Companies with dated public signals, ranked by fit with your products.
| Tier | Company | Score | Latest signal | Signals 90d | Last signal |
|---|---|---|---|---|---|
| B | 132ND NYC LLC NYC DOB building permits | 11 | Plumbing · installation of underground piping for sanitary No product keyword matched | 2 | Oct 21, 2026 |
| B | HOMES R US SALES CORP NYC DOB building permits | 11 | Construction Fence · installation of fence |
| 1 |
| Oct 21, 2026 |
| B | LEGUCI PIPING&HEATING LLC NYC DOB building permits | 11 | Sprinklers · sprinkler application filed in subsequently with the Alt. CO application. Modify the existing sprinkler heads to accommodate the new wall layout. No product keyword matched | 8 | Oct 21, 2026 |
| B | EBM PLUMBING CORP NYC DOB building permits | 11 | Plumbing · Plumbing work for the renovation of the 5th floor, 6th Floor, & new 7th Floor as per plan. No product keyword matched | 5 | Oct 21, 2026 |
| B | PENINSULA CONSTRUCTION IN NYC DOB building permits | 11 | Mechanical Systems · MH WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS. No product keyword matched | 1 | Oct 21, 2026 |
| B | M & L MILEVOI NYC DOB building permits | 11 | General Construction · Facade repair project as per plans. No change in use, egress, or occupancy. No product keyword matched | 6 | Oct 21, 2026 |
| B | 575 ASSOCIATES LLC NYC DOB building permits | 11 | Sprinklers · Install fire sprinkler system as per plans. No product keyword matched | 5 | Oct 21, 2026 |
| B | GOLANI DEVELOPMENT GROUP NYC DOB building permits | 11 | Sprinklers · PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH NEW BUILDING # Q01205053-I1. 3 STORY WITH CELLAR , 3 FAMILY. No product keyword matched | 18 | Oct 21, 2026 |
| B | SHINDA MANAGEMENT CORPORATION NYC DOB building permits | 11 | Plumbing · CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS-FIRED ROOFTOP FURNACE UNIT WITH INDIRECT FIRED HEAT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 9 | Oct 21, 2026 |
| B | LONG ISLAND UNIVERSITY NYC DOB building permits | 11 | Mechanical Systems · Alt. MS filed subsequently with the alt. GC application. Modify existing and install new HVAC components. No product keyword matched | 1 | Oct 21, 2026 |
| B | BLUE TECH CONST. NY, CORP NYC DOB building permits | 11 | Suspended Scaffold · INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR & FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 1 | Oct 21, 2026 |
| B | GRAVITY CONSTRUCTION US INC NYC DOB building permits | 11 | Plumbing · INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH NB#421943277 No product keyword matched | 1 | Oct 21, 2026 |
| B | BAR CONSTRUCTION SERVICES NYC DOB building permits | 11 | General Construction · Renovation of an existing apartment on the 6th Floors. Work includes removal and installation of interior partitions, doors, ceilings convenience stairs and related finishes. No change in use, egress or occupancy. No product keyword matched | 2 | Oct 21, 2026 |
| B | DDS MECHANICAL FPS CORP NYC DOB building permits | 11 | Sprinklers · Installation of sprinkler/standpipe system in conjunction with NB Construction. No product keyword matched | 2 | Oct 21, 2026 |
| B | STRUCTUAL PRESV SYSTEM NYC DOB building permits | 11 | Suspended Scaffold · FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola No product keyword matched | 12 | Oct 21, 2026 |
| B | RESOLUTION REAL ESTATE NYC DOB building permits | 11 | Structural · SIDEWALK & SIDEWALK VAULT REPAIRS. CONCRETE & STEEL FRAMING REPAIRS, WATERPROOFING INSTALLATION, CAULKING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 14 | Oct 21, 2026 |
| B | KING HOIST AND SCAFFOLDING INC. NYC DOB building permits | 11 | Supported Scaffold · INSTALLATION OF STEEL PIPE SCAFFOLD STAIR-TOWERS AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. No product keyword matched | 12 | Oct 21, 2026 |
| B | TRUST MANAGEMENT NYC DOB building permits | 11 | General Construction · Repair and replace fire-damaged roofing components above apartment 3R No product keyword matched | 1 | Oct 21, 2026 |
| B | CHOICE NY MGMT NYC DOB building permits | 11 | General Construction · INSTALL CHIMNEY LINER. No product keyword matched | 4 | Oct 21, 2026 |
| B | LEVITES REALTY MANAGEMENT LLC NYC DOB building permits | 11 | Mechanical Systems · INSTALL ONE (1) REPLACEMENT ROOFTOP HVAC UNIT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. No product keyword matched | 2 | Oct 21, 2026 |
| B | L.F. DRISCOLL COMPANY LLC NYC DOB building permits | 11 | General Construction · HT-5 PEDS/OB: Interior demo of partitions and finishes to accommodate PEDIATRIC DEPARTMENT renovation as indicated on plans filed herewith. no change to use, egress or occupancy. No product keyword matched | 2 | Oct 21, 2026 |
| B | VERSUS PLBG AND HTG LLC NYC DOB building permits | 11 | Plumbing · APT 23L: REPLACE KITCHEN/BATH FIXTURES; CONVERT TUB TO SHOWER; INSTALL NEW 2-IN SHOWER WASTE; REPLACE WATER/SANITARY BRANCH PIPING AND SHUTOFFS BACK TO EXISTING RISERS. NO RISER, SHAFT-WALL OR SLAB WORK. No product keyword matched | 3 | Oct 21, 2026 |
| B | BUILDWELL NY INC NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. No product keyword matched | 14 | Oct 21, 2026 |
| B | DECORATIVE DESIGN CONSTRU NYC DOB building permits | 11 | General Construction · HEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 3. NO CHANGE TO USE OCCUPANCY OR EGRESS. PLUMBING WORK TO BE FILED UNDER AN LAA. No product keyword matched | 1 | Oct 21, 2026 |
| B | ERIC GOODMAN REALTY NYC DOB building permits | 11 | Mechanical Systems · Mechanical work for first floor tenant fitout No product keyword matched | 3 | Oct 21, 2026 |
| B | 36 EAST 31 COMPANY NYC DOB building permits | 11 | General Construction · APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. No product keyword matched | 2 | Oct 21, 2026 |
| B | 1477 YORKVILLE LLC NYC DOB building permits | 11 | General Construction · Accepted to be filed with Development HUB per consultation on 4/8/2022 with Scott Pavan. Construction of a new 15-story mixed-use building. No product keyword matched | 3 | Oct 21, 2026 |
| B | Shalom Stahler NYC DOB building permits | 11 | General Construction · NEW FOUR (4) STORY AND PENTHOUSE, FIFTEEN (15) DWELLING UNIT BUILDING No product keyword matched | 2 | Oct 21, 2026 |
| B | PRIME BUILDERS NY LLC NYC DOB building permits | 11 | General Construction · PROPOSED RENOVATION OF EXISTING APARTMENT WITH NEW PARTITIONS & FINISHES; REMOVED ABANDONED VENT ON ROOF AND SEAL UP. NO CHANGE IN USE, EGRESS AND OCCUPANCY. No product keyword matched | 1 | Oct 21, 2026 |
| B | Managing Comp DDR NYC DOB building permits | 11 | Plumbing · HERWWITH FILING FOR THE REPLACEMENT OF HOT WATER HEATER. NO CHANGE TO USE EGRESS OR OCCUPANCY No product keyword matched | 2 | Oct 21, 2026 |
| B | 5508- 95 LINDEN BLVD BROOKLYN LLC NYC DOB building permits | 11 | Protection and Mechanical Methods · Installation of temporary debris chute as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 2 | Oct 21, 2026 |
| B | DIG YOU OUT INC NYC DOB building permits | 11 | Construction Fence · Filing for fence job in conjunction to application number B00640854-I1 No product keyword matched | 1 | Oct 21, 2026 |
| B | Bay View PACT LLC NYC DOB building permits | 11 | Sprinklers · Install fire sprinkler system as per plans. No product keyword matched | 6 | Oct 21, 2026 |
| B | DIVISION ONE CONTRACTING NYC DOB building permits | 11 | General Construction · Modification of apt. 19B as shown on submitted plans. No change in occupancy, use or egress. No product keyword matched | 1 | Oct 21, 2026 |
| B | DOMOVOY LLC NYC DOB building permits | 11 | General Construction · REMOVAL OF INTERIOR NON LOAD-BEARING PARTITIONS, CEILINGS AND FLOORING. INSTALLATION OF NEW PARTITIONS AND DOORS. No product keyword matched | 8 | Oct 21, 2026 |
| B | RELIABLE GENERAL CONTRACTORS INC NYC DOB building permits | 11 | Plumbing · PLUMBING FILING IN CONJUNCTION WITH RENOVATION OF EXISTING TWO FAMILY DWELLING WITH REAR EXTENSION AND OBTAIN NEW CERTIFICATE OF OCCUPANCY No product keyword matched | 2 | Oct 21, 2026 |
| B | DREAMLAND CONSTRUCTION IN NYC DOB building permits | 11 | General Construction · APPLICATION IS BEING FILED FOR ECB & DOB VIOLATIONS CORRECTIONAL WORK. REMOVE CELLAR FLOOR PARTITIONS, REMOVE KITCHEN FROM CELLAR FLOOR, LEGALIZE 3 FIXTURE BATHROOM IN CELLAR TO COMPLY ECB VIOLATIONS #39187562H, 39187561X, 39187560Y' 39187559R,39187558P No product keyword matched | 2 | Oct 21, 2026 |
| B | S. TIEGER PLBG. CO., INC NYC DOB building permits | 11 | Plumbing · Replacement of hot water heating boiler. No change in use, egress, or occupancy. No product keyword matched | 1 | Oct 21, 2026 |
| B | 140 EAST 28 OWNERS CORP. NYC DOB building permits | 11 | Mechanical Systems · Installtion of VRF mini split system. No product keyword matched | 3 | Oct 21, 2026 |
| B | Wavecrest Management NYC DOB building permits | 11 | Sidewalk Shed · INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF. No product keyword matched | 4 | Oct 21, 2026 |
| B | 1515 46 LLC NYC DOB building permits | 11 | General Construction · Proposed 6 Story and cellar Community Facility Building No product keyword matched | 1 | Oct 21, 2026 |
| B | CUSHMAN & WAKEFIELD/ NUVEEN NYC DOB building permits | 11 | Mechanical Systems · Mechanical modifications as per plans No product keyword matched | 1 | Oct 21, 2026 |
| B | H.K. MECHANICAL SVC CORP NYC DOB building permits | 11 | Plumbing · Plumbing work as per the submitted plans in conjunction with the main Architectural application # B01371823-I1. No product keyword matched | 1 | Oct 21, 2026 |
| B | ALL STATE 12 GENERAL CON NYC DOB building permits | 11 | Protection and Mechanical Methods · Place & Use of an Articulating boom truck equipment for hoisting materials in conjunction of new Building construction as per NYC Chapter #33 of 2022 code. No change in Use, Egress or Occupancy under this application. No product keyword matched | 1 | Oct 21, 2026 |
| B | CANDOR MANAGEMENT GROUP NYC DOB building permits | 11 | Support of Excavation · Support of excavation in conjunction with the NB application #X01345034-I1. No product keyword matched | 6 | Oct 21, 2026 |
| B | FOUNTAIN HOUSE NYC DOB building permits | 11 | Sidewalk Shed · Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. No product keyword matched | 1 | Oct 21, 2026 |
| B | HINES INTEREST LP NYC DOB building permits | 11 | Plumbing · MINOR PLUMBING, SPRINKLER AND STANDPIPE work as per plans No product keyword matched | 9 | Oct 21, 2026 |
| B | SKYWAY DEVELOPMENT GROUP NYC DOB building permits | 11 | General Construction · ALTERATION TYPE 1 FOR CHANGE OF USE AND OCCUPANCY OF THE CELLAR FLOOR TO HEALTH AND FITNESSESTABLISHMENT UNDER ZR32-163(c)(2). SCOPE SHALL RESOLVE VIOLATIONS #35250580P & #35250579H. NO CHANGE IN BULK OR EGRESS No product keyword matched | 1 | Oct 21, 2026 |
| B | SERVICE TECH MECH&PLBG IN NYC DOB building permits | 11 | Boiler Equipment · REPLACEMENT BOILER AND REINSTALL EXISTING GAS/OIL BURNER. No product keyword matched | 2 | Oct 21, 2026 |
| B | RockSolid PM NYC DOB building permits | 11 | General Construction · Facade repair No product keyword matched | 1 | Oct 21, 2026 |