 |
| C | W.L. Hall Company Austin issued construction permits | 4 | Building Permit · Replace skylight translucent panels. No product keyword matched | 0 | Jun 17, 2026 |
| C | Tex Tech Mechanical Austin issued construction permits | 4 | Mechanical Permit · This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact.
Phase 2 - involves demolition and renovation of new reception trade room parlor retail and hydration station areas. Finish upgrades to porte cochrere entry elevator lobby and corridor. No product keyword matched | 0 | Jun 17, 2026 |
| C | MWH CONSTRUCTORS Austin issued construction permits | 4 | Building Permit · Walnut Creek Wastewater Treatment Plant Headworks Improvements. No product keyword matched | 0 | Jun 17, 2026 |
| C | A&D Electrical Services Inc Seattle electrical permits | 4 | Adding 2 circuits for Heat Pumps · Electrical No product keyword matched | 0 | Jun 17, 2026 |
| C | Obot Electric LLC Seattle electrical permits | 4 | Full rewire and installation of new electrical. · Electrical No product keyword matched | 0 | Jun 17, 2026 |
| C | Window Nation LLC**Main** Austin issued construction permits | 4 | Building Permit · Remove and replace 7 windows and 1 sliding glass door like for like no structural changes. Existing multifamily unit. No product keyword matched | 0 | Jun 16, 2026 |
| C | Connor Construction LLC Austin issued construction permits | 4 | Building Permit · Tenant finish-out with the installation of new non-structural partitions new millwork new light fixtures and new wall and ceiling finishes to create a new Uncommon James store. No product keyword matched | 0 | Jun 16, 2026 |
| C | Future Electric Austin issued construction permits | 4 | Building Permit · Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS. No product keyword matched | 0 | Jun 16, 2026 |
| C | Shade Structures Austin issued construction permits | 4 | Building Permit · New shade structures over existing Impervious Cover parking lot Exterior construction CP1 CP2 CP3 CP4 and CP5 No product keyword matched | 0 | Jun 16, 2026 |
| C | Future Enterprises Inc Austin issued construction permits | 4 | Electrical Permit · Modifying Existing Switch Gear to Install Backup Generator receptacles to the outside of the building. We are not installing or Modifying the Generators on site. Just the Ability to hook up a portable one. Circuit is to MSB with Kirk key. No ATS. No product keyword matched | 0 | Jun 16, 2026 |
| C | Waterloo Electrical and Construction LLC Austin issued construction permits | 4 | Electrical Permit · Change of Occupancy from Residential to Commercial and Permitting of an Existing 545 SF Unpermitted Addition No product keyword matched | 0 | Jun 16, 2026 |
| C | A/C Express Austin issued construction permits | 4 | Mechanical Permit · REMODEL EXISTING THEATRE SPACE ADD SLOPE FLOOR FOR ELEVATED SEATING AND NEW PARTITION FOR GREEN ROOM. No product keyword matched | 0 | Jun 16, 2026 |
| C | Xact Warehouse Solutions Austin issued construction permits | 4 | Building Permit · DESIGN - RACKING SYSTEM IN WAREHOUSE. No product keyword matched | 0 | Jun 16, 2026 |
| C | Signature Audio Video Seattle electrical permits | 4 | Wire for Data, Cameras, Point of Sale System, and Coax runs for TV's · Electrical No product keyword matched | 0 | Jun 16, 2026 |
| C | Sunrise Electric LLC Seattle electrical permits | 4 | adding 48 amp hardwired ev charger to customers house · Electrical No product keyword matched | 0 | Jun 16, 2026 |
| C | General Construction Company Seattle electrical permits | 4 | INSTALLING 200A FEEDER, FROM EXISTING 200A DISONNECT IN BRICK SHED TO RACK MOUNTED 200A PANEL AT EXTERIOR OF TREATMENT CONTAINER.
INSTALLING SERVICE RECEPTACLE · Electrical No product keyword matched | 0 | Jun 16, 2026 |
| C | Best Coast Electric LLC Seattle electrical permits | 4 | I am replacing old knob and tube throughout the house, and pulling new circuits except for the kitchen and the new heat pump. Those have updated wiring. Replacing meter and panel. Running power for a future EV charger. Homeowners don't plan to use it. · Electrical No product keyword matched | 0 | Jun 16, 2026 |
| C | Crystal hospitality Group, Inc Austin issued construction permits | 4 | Building Permit · Non- structural interior renovation-Meeting space and Fitness Center-Replacement of soft goods seating and lighting. Wall covering and flooring changes No product keyword matched | 0 | Jun 15, 2026 |
| C | Biggs Plumbing Co, Inc Austin issued construction permits | 4 | Plumbing Permit · Construction of podium swimming pool associated multifamily building (2020-016857 PR) No product keyword matched | 0 | Jun 15, 2026 |