Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | SEA-DAR ENTERPRISE NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 3 | Oct 21, 2026 |
| B | J&S WATERPROOFING LLC |
| 11 |
General Construction · Parapet reconstruction and facade masonry repairs to address leak repair as per filed plans herewith. No change in use, egress, or occupancy. No product keyword matched |
| 4 |
| Oct 21, 2026 |
| B | N&K PLMBNG AND HTNG CORP NYC DOB building permits | 11 | Plumbing · CONVERT 2 FIXTURE POWDER ROOM TO 3 FIXTURE BATHROOM IN THE FIRST FLOOR, ADD 2 FIXTURE POWDER ROOM IN THE CELLAR No product keyword matched | 1 | Oct 21, 2026 |
| B | MYBOYSREALTY NYC DOB building permits | 11 | Plumbing · INSTALLATION OF NEW (2) GAS COOKING EQUIPMENT FOR A COMMERCIAL KITCHEN, PLUMBING FIXTURE AS PER PLANS.NO CHANGE USE EGRESS No product keyword matched | 1 | Oct 21, 2026 |
| B | 1189 JEFFERSON LLC NYC DOB building permits | 11 | General Construction · PROPOSED 3-FAMILY 4-STORY BUILDING WITH VERTICAL ENLARGEMENT AND GENERALCONSTRUCTION WORK. OBTAIN NEW CERTIFICATE OF OCCUPANCY No product keyword matched | 2 | Oct 21, 2026 |
| B | GRANDCORE CONSTRUCTION LL NYC DOB building permits | 11 | Foundation · PROPOSED 1 STORY REAR YARD HORIZONTAL ENLARGEMENT AND FRONT YARD SUNROOM RECONSTRUCTION. NEW ROOF TERRACE OVERENLARGEMENT. ASSOCIATED STRUCTURE AND FOUNDATION. NO CHANGE OF USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 21, 2026 |
| B | NORWAX ASSOCIATES INC NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade inspection/repair. No product keyword matched | 1 | Oct 21, 2026 |
| B | SEGA CONTRACTING CORP NYC DOB building permits | 11 | Sign · INSTALLATION OF NON-ILLUMINATED ACCESSORY BUSINESS DOUBLE-FACED PROJECTING WALL SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 21, 2026 |
| B | A.G.S IMPROVEMENTS INC NYC DOB building permits | 11 | General Construction · Second floor roof deck replacement as per plans filed herewith. no change to use, egress or occupancy. No product keyword matched | 1 | Oct 21, 2026 |
| B | NM MECHANICAL CORP NYC DOB building permits | 11 | Plumbing · Plumbing work as shown on plans filed herewith. Modification in plumbing system - sanitary, water, vent, and gas - for alteration in existing building in accordance with thew requirements of the 2022 NYC plumbing code. No change in use, egress, occupancy. No product keyword matched | 2 | Oct 21, 2026 |
| B | K PROPERTY GROUP NYC DOB building permits | 11 | General Construction · EXTERIOR FACADE CANOPY REMOVAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 21, 2026 |
| B | 267 PROPERTY NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 21, 2026 |
| B | CISCO NYC DOB building permits | 11 | Plumbing · PL WORK FILED IN CONJUNCTION WITH DOB NOW ALT CO, MH , ST. No product keyword matched | 1 | Oct 21, 2026 |
| B | Pistilli Management LLC NYC DOB building permits | 11 | General Construction · APPLICATION BEING FILED FOR BUILDING FACADE REPAIRS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Oct 21, 2026 |
| B | 426 VANDERBILT LLC NYC DOB building permits | 11 | Plumbing · RELOCATE AND INSTALL NEW PLUMBING FIXTURES IN CONJUNCTION WITH RENOVATIONS FILED UNDER GC APPLICATION #B00950618-I1. No product keyword matched | 4 | Oct 21, 2026 |
| B | PSG CONSTRUCTION CO., INC. NYC DOB building permits | 11 | Suspended Scaffold · Suspended Scaffold installation as per plans filed herewith. No product keyword matched | 2 | Oct 21, 2026 |
| B | TWIN MARQUIS NYC DOB building permits | 11 | General Construction · Interior alterations to cold storage facility include selective demolition, door and conveyor openings, steel lintels, temporary shoring, insulated panel walls and doors, and finishes. no change to use egress or occupancy No product keyword matched | 1 | Oct 21, 2026 |
| B | PATRICK ROSS NYC DOB building permits | 11 | Structural · Subsequent filing for proposed structural work for two story extension at the rear of the building including footings with a crawl space underneath. No Cellar floor is proposed at the extension. No product keyword matched | 2 | Oct 21, 2026 |
| B | 135-01 226TH STREET LLC NYC DOB building permits | 11 | Plumbing · FILED HEREWITH PLUMBING WORK TYPE IN CONJUNCTION WITH ALT-CO-NB APPLICATION #Q01418585-I1. No product keyword matched | 5 | Oct 21, 2026 |
| B | JONES LANG LASALLE AMERICAS INC. NYC DOB building permits | 11 | Mechanical Systems · mechanical work as shown on plans filed herewith. No change in use, egress or occupancy. No product keyword matched | 2 | Oct 21, 2026 |
| B | BUILDREAM LLC NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION OF EXISTING APARTMENT #3D. REMOVAL OF NON-BEARING PARTITIONS, NEW DUCTLESS AIR CONDITION SYSTEM. NEW INTERIOR FINISHES. NO CHANGE IN USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 21, 2026 |
| B | J.V.S. SPRINT ENTERPRISES NYC DOB building permits | 11 | Mechanical Systems · INTERIOR FIT OUT OF EXISTING COMMERCIAL SPACE INCLUDING PROPOSED NON-BEARING PARTITIONS. NO CHANGE OF EGRESS, OCCUPANCY OR USE. No product keyword matched | 2 | Oct 21, 2026 |
| B | FOUR STREETS COOL AIR INC NYC DOB building permits | 11 | Construction Fence · TEMPORARY FENCE No product keyword matched | 1 | Oct 21, 2026 |
| B | 39 Garden Plaza NYC DOB building permits | 11 | Mechanical Systems · This application is being made to replace the permit that was issued and subsequently withdrawn under Q01219336-S2. There is no proposed change in the scope of the work approved under Q01219336-S2, which was to legalize the replacement of HVAC equipment. No product keyword matched | 1 | Oct 21, 2026 |
| B | USPA 461 DEAN LLC NYC DOB building permits | 11 | Suspended Scaffold · Installation of suspended scaffold for facade work or inspection. No product keyword matched | 2 | Oct 21, 2026 |
| B | J AND J MEDIPIA PROPERTIES NYC DOB building permits | 11 | Structural · SUBSEQUENT FILING OF FOUNDATION/STRUCTURAL WORK IN CONJUNCTION WITH DOB#Q01185355-I1 (NEW 2-STORY COMMERCIAL BLDG.) No product keyword matched | 2 | Oct 21, 2026 |
| B | WMG RENOVATION CORP NYC DOB building permits | 11 | General Construction · INTERIOR RENOVATION IN 5C FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 2 | Oct 21, 2026 |
| B | Church of the Virgin Mary NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 1 | Oct 21, 2026 |
| B | PJ CONSTRUCTION & CONSU NYC DOB building permits | 11 | Full Demolition · Full Demolition of brick Garage in rear yard except party wall and foundation. No product keyword matched | 1 | Oct 21, 2026 |
| B | JEN MANAGEMENT CORP NYC DOB building permits | 11 | Boiler Equipment · REPLACE BOILER AND GAS/OIL BURNER. No product keyword matched | 1 | Oct 21, 2026 |
| B | 111 STARLIGHT CONTRACTING NYC DOB building permits | 11 | Structural · ST WORK FILED IN CONJUNCTION WITH DOB NOW GC, MH AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 21, 2026 |
| B | I & I PLUMBING CORP NYC DOB building permits | 11 | Plumbing · PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF EXISTING TOWNHOUSE. No product keyword matched | 1 | Oct 21, 2026 |
| B | Anpora Property Services, LLC NYC DOB building permits | 11 | General Construction · MASONRY RESTORATION, COPING STONE REPLACEMENT, STUCCO PATCHING, RESEALING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY No product keyword matched | 5 | Oct 21, 2026 |
| B | MONTES TRATTORIA NYC DOB building permits | 11 | Plumbing · INTERIOR RENOVATION TO EXISTING RESTAURANT & BAR No product keyword matched | 2 | Oct 21, 2026 |
| B | INTER-COUNTY MECHANICAL C NYC DOB building permits | 11 | Mechanical Systems · REPLACEMENT. NO CHANGE TO EGRESS, USE , OR OCCUPANCY. No product keyword matched | 2 | Oct 21, 2026 |
| B | DELPHINI CONTRACTING INC NYC DOB building permits | 11 | Structural · Vertical enlargement of existing residential building. Construct new roof framing and residential space. No change in use, occupancy classification, or dwelling unit count. Alteration filed to amend Certificate of Occupancy. No product keyword matched | 2 | Oct 21, 2026 |
| B | SKYLARK CONSTRUCTION CORP Austin issued construction permits, NYC DOB building permits | 11 | Building Permit · Minor interior remodel not to include BOH. Exterior remodel to bring to BK standards. No product keyword matched | 4 | Oct 21, 2026 |
| B | RACCOON CONSTRUCTION INC NYC DOB building permits | 11 | General Construction · RENOVATION OF EXISTING 2 FAMILY, 2 STORY W/ CELLAR RESIDENTIAL BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 4 | Oct 21, 2026 |
| B | CEREBRAL PALSY ASSN OF NYS NYC DOB building permits | 11 | General Construction · Removal and installation of interior non load bearing partitions, doors, fixtures and finishes at existing Basement Medical Office. No product keyword matched | 4 | Oct 21, 2026 |
| B | M RE VENTURES I REO LLC NYC DOB building permits | 11 | Plumbing · PLUMBING ALTERATION ASSOCIATED WITH GENERAL CONSTRUCTION.REPLACEMENT DUE TO FIRE DAMAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 21, 2026 |
| B | 521-533 WEST 57TH STREET ASSOCIATES NYC DOB building permits | 11 | General Construction · Facade repairs as per drawings. No change to use, egress or occupancy. No product keyword matched | 2 | Oct 21, 2026 |
| B | YOUNGHO PAE NYC DOB building permits | 11 | Mechanical Systems · (1) MECHANICAL SYSTEM DIRECT REPLACEMENT ON ROOF FOR EXISTING 1ST FLOOR STORE. NO CHANGE IN USE, OCCUPANCY AND STRUCTURE UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 21, 2026 |
| B | BPC MANAGEMENT CORP NYC DOB building permits | 11 | Plumbing · JOB FILED EXIST. COMMERCIAL STORE INSTALL NEW COOKING EQUIPMENT AND PLUMBING FIXTURE PER PLAN. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 2 | Oct 21, 2026 |
| B | EINHORN BUILDING, LLC NYC DOB building permits | 11 | General Construction · RECONSTRUCT BOILER ENCLOSURE No product keyword matched | 2 | Oct 21, 2026 |
| B | HRY CONSULTANTS INC NYC DOB building permits | 11 | General Construction · HEREWITH FILING FOR HORIZONTAL ENLARGEMENT AND INTERIOR RENOVATION. NOCHANGE IN USE EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 21, 2026 |
| B | MIRO BALAC INC NYC DOB building permits | 11 | Structural · RENOVATION OF EXISTING 2-FAMILY . NO CHANGE IN USE, OCCUPANCY, OR EGRESS. No product keyword matched | 3 | Oct 21, 2026 |
| B | PONTE GADEA NEW YORK, LLC NYC DOB building permits | 11 | Mechanical Systems · APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 3 | Oct 21, 2026 |
| B | SECBO DEVELOPMENT INC. NYC DOB building permits | 11 | General Construction · Building rehabilitation of 42 apts, new kitchen and bathrooms, new windows, refinishing apt. floors, scrape, patch & paint apt. walls/ceiling, new build entry/vest. doors, new mailboxes, exterior repair repairs. No change in use, egress or occupancy. No product keyword matched | 4 | Oct 21, 2026 |
| B | TEMCO CONSTRUCTION NY INC NYC DOB building permits | 11 | Sidewalk Shed · PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. No product keyword matched | 2 | Oct 21, 2026 |
| B | FTERE - FINKELSTEIN TIMBERGER EAST NYC DOB building permits | 11 | Plumbing · Replacement of plumbing fixtures in apartments 1F, 1H, 4F, 4G, 4H & 4J including removal of fixtures, minor repairs, and resolve ECB Violation 39118891J, etc. No product keyword matched | 1 | Oct 21, 2026 |