Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | ROC EAST LLC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF PLUMBING & SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 2 | Oct 19, 2026 |
| B | T.S.M. MECHANICAL CORP NYC DOB building permits |
| 11 |
Mechanical Systems · Removal of existing mechanical system. Provide new HVAC system, new gas boiler, hot water for perimeter heating system and domestic water heating; provide exhaust fans for emergency smoke removal of elevator shaft and ceiling exhaust fans in restroom. No product keyword matched |
| 3 |
| Oct 19, 2026 |
| B | 80-164 REALTY, LLC NYC DOB building permits | 11 | Mechanical Systems · Mechanical work in conjunction to alteration application under job# Q01353055-I1 No product keyword matched | 1 | Oct 19, 2026 |
| B | KIOP FOREST AVE L.P. NYC DOB building permits | 11 | Sign · ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - HAIR ESSENTIALS SALON. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 6 | Oct 19, 2026 |
| B | 310 LINDEN ST LLC NYC DOB building permits | 11 | Mechanical Systems · FILE HEREWITH MECHANICAL WORK FOR 3-STORY MIXED USE BUILDING IN CONJUCTION TO JOB# B01190426-I1 No product keyword matched | 1 | Oct 19, 2026 |
| B | COOPER PROPERTY 2 LLC NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF TEMPORARY 8'-0 HIGH CONSTRUCTION FENCE No product keyword matched | 2 | Oct 19, 2026 |
| B | Garthchester Realty Associates NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF MATERIAL HOIST TO BE USED TO BRING MATERIALS & DEBRIS FROM GROUND LEVEL & LOWER ROOF TO MAIN ROOF LEVEL FOR ROOF REPAIRS. No product keyword matched | 3 | Oct 19, 2026 |
| B | CROSS MANAGEMENT CORP NYC DOB building permits | 11 | General Construction · Demolition work as per plans. No change to use, egress or occupancy. No product keyword matched | 1 | Oct 19, 2026 |
| B | STEINER BUILDING NYC, LLC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 19, 2026 |
| B | Elpeal 120th Corp NYC DOB building permits | 11 | Construction Fence · APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE AS PER PLAN. No product keyword matched | 1 | Oct 19, 2026 |
| B | PHD SERVICES CORP NYC DOB building permits | 11 | Plumbing · Plumbing and sprinkler work associated with conversion of Medical Offices to Community Center No product keyword matched | 1 | Oct 19, 2026 |
| B | MAGEN DAVID YESHIVA NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF 300 PSF SIDEWALK SHED AND MATERIAL STORAGE AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 10 | Oct 19, 2026 |
| B | EKB SERVICES INC NYC DOB building permits | 11 | Structural · HEREWITH FILING STRUCTURAL AS SUBSEQUENT FILING TO ALT-2 JOB #Q00670700 No product keyword matched | 5 | Oct 19, 2026 |
| B | Malex 327 LLC NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 5 | Oct 19, 2026 |
| B | PURE WOMENS HEALTH CENTER NYC DOB building permits | 11 | Mechanical Systems · filing for mechanical work No product keyword matched | 2 | Oct 19, 2026 |
| B | JAVERI CAPITAL NYC DOB building permits | 11 | Supported Scaffold · TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. No product keyword matched | 5 | Oct 19, 2026 |
| B | BEST PLUMBING & HVAC INC NYC DOB building permits | 11 | Plumbing · Proposed plumbing system works in conjunction with DOB NOW Job #B01294072-I1 as per plan, no change in use, egress and occupancy. No product keyword matched | 2 | Oct 19, 2026 |
| B | SUPER K BUILDERS NYC DOB building permits | 11 | Mechanical Systems · MS APPLICATION HEREBY FILED IN CONJUCTION TO JOB NUMBER B01126496 No product keyword matched | 1 | Oct 19, 2026 |
| B | VMC PLUMBING HEATING INC NYC DOB building permits | 11 | Boiler Equipment · FILE BOILER EQUIPMENT FOR MIXED-USE BUILDING TO REGISTER 1 BOILERS AT CELLAR AS PER PLAN. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPANCY. No product keyword matched | 3 | Oct 19, 2026 |
| B | S.I.H. AUTOMOTIVE PARTNERS LLC DBA NYC DOB building permits | 11 | Sprinklers · Modification of sprinkler system to accomodate a renovation to an existing Honda car dealership. Sprinkler work is required for all 3 floors-Cellar, 001, 002 and will involve a combination of new and rellocated sprinkler heads. No change to Use, E. or Occ No product keyword matched | 1 | Oct 19, 2026 |
| B | OLYMPIC TOWER CONDOMINIUM NYC DOB building permits | 11 | General Construction · Interior renovation of apartment 26C, including new minor partitions, finish materials on the floor, wall and ceiling. All as per accompanying plans. No chance in use, egress or occupancy No product keyword matched | 1 | Oct 19, 2026 |
| B | REDHEAD PAINTING NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR THE INTERIOR RENOVATION OF ONE APARTMENT IN AN EXISTING 16 STORY, MIXED-USE BUILDING. NO OTHER WORK PROPOSED UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 19, 2026 |
| B | 255 EAST HOUSTON MANAGER, LLC NYC DOB building permits | 11 | Full Demolition · TO BE DEMOLISHED BY HAND WITH MECHANICAL ASSIST AND FULL MECHANICAL MEANS No product keyword matched | 4 | Oct 19, 2026 |
| B | A & C HEATING SERVICES IN NYC DOB building permits | 11 | General Construction · REPLACE DRAFT INDUCER AND EXTEND SPECIAL GAS VENT. No product keyword matched | 1 | Oct 19, 2026 |
| B | CONEY ISLAND PHASE 3 NYC DOB building permits | 11 | Structural · Structural work as per plans filed No product keyword matched | 1 | Oct 19, 2026 |
| B | CADMAN ASSOCIATES LLC NYC DOB building permits | 11 | Plumbing · Plumbing work as per plans filed. No product keyword matched | 4 | Oct 19, 2026 |
| B | CENTER FOR JEWISH HISTORY NYC DOB building permits | 11 | Sidewalk Shed · Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 19, 2026 |
| B | SAG CONTRACTING CORP. NYC DOB building permits | 11 | General Construction · Remove and replace pavement, staircases, wood siding & guard rails. install new deck and enlarge windows in rear yard of 2 family dwelling. Work done to address violation #041822C22-01117. THERE IS NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. No product keyword matched | 1 | Oct 19, 2026 |
| B | HEIGHTS REAL ESTATE ADVISORS NYC DOB building permits | 11 | Construction Fence · INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 19, 2026 |
| B | COMPAS CONSTRUCTION OF NY CO INC. NYC DOB building permits | 11 | Plumbing · Herewith filing plumbing and sprinkler systems associated with new 6-story residential building. No product keyword matched | 3 | Oct 19, 2026 |
| B | A & R HOME IMPROVEMENT & NYC DOB building permits | 11 | Construction Fence · PROPOSED TEMPORARY CONSTRUCTION FENCE. No product keyword matched | 4 | Oct 19, 2026 |
| B | 157 W 57 LLC / 88 NYC DOB building permits | 11 | Structural · STRUCTURAL WORK AS PER PLANS. SUPPORT OF NEW CHANDELIER, WALL FEATURE AND LIGHTS FROM SLAB ABOVE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 19, 2026 |
| B | FAST CONTRACTING INC NYC DOB building permits | 11 | General Construction · Application to repair the front facade of the existing 3 story residential building. No change in Use, Occupancy, or egress. No product keyword matched | 1 | Oct 19, 2026 |
| B | Sterling Organization NYC DOB building permits | 11 | Curb Cut · INSTALL 14.5 LINEAR FOOT CURB CUT IN CONJUNCTION WITH NB #X00916944. No product keyword matched | 4 | Oct 19, 2026 |
| B | E&G INTERIOR CORP NYC DOB building permits | 11 | General Construction · CONSTRUCTION RENOVATION OF APARTMENT 9J. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | 27-51 JACKSON AVE LLC NYC DOB building permits | 11 | Sign · PROPOSE NEW ILLUMINATED BUSINESS SIGN FOR EXISTING PARTIAL FIRST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE,EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | ASC METRO FIRE INSP LLC NYC DOB building permits | 11 | Sprinklers · Relocation of existing sprinkler heads to conform to new space layout. No product keyword matched | 1 | Oct 19, 2026 |
| B | YUNG WAY CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · Interior renovation in Cellar, 1st and 2nd floor. No change in use, occupancy or egress. No product keyword matched | 2 | Oct 19, 2026 |
| B | ROYAL BLUE MANAGEMENT NYC DOB building permits | 11 | General Construction · INSTALL CONICAL REDUCER FOR EXISTING CHIMNEY EXTENSION. No product keyword matched | 3 | Oct 19, 2026 |
| B | HEARTSHARE HUMAN SERVICES OF NEW YO NYC DOB building permits | 11 | General Construction · INSTALLATION OF NON-ILLUMINATED ACCESSORY STOREFRONT BUSINESS AWNING, NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 1 | Oct 19, 2026 |
| B | RETROFIT PLGB & HTG INC NYC DOB building permits | 11 | Plumbing · RENOVATION OF EXISTING 2-FAMILY . NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 1 | Oct 19, 2026 |
| B | CATHOLIC CHARITIES DIOCESE OF BROOK NYC DOB building permits | 11 | Construction Fence · Filing for Construction Fence No product keyword matched | 3 | Oct 19, 2026 |
| B | NOBLE PLUMBING & HEATING NYC DOB building permits | 11 | Boiler Equipment · REPLACE EXISTING 20 HP GAS-FIRED HIGH PRESSURE STEAM BOILER (NYC BOILER #: 104909-01) WITH NEW 15 HP GAS-FIRED HIGH PRESSURE STEAM BOILER AT EXIST'G BOILER ROOM AT FIRST FLOOR AS PER PLAN. No product keyword matched | 2 | Oct 19, 2026 |
| B | QuanLi North Parc LLC NYC DOB building permits | 11 | Sprinklers · Installation of sprinkler system for the tenant fitout area. No product keyword matched | 3 | Oct 19, 2026 |
| B | AKA Nomad Hotel NYC DOB building permits | 11 | Boiler Equipment · DIRECT REPLACEMENT OF (2) EXISTING GAS FIRED BOILERS No product keyword matched | 4 | Oct 19, 2026 |
| B | EMPIRE HOME SERVICES CORP NYC DOB building permits | 11 | Construction Fence · HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS. No product keyword matched | 4 | Oct 19, 2026 |
| B | 16328 PROPERTY LLC NYC DOB building permits | 11 | Construction Fence · INSTALL NEW TEMPORARY CONSTRUCTION FENCE. No product keyword matched | 1 | Oct 19, 2026 |
| B | L & Z RESTORATION CORP NYC DOB building permits | 11 | General Construction · REMOVAL AND REPLACEMENT OF EXISTING ROOFING SYSTEM INCLUDING ROOF MEMBRANE, INSULATION, VAPOR BARRIER, FLASHINGS, DRAINS, CURBS, PENETRATIONS AND ASSOCIATED ROOFING COMPONENTS. No product keyword matched | 6 | Oct 19, 2026 |
| B | Metro Management Dev. NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 5 | Oct 19, 2026 |
| B | JDS MGMT NYC DOB building permits | 11 | General Construction · INTERIOR ALTERATION TO COMBINE APARTMENTS 5A, 5B AND 6 INTO 1 APARTMENT No product keyword matched | 2 | Oct 19, 2026 |