Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | FM95 NY LLC NYC DOB building permits | 11 | Sign · Erect advertising LED sign on wall- copy changes from time to time-Cube LED Sign #1--Cube Ceiling-(structure filed under separate application Q01449681). No change of use, egress or occupancy No product keyword matched | 4 | Oct 19, 2026 |
| B | AULDBRASS PARTNERS |
| 11 |
Structural · STRUCURAL WORK AS PER PLANS No product keyword matched |
| 3 |
| Oct 19, 2026 |
| B | DTO ALTERATIONS LLC NYC DOB building permits | 11 | Supported Scaffold · INSTALL MEDIUM DUTY SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. No product keyword matched | 3 | Oct 19, 2026 |
| B | Sisu Garden Corporation NYC DOB building permits | 11 | Structural · Exterior wall openings and steel lintels installation. No product keyword matched | 1 | Oct 19, 2026 |
| B | TK CONSTRUCTION OF NY,INC NYC DOB building permits | 11 | Structural · Structural work associated with the new light-gauge steel and LVL framing for the proposed opening at the 1st floor, and a new lintel for the proposed opening at the basement existing interior wall. No product keyword matched | 3 | Oct 19, 2026 |
| B | RETTNER REALTY NYC DOB building permits | 11 | Mechanical Systems · INSTALL EXHAUST SYSTEM No product keyword matched | 1 | Oct 19, 2026 |
| B | VERSON BUILDING SERVICES NYC DOB building permits | 11 | Structural · Repair bathroom floor in apartment 4D. No product keyword matched | 1 | Oct 19, 2026 |
| B | Colliers International REMS US, LLC NYC DOB building permits | 11 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 1 | Oct 19, 2026 |
| B | BSD 4422 AVENUE M LLC NYC DOB building permits | 11 | General Construction · Renovation on an existing one-family, two-story and attic dwelling. Partition work as per plan. No change in use, occupancy or exit. No product keyword matched | 2 | Oct 19, 2026 |
| B | BUCKMILLER AUTO.SPKLR.COR NYC DOB building permits | 11 | Sprinklers · Filing herewith sprinkler work at existing 11th floor space, MZ Wallace. No change in use, egress or occupancy. No product keyword matched | 2 | Oct 19, 2026 |
| B | B&H CONTRACTING CORP NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS IN CONJUNCTION WITH JOB #X00804817 No product keyword matched | 3 | Oct 19, 2026 |
| B | MANRE LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT LIGHT FIXTS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT. No product keyword matched | 1 | Oct 19, 2026 |
| B | GRATTAN DESIGN STUDIOS NYC DOB building permits | 11 | Plumbing · This application is for Plumbing work as indicated on the plans submitted herewith. No change in use, egress, or occupancy. No product keyword matched | 1 | Oct 19, 2026 |
| B | ASW EXPEDITING SERVICES NYC DOB building permits | 11 | Sprinklers · SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01363916-I1 No product keyword matched | 7 | Oct 19, 2026 |
| B | HECAN CONSTRUCTION CORP NYC DOB building permits | 11 | Mechanical Systems · PROPOSED MECHANICAL WORK TO INSTALL SPLIT AC UNITS AS PER PLAN. IN CONJUNCTION WITH GC JOB #B01283191-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 19, 2026 |
| B | Original GS Contracting Corp NYC DOB building permits | 11 | Structural · PROPOSED INTERIOR RENOVATION AT CELLAR, 1ST & 2ND FLOOR DUE TO FIRE ONLY THE 1ST FLOOR STRUCTURE WILL BE REPLACED IN KIND, CELLAR, 2ND AND ROOF STRUCTURES ARE TO REMAIN NEW BALCONY AT 2ND FL ONLY NO CHANGE OF USE, BULK, EGRESS, AND OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | STANEX CONSTRUCTION CORP NYC DOB building permits | 11 | Construction Fence · Construction fence filed in conjunction with the NB application #X01287248-I1 No product keyword matched | 1 | Oct 19, 2026 |
| B | CL DESIGN AND BUILD CORP NYC DOB building permits | 11 | Construction Fence · Installation of a 8 Ft temp Construction Wood Fence at lot 9 and 10 (vacate). No product keyword matched | 2 | Oct 19, 2026 |
| B | CUBE BUILD GROUPS INC NYC DOB building permits | 11 | General Construction · Repair existing 2nd floor wood balcony by adding supplemental framing and connectors. Existing ledger, posts, and supporting remain undisturbed. No change in use, occupancy and egress. No product keyword matched | 1 | Oct 19, 2026 |
| B | Helm Equities NYC DOB building permits | 11 | Curb Cut · Curb Cut 1: Easterly side of Van Duzer Street 160.90' south of Victory Boulevard. Thence south along Van Duzer Street 28 feet constructing a 23-foot curb cut and two (2) 2.5-foot splays as per NYCDOT H-1015. No product keyword matched | 3 | Oct 19, 2026 |
| B | ELITE HOME INTERIORS INC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF APARTMENT 16F. INCLUDING MINOR LAYOUT MODIFICATIONS, REPLACE OF PLUMBING FIXTURES, NEW LIGHTING, NEW FINISHES. NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | GM ENTERPRISES ONE INC NYC DOB building permits | 11 | General Construction · Interior renovation of an existing commercial space. No changes to use, occupancy, or egress. No product keyword matched | 3 | Oct 19, 2026 |
| B | JAKIR SBM GROUP INC NYC DOB building permits | 11 | Construction Fence · FILING FOR TEMPORARY CONSTRUCTION FENCE No product keyword matched | 3 | Oct 19, 2026 |
| B | William R. Berkley Foundation NYC DOB building permits | 11 | Foundation · Foundation work filed in conjunction with building renovation under job number M01350376 . No product keyword matched | 9 | Oct 19, 2026 |
| B | R H CONSTRUCTION USA INC NYC DOB building permits | 11 | Mechanical Systems · APPLICATION FILED FOR MECHANICAL WORK TYPE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR ANY OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | EOM DEVELOPERS NYC DOB building permits | 11 | Mechanical Systems · Filing Mechanical application subsequent to primary job number B01138895-I1. No product keyword matched | 5 | Oct 19, 2026 |
| B | LIVING RIVER LLC NYC DOB building permits | 11 | Plumbing · RENOVATION OF RESTAURANT TO INCLUDE NEW PLUMBING FIXTURES. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION No product keyword matched | 2 | Oct 19, 2026 |
| B | CAURD Brooklyn Corp NYC DOB building permits | 11 | Construction Fence · INSTALL NEW TEMPORARY CONSTRUCTION FENCE TO REPAIR/REPLACE STOREFRONT. GC JOB B01427835-I1. No product keyword matched | 2 | Oct 19, 2026 |
| B | 68-21 64th Place LLC NYC DOB building permits | 11 | Plumbing · Plumbing work as per plans filed herewith. No change in use, egress and occupancy. No product keyword matched | 2 | Oct 19, 2026 |
| B | CONEY MANGEMENT, LLC NYC DOB building permits | 11 | Boiler Equipment · REPLACE BOILER AND REINSTALL EXISTING GAS/OIL BURNER. No product keyword matched | 5 | Oct 19, 2026 |
| B | AMERICA STATE INC NYC DOB building permits | 11 | Structural · ALT-1 FILING FOR RENOVATION OF EXISTING 1-FAMILY HOUSE WITH ADDING A SECOND FLOOR AND REAR EXTENSION. No product keyword matched | 9 | Oct 19, 2026 |
| B | HONEYBEE CONSTRUCTION NYC DOB building permits | 11 | General Construction · MASONRY STEPS REPAIR AND CONCRETE RESURFACING IN FRONT YARD. THIS JOB IS FILED TO REMEDY OATH/ECB VIOLATION 39197324L. No product keyword matched | 2 | Oct 19, 2026 |
| B | HIGHQUALITY CONSTRUCTION VNW, INC NYC DOB building permits | 11 | Plumbing · FILE PLUMBING WORK WITH INSTALLATION OF NEW PLUMBING FIXTURES AND GAS APPLIANCE AS PER PLAN. THIS APPLICATION IS IN CONJUNCTION WITH GC#B01464802-I1. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 4 | Oct 19, 2026 |
| B | OMEGA STUCCO CORP NYC DOB building permits | 11 | Construction Fence · Temp. Construction Fence No product keyword matched | 4 | Oct 19, 2026 |
| B | GOODGRAM NYC DOB building permits | 11 | General Construction · INTERIOR CONSTRUCTION WORK ON THE FIRST FL TO INCLUDE NEW PARTITIONS, DOORS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | Kriya Rishi LLC NYC DOB building permits | 11 | General Construction · EXISTING FIRST FLOOR COMMERCIAL RETAIL STORE TO BE RENOVATED INCLUDING NEW NON-LOAD BEARING PARTITIONS, FINISHED FLOORS AND CEILING, AND ADA COMPLIANT BATHROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | FRANCMEN REALTY NYC DOB building permits | 11 | Mechanical Systems · PROPOSED INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE FOR AN EATING & DRINKING ESTABLISHMENT AT THE FIRST FLOOR LEVEL AND STORAGE AT THE CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | meiwen llc NYC DOB building permits | 11 | General Construction · PROPOSED EXTERIOR RENOVATION AT THE EXISTING SIDE YARD. REMOVE THE EXISTING CANOPY AT THE SIDE YARD AND FRONT YARD TO CURE ECB VIOLATIONS #35421727Y AND #39071745X. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BULK. No product keyword matched | 1 | Oct 19, 2026 |
| B | Belisarius Group LLC NYC DOB building permits | 11 | General Construction · Tenant infill into existing shell building with basement / cellar. New work includes adding partitions, mechanical, electrical, and plumbing. No product keyword matched | 2 | Oct 19, 2026 |
| B | Yong Zheng LLC NYC DOB building permits | 11 | Plumbing · PLUMBING WORK OF PROPOSED COMMERCIAL SPACE ON 1ST FLOOR WITH, REPLACE BATHROOM FIXTURES AS PER PLAN. TO ADDRESS ECB VIOLATION 39199512H, 39199511X. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 19, 2026 |
| B | LEON D. DEMATTEIS CONST NYC DOB building permits | 11 | Construction Fence · Site Fence to capture project site - NYC Borough Based Jail - Queens Facility. No product keyword matched | 1 | Oct 19, 2026 |
| B | Peoples Firehouse Inc. NYC DOB building permits | 11 | Structural · INTERIOR RENOVATION ON BASEMENT AND 1ST FLOOR ONLY FOR EXISTING 3 STORY 3 FAMILY DWELLING. NO CHANGE IN USE, EGRESS, OCCUPANCY AND BULK. No product keyword matched | 1 | Oct 19, 2026 |
| B | ESQUEA INNOVATIONS NYC DOB building permits | 11 | General Construction · removal of non-bearing part, add new non bearing partitions in the living rm, kit & master bedroom. also, mod. to ceiling, wall & flooring. minor duct work and to add humidifier. pl to be filed under separ. app. - apt. 88. no change in use, egress or occ. No product keyword matched | 1 | Oct 19, 2026 |
| B | SACRED HEART - ST. STEPHEN RC CHURC NYC DOB building permits | 11 | Mechanical Systems · removal of existing HVAC system and install new HVAC and Ventilation system for the building as per plans , no change in use, egress or occupancy No product keyword matched | 1 | Oct 19, 2026 |
| B | LENOX COURT CONDOMINIUM NYC DOB building permits | 11 | General Construction · RELOCATE/EXTEND BOILER DOUBLEWALL FLUE. RELOCATE/EXTEND 3 FIREPLACE FLUES. BOTH IN CONJUNCTION WITH NB M08013299. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | U.S. GENERAL CON & PAINTING NYC DOB building permits | 11 | General Construction · To remove the existing studio apartment from the basement and restore the 2-car garage as per the plan. No change to use, egress, or occupancy under this application. No product keyword matched | 1 | Oct 19, 2026 |
| B | OBJECT DESIGN INC NYC DOB building permits | 11 | General Construction · Filing application for removal of one non- structural interior wall partition at second floor. No change in use, egress or occupancy. No product keyword matched | 1 | Oct 19, 2026 |
| B | GARY RYAN HOME SPECIAL.IN NYC DOB building permits | 11 | Mechanical Systems · REMOVE SHOWER AND SINK IN THE CELLAR. No product keyword matched | 1 | Oct 19, 2026 |
| B | status auto group NYC DOB building permits | 11 | Plumbing · ONE FAMILY INTERIOR PLMBING No product keyword matched | 1 | Oct 19, 2026 |
| B | 50 PINE STREET CONDOMINIUM NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR FACADE REPAIRS TO COMPLY WITH LOCAL LAW11 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |